2026-04-09
22 hours ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CKD-MOTOR
|
Painting Area CKD Motor
|
Do painting area motor at CKD with yellow color ( JAJAT & AIMAN )
|
|
2026-04-09
22 hours ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR service analyzer
|
Clean up flange probe-sample line-filter sample-diaphragm pump-filter balston from dirty of dust process use instrument air supply. Check function of humidity sensor and filter humidity result function humidity sensor normal and filter humidity good condition ( RIZAL & EVE AJI )
|
|
2026-04-09
22 hours ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-&-443-FN1
|
Continue Wiring control W83-WF1 & install panel power point
|
Do wiring control panel W83 WF1 and make hole for exhaust fan panel. Install panel of power point at 443 FN1 ( AGUS & MUHAIMIN )
|
|
2026-04-09
1 day ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Report PMR and WBI 30 Maret- 9 April 2026 (Re-Check)
|
Do complete data check sheet WBI grounding-arrester also make folder for WBI Electrical and Instrumentation Check I/O Sump pump Blending-Cooler-Coal Mill-Kiln ( JAJAT & ADI )
|
|
2026-04-08
1 day ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Report PMR and WBI 30 March - 8 April 2026
|
Do conplete data check sheet PMR analyzer-PMR hoist crane-PMR IR TAD-T scanner-CCTV-Camera burner-PMR critical motor Note make check sheet folder for WBI Elec & Inst & Check I/O & S. Pump Blending-Cooler-CM-Kiln also print out data check sheet ( JAJAT & ADI )
|
|
2026-04-06
2 days ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Prepare Wiring control FABA
|
Do wiring control WF of FABA ( AGUS & MUHAIMIN )
|
|
2026-04-07
2 days ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-BL1
|
Issue LS vibration 11 mm/s continue replace bearing and install motor
|
Replace bearing motor with use heater bearing. Install motor at site. Test function motor , measure vibration and noise motor result vibration below 4 mm/s and noise below 2 gE ( AGUS & MUHAIMIN & ANDRI & DADANG & JAJAT & RIZAL )
|
|
2026-04-07
2 days ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR service analyzer
|
Clean up flange probe-probe-filter sample line-sample line-diaphragm pump-filter balston from dirty of dust process use instrument air supply. Check function humidity sensor and filter humidity result function humidity normal and filer humidity good condition ( RIZAL )
|
|
2026-04-07
2 days ago
|
NR.EL-01
|
Wahyu Adi Triono
|
TRUBA-JAGA-CITA;
|
Inspection electrical and welding tools
|
Do inspection electrical and welding tools of PT Truba Jaga Cita tagging with green color. Note 3 extention cable are rejected because not full fill requirement safety of plant total equipment electrical 18 units and welding 5 units ( EDI & ADI )
|
|
2026-04-06
3 days ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-443-PH1
|
PMR Service Crit Motor & LSR KL & Cooler
|
Clean up area motor and filter motor. Measure vibration-noise-temperature of FS and LS motor. Add grease for 20 times AND 25 times for FS and LS. Write KW-Ampere-Voltage at ER3 put at form check sheet ( MUHAIMIN & DADANG & EVE AJI )
|
|
2026-04-06
3 days ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-&-473-CC1
|
PMR service critical motor LSR RM-CM
|
Clean up area motor and filter motor. Measure vibration-noise-temperature FS and LS motor. Write KW-Voltage-Ampere at ER4 & ER5 put at form check sheet. Add grease 25 times and 30 times for FS and LS ( AGUS & ANDRI )
|
|
2026-04-06
3 days ago
|
NR.EL-01
|
Wahyu Adi Triono
|
PT-PINCURAN-MAS
|
Inspection Tools Pincuran Mas
|
Check electrical tool of PT Pincuran Mas tagging with green color. Note repare connection extention cable and portable lamp ( EDI & ADI )
|
|
2026-04-03
6 days ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WF-FABA
|
Support upgrade WF FABA
|
Relocation 2 panel I/O station 21 & 31 from south side to north side of 333 WF5 also move power lighting lamp to panel I/O west side of 333 WF5. Pulling cable for power VS and power control. Prepare control and test partial like function speed and LC ( JAJAT & AGUS & EDI & RIZAL & ADI & MUHAIMIN & ANDRI & AIMAN )
|
|
2026-04-02
1 week ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR service analyzer
|
Clean flange probe-sample line-filter sample line-diaphragm pump-filter balston from dirty of coal . Check function humidity sensor and filter humidity result function humidity sensor normal and filter good condition ( RIZAL & EVE CINDA & ANDRI )
|
|
2026-04-02
1 week ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER6
|
Cleaning ER6 and MCC panel
|
DO clean up ER room and MCC panel also filter panel form dirty of dust use equipment cleaning tools. Also do vacuum room use vacuum cleaner also mop room ( AIMAN )
|
|
2026-04-02
1 week ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Continue Prepare Upgrade fabrication Control WF FABA & Report Bearing Support recondition motor
|
Prepare upgrade control WF FABA Do make report upgrade recondition motor( AGUS & MUHAIMIN )
|
|
2026-04-02
1 week ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CIVIL-BUILDING-WORKSHOP
|
Check Tool Civil Building
|
Inspection electrical tools of Civil Building. Do repare connection portable lamp 2 each test run nomai, repare 1 each extention cable test run normal Note total equipment 25 tools tagging with green color ( EDI & ADI )
|
|
2026-04-01
1 week ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CKD
|
Fabrication cover motor for area CKD - Continue Painting Yellow
|
Do repainting 7 cover yellow color motor at CKD area ( ANDRI )
|
|
2026-04-01
1 week ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Continue Prepare Upgrade fabrication Control WF FABA
|
Do fabrication panel for upgrade WF of FABA ( AGUS & MUHAIMIN )
|
|
2026-04-01
1 week ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-BC4
|
Issue sump pump abnormal condition
|
Replace sump pump motor with spare unit, test function result sump pump still working abnormal suspected many coal inside water ( EDI & ADI )
|
|
2026-04-01
1 week ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-BC4
|
Issue sump pump abnormal condition
|
Replace sump pump motor with spare unit, test function result sump pump still working abnormal suspected many coal inside water ( EDI & ADI )
