Detail NR1 ELEC/INST RM/KL/CM
2025-08-06
BAC-ROOM
Wahyu Adi Triono
Problem: Fabrication support rail mount BAC + Install Box Welding
Action:
Prepare cable tray at work shop. Install welding panel  at BAC and cable tray beside welding panel. Put cable power for welding at cable tray ( ADI & ANDRI & MUHAIMIN )

Status: done
Back to report list