|
|
2026-04-01
1 week ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER4
|
Clean up ER and MCC panel
|
Clean up area Electric Room 4 bottom and top also MCC panel and filter panel from dirty of dust use equipment cleaning tools and vacuum cleaner. Continue mop floor electric room top and bottom (AIMAN )
|
|
2026-04-01
1 week ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Complete form recondition motor by SBI and vendor and bearing support
|
Do complete data form of recondition motor from SBI and vendor and write bearing support of motor ( MUHAIMIN )
|
|
2026-04-01
1 week ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TR1-&-L3C-RE1
|
Clean Up Panel Control L1C-TR1, Radio Link, L3C-RE1
|
Do clean up panel control L1C TR1- Radio Link and L3C RE1 from dirty of dust coal use instrument air supply also clean up safety device-lighting lamp-LCS motor-panel welding from dirty of coal dust ( JAJAT & EDI & ADI )
|
|
2026-04-01
1 week ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR service analyzer
|
Clean up flange probe-sample line tube-filter sample line-diaphragm pump-filter balston from dirty of coal use instrument air supply. Check function of humidity sensor and check filter humidity result function humidity sensor normal and filter humidity good condition ( RIZAL & ANDRI )
|
|
2026-03-31
1 week ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1
|
Issue Temp Winding T6 high > 128 Deg
|
Install blower, Cleaning Filter 363 FA2 (Monitor temperature T6 = 114 deg) ( MUHAIMIN & ANDRI )
|
|
2026-03-31
1 week ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Prepare and fabrication control FABA ( info control at Mr.Yunus )
|
Take control at Mr.Yunus bring to workshop. Prepare control FABA at workshop ( AGUS & MUHAIMIN )
|
|
2026-03-31
1 week ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR service analyzer
|
Clean up flange probe-probe-filter sample-sample line-diaphragm pump-filter balston from dirty of dust. Check function humidity sensor and filter humidity result function humidity normal and filter good condition ( RIZAL & ANDRI )
|
|
2026-03-31
1 week ago
|
NR.EL-01
|
Wahyu Adi Triono
|
413-3B1-&-3B2-&-473-CC1-&-463-KL1
|
WBI Elec & Ins & Check I/O & S Pump Blending, Cooler Area Kiln
|
Do WBI Elec & Ins & Check I/O & S Pump Bl,C Area Kiln. Do test function sump at IDO tank result function normal-L1C BC4 result can not start from LCS because manual function do clean up motor sump pump at workshop found much dirty of coal test function motor sump pump result normal take screning motor sump pump install at motor continue install location test function normal function-L1C BC1 result functon normal. Clean I/O panel area cooler and blending west and east-kiln from dirty of dust use equipment cleaning tools ( EDI & ADI )
|
|
2026-03-30
1 week ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WF-FABA
|
Observation power for weigh feeder
|
Power VSD 333 WF5 take from W83 RF3 and for WP3 RF3 take from distribution power ( JAJAT & AGUS & MUHAIMIN )
|
|
2026-03-30
1 week ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
T Scanner Abnormal
|
Check at local found stick limit switch broken, replace stick result monitor T scanner normal ( RIZAL & ANDRI )
|
|
2026-03-30
1 week ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-FXB-M1
|
Issue Stop Local
|
Check LCS result normal, check I/o module result abnormal, change address signal S test start result function motor normal ( JAJAT & MUHAIMIN & ADI )
|
|
2026-03-30
1 week ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CKD-MOTOR
|
Fabrication cover motor for area CKD
|
Go to location measure motor at CKD for make cover motor. Do fabrication cover motor area CKD at workshop. Install 4 cover motor at site of CKD ( ANDRI & WIKAN )
|
|
2026-03-30
1 week ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR service CEMS
|
Clean up purge air motor and filter motor-swivel windows T/R, R unit also flange with tube of Dust Hunter also alignment Dust Hunter-transducer A & B of Flowsic-CEMS room-filter cabinet MCS 100 E-CEMS gas room from dirty of dust use instrument air supply. Replace H2 bottle for FIDOR continue calibration zero and span result normal ( RIZAL & EVE CINDA )
|
|
2026-03-30
1 week ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-&-473-CC1
|
PMR Service Crit Motor & LSR KL & Cooler
|
Clean up area motor and filter motor from dirty of dust use instrument air supply. Measure vibration-noise-temperature FS and LS motor also grease motor for 20 times - 25 times for FS and LS motor. Write ampere-KW-voltage-temperature motor at ER4 & ER5 continue write at check sheet ( AGUS & MUHAIMIN )
|
|
2026-03-30
1 week ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-443-PH1
|
PMR service critical motor LSR RM-CM
|
Clean up area motor, filter motor from dirty of dust use instrument air supply. Measure vibration-noise-temperature of FS and LS motor. Add grease motor for 15 times and 20 times for FS and LS motor, Write ampere-KW-temperature-voltage motor at ER3 and ER4 continue write at check sheet note Carbon Brush no8 at 363 MD1 -1 need to replace with spare unit ( EDI & ADI )
|
|
2026-03-27
2 weeks ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER5-&-423-2K1
|
Clean up ER5 and Cleaning Area Cems ( Report ALL ER period 26 Febuary and 27 March 2026)
|
Clean up ER5 top and bottom made report Feb-March 2026 also do clean up 423 2K1 room analyzer ( AIMAN )
|
|
2026-03-27
2 weeks ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-3B1
|
Cleaning and Greasing Motor Area Clinker Silo
|
Cleaning Motor 493-AC1, AC2 ,AC3 also add grease motor ( ANDRI & DADANG )
|
|
2026-03-27
2 weeks ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-EL1
|
Issue door of elevator 5th abnormal
|
Cleaning All Door elevator test function elevator result normal note AC control elevator failure and push button inside elevator bad condition ( AGUS & MUHAIMIN )
|
|
2026-03-27
2 weeks ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
Y43-1G1 Increase Setpoint to 75 %
|
Set HRG to 75% do monitor result normal function ( JAJAT )
|
|
2026-03-27
2 weeks ago
|
NR.EL-01
|
Wahyu Adi Triono
|
FEED-BIN
|
Observation relocation station area WF ( project upgrade WF FABA)
|
Do observation relocation station of area WF, check cable needed approximately cable needed enough if station move to 333 WF1. Also check cable at warehouse for 4 x 25 mm result cable are not available ( JAJAT & EDI & ADI )
|
|
2026-03-26
2 weeks ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
HRG
|
Y43-1G1 ( HRG Purifier (ELGA 2) , Issue Abnormal Level
|
Cleaning Sensor Level, set to overflow do monitor setting 75% ( ADI & MUHAIMIN & ANDRI )
|
|
2026-03-26
2 weeks ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Prepare panel power point
|
Do prepare panel power point at work shop for 2 panel including wiring inside panel ( AGUS & DADANG )
|
|
2026-03-26
2 weeks ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA1
|
Issue grease outside tank
|
Check at location found tank grease bad condition make grease motor outside tank, replace tank of grease pump result grease motor function normal ( EDI & DADANG )
|
|
2026-03-26
2 weeks ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-2K1&-L63-2K2-&-L63-2K3-&-483-2K1-&-463-2K1-&-443-2K1
|
PMR service analyzer
|
Do clean up flange probe-sample line-filter sample line-diaphragm pump-filter balston-check function humidity sensor and filter humidity from dirty of coal result function humidity sensor normal and filter good condition note replace filter sample line for L63 2K2 with spare unit. Clean up flange probe-probe-filter sample line-sample line tube-diaphragm pump-filter balston from dirty of dust also check function of humidity sensor and filter humidity result function sensor humidity normal and filter humidity normal ( AGUS & MUHAIMIN & ANDRI )
|
|
2026-03-26
2 weeks ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-463-KL1-&-L63-RM1
|
WBI Switchgear, Cap & Trafo RM, KL & CM1
|
Do WBI WBI Switchgear, Capacitor & Trafo RM, KL & CM1, write result at form ( EDI & DADANG )
|
|
2026-03-26
2 weeks ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Complete data check sheet for WBI Elec & Ins & Check I/O GCT, EP,PH&KL (Report 24-3-26) & PMR CCTV, IR TAD & Kiln Scanner NAR1 (Report 23-3-26)
|
Do complete data check sheet for WBI Elec & Ins & Check I/O GCT, EP,PH&KL and PMR CCTV, IR TAD & Kiln Scanner NAR1 for date 23/3/26 and 24/3/26 at form also make report of SOT of march month ( ADI & JAJAT )
|
|
2026-03-17
3 weeks ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Prepare fabrication support portable power point
|
Do fabrication support of panel power point at workshop ( ADI & ANDRI & DADANG )
|
|
2026-03-16
3 weeks ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-L63-RM1-&-463-KL1-&-473-CC1
|
PMR Service Critical Motor & LSR RM&CM1
|
Do clean up area motor and filter motor. Measure vibration & noise motor of FS and LS. Add grease 25 times-30 times- 15 times for FS and LS ( RIZAL & DADANG )
|
|
2026-03-16
3 weeks ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Report PMR /WBI periode 9- 13 March 2026
|
Do complete data check sheet PMR analyzer L63 2K1-:63 2K2-L63 2K3-483 2K1-463 2K1-443 2K1-423 2K1, PMR IR TAD-CCTV-T Scanner-Pyrometer, Critical motor 363 MD1-363 FN1-363 FN2-423 FN1-443 FN1-L63 MD1-L63 FN1-473 FN7-463 MD1-WBI Top blending-CT-PH-Kiln WBI Bottom Blending-Kiln-Cooler-Clinker Silo WBI CM-Truck Lift-Tripper-Reclaimer Coal and print out data check sheet 9 to 12 copies ( ADI )
|
|
2026-03-13
3 weeks ago
|
NR.EL-01
|
Wahyu Adi Triono
|
MULTICYCLONE-RAW-MILL
|
Panel welding multicyclone raw mill tapping power
|
Do make hole of power cable panel welding continue connected at panel welding, test output result ok ( AGUS & DADANG )
|
|
2026-03-13
3 weeks ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1
|
Continue Power point at 363-MD1 ( Tapping Power )
|
Do connect cable power point of 363 MD1 at panel welding bottom cyclone raw mill test on measure output result normal ( EDI & ADI )
|
|
2026-03-13
3 weeks ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-FA2-&-363--MD1
|
clean up CB room and check all CB of long carbon brush and clean up 363 FA2 filter motor
|
Clean up area motor 363 MD1 and carbon brush room from dirty of dust also clean 363 FA2 filter motor from dirty of dust use instrument air supply. Check long carbon brush found no 8 is to short replace carbon brush no 8 with spare unit ( EDI & ADI )
|
|
2026-03-13
4 weeks ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG-&-T-SCANNER-&-463-2K1
|
Y43-1G1 Prepare Running + Prepare Install-Cleaning ELGA unit (Continue)- Issue T scanner abnormal - Cooling system failure
|
Replace fuse-install filter and UV lamp. Do replace-modification LS, result T scanner result view T scanner at operator normal. Replace RTD, tidy up cable result cooling system normal at analyzer 463 2K1 ( RIZAL & ANDRI )
|
|
2026-03-12
4 weeks ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Continue Prepare Upgrade Control
|
Do finishing wiring panel of upgrade control also put name of indication at front of panel ( AGUS & MUHAIMIN )
|
|
2026-03-12
4 weeks ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1
|
Continue Power point at 363-MD1 ( Pulling cable and fabrication cable route )
|
Install pipe 2 inch for cable route from h-beam raw mill. Puling cable from welding cyclone raw mill to location power point at 363 MD1 also connected cable ( EDI & ADI & DADANG )
|
|
2026-03-12
4 weeks ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
473-FA9
|
Issue value draft abnormal
|
Replace pressure transmitter and setting parameter 130 mmH2O result indication draft back to normal at CCR operator. Fabrication support of pressure transmitter. Note Beck actuator function normal but at blade mechanical not response (RIZAL & EVE CINDA & ANDRI )
|
|
2026-03-11
4 weeks ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Continue Prepare Upgrade Control 443 2K1
|
Continue wiring cable inside panel of upgrade panel 443 2K1 ( AGUS & MUHAIMIN )
|
|
2026-03-10
4 weeks ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-3B1
|
Issue signal proximity often bad. Replace proximity of gate bin
|
Do replace proximity for gate because existing signal error at CCR operator result after function normal ( RIZAL & ANDRI )
|
|
2026-03-11
4 weeks ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-2K1
|
Continue upgrade control
|
Continue wiring cable inside panel and install panel upgrade inside analyzer 443 2K1 room ( AGUS & MUHAIMIN )
|
|
2026-03-11
4 weeks ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-2K1
|
Cleaning and painting room of analyzer
|
Do clean up analyzer 443 2K1, and repainting floor with green color and door with yellow color ( JAJAT & AIMAN )
|
|
2026-03-11
4 weeks ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR service analyzer
|
Do clean up filter sample-flange probe-sample line-diaphragm pump-balston filter from dirty of coal use instrument air supply. Check function humidity sensor and filter humidity result function humidity sensor normal and filter humidity good condition ( RIZAL & ANDRI )
|
|
2026-03-10
4 weeks ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-FN1-&-363-FN2
|
Cleaning Filter Issue Dirty - Control Alarm temperature
|
Clean Filter unit both of 363 FN1 and 363 FN2 result alarm temperature disappear ( EDI & DADANG )
|
|
2026-03-10
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Continue Prepare Upgrade Control 443 2K1
|
Continue do wiring panel of upgrade analyzer 443 2K1 ( AGUS & MUHAIMIN )
|
|
2026-03-10
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR service CEMS
|
Clean up purge air unit motor and filter motor- flange with tube Dust Hunter-swivel windows of T/R also R-alignment Dust Hunter- transducer A & transducer B of Flowsic- CEMS room also filter cabinet MCS 100 E-CEMS gas room bottle form dirty of dust use instrument air supply ( RIZAL & ANDRI )
|
|
2026-03-10
1 month ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
483-FA2-&-483-BL7
|
Issue high noise up 2 gE
|
Add grease motor around 20 times for FS & LS also add grease motor 483 BL7 for LS 10 times and FS 8 times ( EDI & ADI )
|
|
2026-03-10
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-GQ1
|
Issue lighting lamp off at south side
|
Check at location, found lighting lamp off and cable power for lighting lamp is not connected to cable power input. Do reconnected cable power result lighting lamp normal operation ( EDI & ADI & DADANG )
|
|
2026-03-09
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Continue Prepare Upgrade Control 443 2K1
|
Do revision drawing of upgrade control analyzer 443 2K1 and print out file drawing of upgrade control analyzer 443 2K1 ( AGUS & MUHAIMIN )
|
|
2026-03-09
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR service analyzer
|
Clean up flange probe-probe-sample line-diaphragm pump-filter balston from dirty of dust process. Check function of humidity sensor and filter humidity result function sensor normal and filter humidity good condition. Note replace filter sika at analyzer 463 2K1 and do calibration zero gas and span gas result calibration ok( RIZAL & EVE CINDA & ANDRI )
|
|
2026-03-09
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-&-473-CC1
|
PMR Service Critical Motor & LSR
|
Clean up area motor-filter motor from dirty of dust use instrument air supply. Measure vibration-noise-temperature for FS and LS motor. Add grease from 25 times-30 times for FS and LS. Write RPM-Voltage-Ampere-Temperature motor and bearing at electric room 4 and electric room 5 ( MUHAIMIN & DADANG )
|
|
2026-03-09
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-L63-RM1
|
PMR Service Critical Motor & LSR
|
Clean up area motor-filter motor from dirty of dust use instrument air supply. Measure vibration-noise-temperature for FS and LS motor. Add grease from 15 times-20 times-30 times for FS and LS. Write RPM-Voltage-Ampere-Temperature motor and bearing at electric room 3 and electric room 4 Note there alarm at 363 FN1 because temperature 112 degree C at MICOM ( EDI & ADI )
|
|
2026-03-06
1 month ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
WORK-SHOP
|
Continue Prepare Upgrade Control
|
Wiring Control Local ( AGUS & MUHAIMIN )
|
|
2026-03-06
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-BF1
|
Observation replace diaphragm
|
Replace diaphragm L63 BF1 ( RIZAL & ANDRI & DADANG )
|
|
2026-03-06
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-DB1&-473-FA4
|
Repare cable Connection safety device and repare cable Connection Thermocouple
|
Repare and Cleaning result ok ( RIZAL & ANDRI & DADANG )
|
|
2026-03-06
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3-&-ER4-&-ER5-&-ER6
|
PMR Load MCC and UPS
|
Do PMR load MCC and UPS at ER3-ER4-ER5-ER6 ( EDI & ADI )
|
|
2026-03-05
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
433-BE1-&-443-2K1
|
Issue D5 Warning and Failure and observation due contamination of water
|
Check at location, replace contact kit BD 5 of 433 BE1. Do replace pump of dryer gas at 443 2K1, monitor reading O2 and CO2 for probe 1 and probe 2 result reading gas of O2 and CO normal as process ( RIZAL & EVE CINDA & ANDRI )
|
|
2026-03-05
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SC5
|
Observation issue Abnormal (Signal S dan Speed Monitor)
|
Check 393 SC5 at location, do clean up probe of motion test simulation result normal indication signal S and speed monitor ok at CCR operator ( EDI & DADANG )
|
|
2026-03-05
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CIVIL-BUILDING-WORKSHOP
|
Repare lighting lamp off
|
Do wiring cable power of lighting lamp 6 units, test result lighting lamp normal ( JAJAT & ADI )
|
|
2026-03-04
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
Support Heating up + Feeding
|
Do support heating up process and feeding kiln ( JAJAT & ADUS & RIZAL & EDI & ADI & MUHAIMIN & ANDRI & DADANG )
|
|
2026-03-04
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Prepare Audit API 2026
|
Numbering File-File at file box and name file at panel ( JAJAT & ADI )
|
|
2026-03-04
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-2K1
|
Line Purging broken and issue reading O2 high
|
Repare-Welding join piping, create valve drain pressure pump leaked, repared, normal ( RIZAL & ANDRI )
|
|
2026-03-04
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3
|
Prepare Panel IO station N31 (Dismantling Panel ER 3 bottom )
|
Dismantling Panel Ex-Sick and LR ( EDI & EVE CINDA & DADANG )
|
|
2026-03-04
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-FN1
|
Prepare power point
|
Tapping Power From welding point transport 423-F1 ( EDI & DADANG )
|
|
2026-03-02
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L93-3B1
|
Issue level abnormal
|
Check at location, do clean up load cell result indication level normal ( RIZAL & MUHAIMIN & EVE CINDA )
|
|
2026-03-02
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
BURNER-FLOOR
|
Prepare and calibration of flow diesel
|
Do calibration flow diesel with drop test result good ( RIZAL & MUHAIMIN & EVE CINTA )
|
|
2026-03-02
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SC8
|
Prepare and install indication ampere
|
Do prepare CT at workshop 50/5A, and wiring cable for CT at workshop and install CT 50/5A at ER3 for 383 SC8 and wiring cable output at panel I/O at ER3 result indication ampere normal ( JAJAT % EDI & ADI & DADANG )
|
|
2026-02-27
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
433-BE1-&-393-BE1
|
Fabrication and install cover motor
|
Do fabrication cover of motor 393 BE1 -433 BE1 and install at location ( EDI & MUHAIMIN & DADANG )
|
|
2026-02-27
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
Issue shell cooling failure
|
Check at location found cable power is not long enough, also measure resistance cable found bad result. Replace connector cable power motor with spare result motor shell cooling fan function normal ( EDI & MUHAIMIN & DADANG )
|
|
2026-02-27
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Prepare document for AUDIT API
|
Complete data file for calibration RTD year 2025, PMR Service Analyzer-PMR IR TAD-CCTV-Tscanner-Camera Burner-PMR Critical Motor of 363 RM1-443 PH1-L63 RM1-473 FN7-463 KL1-PMR Clean Electric Room of 3-4-5-6 for year 2025 and 2026 and print out data PMR clean up ER3-ER4-ER5-ER6 ( JAJAT & ADI )
|
|
2026-02-27
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER6
|
TPM Gemba 5R
|
Do install sign safety for assembly point 2 each outside ER6-Evacuation Route 4 each inside ER6-Equipment cleaning tools 2 each inside ER6. Accompany assessment at dash board TPM ER6 at work shop ( RIZAL & ADI & AIMAN )
|
|
2026-02-27
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
313-3B1
|
Continue level silo east blending error
|
Do reposition of level sensor and rewiring cable sensor also data, result level same with operator CCR expected ( RIZAL & ANDRI )
|
|
2026-02-26
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-3S1
|
Issue level blending silo error
|
Do dismantle level sensor and clean up sensor reinstall level sensor result indication available at CCR ( RIZAL & MUHAIMIN & EVE CINTA & ANDRI )
|
|
2026-02-26
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-MECHANIC-1
|
Prepare TPM ER6 report
|
Do prepare report of TPM ER6, print out sign Catatan GEMBA 5R and VOM get sign from Mr.Jajat, Mr. Heri Setiawan and Mr. Safrin and put at dashboard TPM at work shop ( JAJAT & RIZAL & ADI )
|
|
2026-02-26
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-MD1-AND-MOTOR-20-KW
|
Issue noise at L63 MD1
|
Add grease motor at L63 MD1 measure noise result below2 gE. Do add grease motor of 20 KW measure vibration and noise result normal vibration below 4 mm/s and noise below 2 gE ( AGUS )
|
|
2026-02-26
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR service CEMS
|
Clean up purge air unit motor and filter motor, swivel window of Dust Hunter do alignment Dust Hunter, transducer A and transducer B of Flowsick, CEMS room gas bottle area, CEMS room. filter cabinet MCS 100 E from dirty of dust process use instrument air supply ( RIZAL & MUHAIMIN & ANDRI )
|
|
2026-02-26
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR service analyzer
|
Clean up filter sample-sample line-diaphragm pump-filter balston from dirty of coal. Check function humidity sensor and filter humidity result function humidity normal and filter sensor good condition ( EDI & EVE CINTA & DADANG )
|
|
2026-02-25
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-FN1
|
Temperature T6 , issue High indication
|
Install Blower 2 side result temperature normal at CCR operator ( EDI & AGUS )
|
|
2026-02-26
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-MECHANIC-1
|
Prepare TPM Assesment
|
Do prepare report TPM ( RIZAL )
|
|
2026-02-25
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3
|
Issue AC Robicon issue hot around 36 degree C
|
Monitor, team Karteksi repare piping Leaked, Add Gas Freon result AC function normal and temperature normal ( JAJAT & AGUS )
|
|
2026-02-26
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SC3
|
Prepare installation indication of ampere
|
Install ampere unit, result view at operator CCR good ( AGUS & MUHAIMIN & DADANG )
|
|
2026-02-25
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-BE1-&-393-BE1
|
Add grease motor
|
Add Grease, result vibration below 4 mm/s. Do monitor vibration motor ( EDI )
|
|
2026-02-25
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-FA-E
|
Issue motor ground replace position motor fan of stand by
|
Do activation motor spare result function motor normal ( JAJAT & AGUS & MUHAIMIN & DADANG )
|
|
2026-02-25
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-2K1
|
PMR service analyzer
|
Clean filter sample-sample line-diaphragm pump-filter balston. Check function humidity sensor and filter humidity result function humidity sensor normal and filter good condition ( RIZAL & EVE CINTA & ANDRI )
|
|
2026-02-24
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-CT1-T2
|
Indication temperature low
|
Check temperature with portable sensor result indication around 96 degree C to 102 degree C compare at CCR indication temperature 45 degree C. Dismantle sensor T/C found very dirty with hard dust and do clean up sensor continue install result indication temperature same between local at CCR ( JAJAT & RIZAL & ANDRI & MUHAIMIN )
|
|
2026-02-25
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CAMERA-BURNER
|
Issue view is not available at CCR operator
|
Dismantling camera, service all lens and room of camera kiln. Install camera kiln at location result view of camera available at operator CCR ( RIZAL & ANDRI )
|
|
2026-02-25
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
T-SCANNER
|
Dotted line view at CCR operator
|
Do replace limit switch, result view normal monitoring view at CCR ( EDI & DADANG )
|
|
2026-02-24
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
3B1-W.PV-
|
Issue level indication error
|
Do service connection cable sensor and clean up sensor result function level sensor normal ( RIZAL & MUHAIMIN & ANDRI & DADANG )
|
|
2026-02-24
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Ex 393-FA6 Service motor replace bearing
|
Bearing housing broken when try to open use tool ( MUHAIMIN & ADI & EDI )
|
|
2026-02-24
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
, Service analyser Unit
|
Do Service sample point analyzer ( EDI & ADI & MUHAUMIN )
|
|
2026-02-24
1 month ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
LA3-VA1
|
Proportional Valve Error
|
Replace Proportional Valve , Setting Actual Position, Setting Actual vs Set point result setting and actual position ok ( RIZAL & ANDRI & DADANG )
|
|
2026-02-24
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-SR1
|
Issue indication temperature low at CCR
|
Repare connection (Monitor) ( RIZAL & ANDRI )
|
|
2026-02-23
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-
|
Support heating up process
|
Support process heating up of kiln ( RIZAL & ANDRI & JAJAT & EVE CINTA )
|
|
2026-02-23
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-FA6
|
Replace motor
|
Bring motor spare from ware house electric at ER5 to 8th floor. Dismantle existing motor and install motor spare do test run result function motor normal. Measure ampere 6.3 A and measure vibration-noise-temperature A-H-S for FS and LS result normal indication ( JAJAT & AGUS & MUHAIMIN & EDI & RIZAL & ADI & ANDRI & DADANG )
|
|
2026-02-23
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
413-BF2
|
Replace PLC Siemens issue failure of PLC
|
Do replace PLC SIEMEN of 413 BF2, test run function normal ( RIZAL & ANDRI & EVE CINTA )
|
|
2026-02-23
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1
|
Clean up carbon brush and measure actual condition of carbon brush
|
Do clean up carbon brush room and slip ring use instrument air supply. Continue clen up slip ring use contact cleaner. Check and measure actual long result still good ( EDI & ADI & DADANG )
|
|
2026-02-20
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SGD-393-SGE-393-SGF
|
Dismantling solenoid valve
|
Dismantling solenoid valve for slide 3 unit bring to work shop ( JAJAT & EDI & ADI )
|
|
2026-02-20
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-FN1
|
Tidy up cable power of blower fan
|
Tidy up cable power for blower of 443 FN1 from panel welding 363 RM1 to panel at 443 WP test on result ok note found breaker 1 failure replace with spare but power blower connected to output power ( EDI & ADI & AIMAN )
|
|
2026-02-20
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
Continue relocation or repare shell kiln fan (Test Motor)
|
Do function motor shell kiln fan result of motor function normal ( AGUS & MUHAIMIN & CIVACON )
|
|
2026-02-20
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
453-AE1-&-483-AE1
|
Check function aeration
|
Do aeration at 453 AE1 and 483 AE1 result function normal ( RIZAL & ANDRI & DADANG )
|
|
2026-02-20
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA3
|
Dismantling ex cable power
|
Do dismantling cable ex 473 FA3 with cutting cable and put at safe location ( EDI & ADI & AIMAN (
|
|
2026-02-19
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-HD1
|
Relocation power stop contact
|
Relocation power stop of 473 HD1 ( AGUS & RIZAL & ANDRI & EVE FADHILAH )
|
|
2026-02-19
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
Continue relocation or repare shell kiln fan
|
Do repare cover motor shell fan of kiln. Fabrication cover at workshop and install at location ( AGUS & MUHAIMIN & EVE FADHILAH & DADANG )
|
|
2026-02-19
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-BC1-TO-L1C-BC7
|
check actual KW motor-voltage-ampere motor
|
Check indication KW-ampere-voltage motor at ER6 for L1C BC1-L1C BC2-L1C BC3-L1C BC4-L1C BC5-L1C BC6 and L1C BC7 at ER6. Data send to Mr. Jajat ( EDI & ADI )
|
|
2026-02-19
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
4W3-1NF
|
Replace ELCB di 4W3-1NE (Cooler Area)-- 2 EA broken
|
Do replace ELCB at 4W3 1NE 2 each for 25 A also replace receptacle 2 units ( EDI & ADI )
|
|
2026-02-19
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-MECHANIC-1
|
Prepare Data AUDIT API
|
Do prepare data AUDIT API, print out form complete data calibration and adjustment feeder for 11/8/2025 ( JAJAT & ADI )
|
|
2026-02-17
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-FA2
|
Test Run
|
Test run 483 FA2 with different speed check indication ampere-vibration result normal ( AGUS & MUHAIMIN & DADANG & JAJAT )
|
|
2026-02-17
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
413-BL2
|
Replace breaker of local isolation
|
Check at site found need to replace panel LCS with new one. Replace panel LCS with spare for 63 A, continue wiring cable power and for Start-Stop-Emergency ( EDI & ADI )
|
|
2026-02-17
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-AC2
|
Issue speed failure
|
Check at control miltronic indication lamp ON but 493 AC2 condition stop check at ER5 found breaker input OFF but indication ready jumper cable. Do start breaker input and LCS 493 AC2 existing off position. Try to start from CCR result running normal ( EDI & ADI & FIRMAN & RAFI )
|
|
2026-02-17
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HEAT-EXCHANGER
|
Activation hoist crane
|
Do pulling and connected Power to Hoist Crane result done ( AGUS & MUHAIMIN & DADANG )
|
|
2026-02-17
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-CT1-&-463-2K1
|
Activation flow meter and replace RTD of IKGA
|
Re-wiring, Set Parameter Sensor, Commissioning Transport result normal. Soldering RTD sensor to Transducer result normal ( RIZAL & ANDRI )
|
|
2026-02-17
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1-473-CC1-413-3S1-413-3S2
|
Clean up panel I/O
|
Do clean up panel I/O area east - west blending -cooler-preheater also LCS from dirty of dust use hand blower ( JAJAT & EDI & ADI & AIMAN )
|
|
2026-02-13
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CKD
|
Observation, cable needed of part electronic support project CKD
|
Maping cable needed of project CKD ( RIZAL & JAJAT & ADI & MUHAIMIN )
|
|
2026-02-13
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CKD
|
Observation cable way and prepare part needed rail cable project CKD
|
Do observation cable way and preparing spare part of rail needed project CKD ( EDI & ANDRI & DADANG & AIMAN )
|
|
2026-02-12
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
TOP-BLENDING-&-443-PH1
|
Clean up also check up LCS and motor
|
Do clean up area LCS and motor. Also clean up push button and emergency stop make function normal from dirty of dust ( AIMAN & EDI & ADI )
|
|
2026-02-12
1 month ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
443-CT1
|
Support replace flow sensor
|
Dismantling old sensor and disconnected sensor ( RIZAL & JAJAT )
|
|
2026-02-12
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
4D3-SC6
|
Activation indication ampere
|
Indication ready panel operator view ( JAJAT & AGUS & RIZAL & MUHAIMIN )
|
|
2026-02-12
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
EAST-BLEANDING-&-393-PP1
|
Clean up and check LCS - motor area blower blending east - 393 PP1
|
Clean up and check LCS-motor area blower and 483 PP1 from dirty of dust> Check function AUTO Grease 393 PP1 result function normal grease tank full condition ( EDI & ADI )
|
|
2026-02-12
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-RF2
|
Connected cable power
|
Do connected cable power of 483 RF2 ( EDI & ADI )
|
|
2026-02-11
1 month ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
483-RF1-&-483-BV1
|
Connect motor and BV
|
Do connect motor also BV test run result stuck at BV. Issue mechanic RF need to connected ( RIZAL & EDI )
|
|
2026-02-11
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-SC6
|
Install indication ampere unit
|
Install unit ampere and create DCS input ( MUHAIMIN & DADANG )
|
|
2026-02-11
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER6
|
Clean up inside and outside from dirty of dust
|
Put bamboo stick 2 each at ER6 continue clean up inside also outside room from dirty of dust use equipment cleaning tools ( ADI & AIMAN )
|
|
2026-02-11
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-FN1
|
Replace vibration sensor at free and fix side
|
Replace vibration sensor for fix and free side motor result ok ( RIZAL & MUHAIMIN & EVE FADHILAH & ANDRI & DADANG )
|
|
2026-02-11
1 month ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3
|
install cover concrete at AC ROBICON
|
Install cover concrete of AC ROBICON at ER3 use fork lift ( ADI & AIMAN )
|
|
2026-02-10
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-FN1
|
Support CBM for reposition FAN needed
|
Prepare damage nut fan. Do prepare panel at workshop, install 3 male socket power, put 2 MC and 1 small MC inside panel continue wiring cable ( JAJAT & AGUS & ADI )
|
|
2026-02-10
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-AC2
|
Pull Cord damage
|
Replace slink pull cord, test ok ( RIZAL& MUHAIMIN & ANDRI & DADANG )
|
|
2026-02-10
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-LD3
|
Dismantling damper and set gate at 100%
|
Dismantling damper of 483 LD3, Weld Gate to 100 % Open ( RIZAL & MUHAIMIN & ANDRI & DADANG )
|
|
2026-02-09
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3
|
Dismanlting scraft Piping (Robicon AC ER-3)
|
Throw scrap iron to warehouse scrap ( AIMAN & CIAVCON )
|
|
2026-02-09
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-FA2
|
Scaling VSD of motor (Speed -Amp)
|
Setting Parameter, Scaling speed and Ampere Indication Done ( AGUS & EVE FADHILAH )
|
|
2026-02-09
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-FN1
|
Install Main Power and All Sensor
|
Install Power cable and Sensor ( RIZAL & MUHAIMIN & ANDRI & DADANG )
|
|
2026-02-08
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-FN1
|
Install motor spare
|
Take motor spare of 363 FN1 at FM1 warehouse near EVE room bring to location continue dismantle roof of motor and bring existing motor to ER3 and install motor spare at location. Bring existing motor to FM1 ware house near EVE room ( JAJAT & AGUS & AIMAN & CIVACON )
|
|
2026-02-08
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-FA2
|
Activation VSD of motor
|
Turn off incoming power for wiring power input of VSD. Continue wiring cable power input at ER5 and setting parameter at control VSD found error HBB ( Hard Base Block ) do jumper for H1-H2-HC error HBB disappear. Start On motor local mode found frequency motor only 35 HZ resetting parameter maximal frequency from 60 to 100 result can be change from monitor control and result speed motor add at local ( RIZAL & ADI & MUHAIMIN & DADANG )
|
|
2026-02-06
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
BURNER-FLOOR
|
Tidy Up cable area burner
|
Tidy up cable area Burner ( AIMAN )
|
|
2026-02-06
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-FA2
|
Disconnect power damper and indication
|
Turn off power motor, dismantle ring at motor, also cable power damper and cable indication. Set output damper at 100% position ( EDI & MUHAIMIN & ADI )
|
|
2026-02-06
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-BU1
|
Install-Wiring Flow meter 483-BU1 + Commissioning
|
Re-wiring and Installation Kabel sensor, Test oil Circulation , Sensor Normal ( RIZAL & ANDRI & EVE SONY )
|
|
2026-02-06
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-FN1
|
Support job at 363 FN1 ( disconnect cable sensor and Motor)
|
Disconnected All Sensor and Power Motor, Support Mech Sky folding ( AGUS & EDI & ADI & MUHAIMIN & EVE FADHILAH & DADANG )
|
|
2026-02-05
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-FN1
|
Support job at 363 FN1
|
Do create permit, check area and motor ( JAJAT & MUHAIMIN & AIMAN & DADANG & EVE SONY )
|
|
2026-02-05
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-2K1
|
Install sensor temperature Honey Well
|
Install sensor temperature of Honey Well at 443 2K1 ( RIZAL & EVE FADHILAH & ANDRI )
|
|
2026-02-05
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-RF1
|
install seal motor
|
Do install seal motor and do heat of motor. Measure resistance motor for R-S-T to ground result value up to 2 mega ohm. Install motor at site ( AGUS & MUHAIMIN & EVE SONY & DADANG )
|
|
2026-02-05
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1-&-TOP-BLENDING
|
Clean Up and Check LCS + Motor
|
Clean up LCS and motor area top blending and PH, also panel I/O area top blending silo, Check function emergency stop before clean up first result function normal ( EDI & ADI & JAJAT & AIMAN )
|
|
2026-02-04
2 months ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
FM-OF-DIESEL
|
Make flange at workshop plant
|
Dismantle FM of diesel bring to workshop. Make flange for FM diesel at workshop plant, install flange at FM diesel also connected at location ( RIZAL & 2 CIVACON )
|
|
2026-02-04
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-RF1
|
Install seal motor
|
Install seal motor, measure use megger unit found resistance around 0.8 mega ohm - 0.9 mega ohm. Use heater lamp again at motor put behind workshop ( AGUS & MUHAIMIN & EVE SONY % DADANG )
|
|
2026-02-04
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
433-FM2
|
Repare or fabrication way of load cell
|
Check at location found cable load cell out position not neat. Dismantle cable load cell, install conduit cable tighten use cable tie and protect hole use silicone ( RIZAL & ED I& ADI & EVE FADHILAH )
|
|
2026-02-03
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
IDO-TANK-&-L1C-BC1-&-L1C-BC4
|
Check function sump pump
|
Do check function sump pump result IDO function normal, L1C BC1 function normal, L1C BC4 function normal note to be clean up area sump pump because many coal scattered around sump pump ( EDI & ADI & EVE FADHILAH )
|
|
2026-02-03
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-Z4A-T3
|
Replace Thermocouple
|
Dismantle existing thermocouple, install new housing thermocouple and thermocouple continue connect cable sensor ( RIZAL & EDI & ADI & ANDRI & EVE FADHILAH )
|
|
2026-02-03
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-FX1
|
Relocation LCS
|
Relocation LCS of 463 fX1 ( AGUS & MUHAIMIN & EVE SONY & DADANG )
|
|
2026-02-03
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FAC-M1
|
Clean up LCS and area motor (Area Burner )
|
Clean up area motor and LCS ( IMAN )
|
|
2026-02-03
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SC3
|
Support and fabrication new control upgrade
|
Disconnected Motor 4D2-RF1, motion 393-SC3 and LCS ( MUHAIMIN & DADANG & EVE SONY )
|
|
2026-02-03
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-BF1
|
Repare control safety valve issue cable not right position
|
Do make good position of cable 423 BF1 tighten use cable tie. Repare control safety valve by disconnect cable power ( AGUS & MUHAIMIN & DADANG & EVE SONY )
|
|
2026-02-02
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-AC1
|
Replace or repare cable burn
|
Repare and activation power distribution ( EDI & ADI & EVE SONY & EVE FADHILAH )
|
|
2026-02-02
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-RF1
|
Issue seal reducer to motor leakage
|
Dismantle motor 483 RF1. Do replace seal and bearing motor continue install at location ( AGUS & MUHAIMIN & DADANG )
|
|
2026-02-02
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-BF1
|
Relocation pressure senso
|
Relocation cause Mech Activity ( RIZAL & ANDRI )
|
|
2026-02-02
2 months ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
393-SC3-M2
|
Disconnect motor
|
Do disconnect power cable motor at 393 SC3 M2 9 ( JAJAT & EDI )
|
|
2026-02-02
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
SOT of febuary 2026
|
Make report of SOT for 1st weeks of febuary for all members of Electric Nr1 ( JAJAT & ADI )
|
|
2026-02-02
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-HS1
|
Replace / repare -Pulling and install cable burn area 473-HS1
|
Check at location, found dryer air is not function anymore because dryer air already disconnected from tube of air. Eliminated cable power from dryer air. Cutting cable power near wall of dryer air. Do turn off MCB at hydrolic room insulation cable power use electrical insulation ( EDI & ADI & EVE SONY & EVE FADHILAH
|
|
2026-01-30
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER5
|
Continue activation and connected VSD 483 FA2 and create module DCS
|
Do wiring cable DO at module 5 channel 10, dismantle cable K-T-D-R at I/O panel ER4 ( JAJAT & RIZAL & MUHAIMIN & ANDRI & EVE SONI & EVE FADHILAH )
|
|
2026-01-30
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Make report data safety for TPM ER6 4 file
|
Make report for data safety TPM ER6: lighting lamp inside ER6 - door of west ER6 - tube water drain of AC ER6 - conduit pipe porous outside ER6 print out at put at dash board TPM ER6 at workshop electric 1 ( JAJAT & ADI )
|
|
2026-01-29
2 months ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
ER5-483-FA2
|
Continue activation and connected VSD 483 FA2
|
Install scun of cable power and motor. Pulling cable control (2x6Px0,75mm), Install module AI820- DI810 unit set ( AGUS & MUHAIMIN & ANDRI & DADANG )
|
|
2026-01-29
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
TPM Activity ER6
|
Do send file VOM to TPM coordinator get sign, print out data 5R and laminating at workshop. Take laminating at CCR to put at dashboard TPM ER6 at workshop ( RIZAL & ADI )
|
|
2026-01-29
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Scanning data or complete calibration 2025-2026
|
Complete data calibration for 2024 to 2025, continue scanning send to email Mr. Jajat ( JAJAT & ADI )
|
|
2026-01-28
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER6
|
Gemba TPM ER6
|
Clean up area inside electric room, take picture of safety, replace lighting lamp and repare tube of drain air condition of ER6 ( RIZAL & ADI & IMAN )
|
|
2026-01-27
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
453-PW1
|
Wrapping unit to protect from production activity
|
Do wrapping unit 453 PW1 protect from production activity ( IMAN )
|
|
2026-01-27
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
Wiring and install support welding panel of cyclone 363 RM1
|
Do prepare tray cable at workshop , install at site and pulling cable to panel welding ( AGUS & MUHAIMIN & ANDRI & DADANG )
|
|
2026-01-27
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER5
|
Activation and connected VSD of 483 fA2
|
Observation cable, station and connection ( AGUS & MUHAIMIN & ANDRI & DADANG )
|
|
2026-01-27
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
SUMP-PUMP
|
Check function of sump pump all area
|
Check function of sump pump: IDO tank result ok but note pendulum sump pump outside hole make sump pump always on repare pendulum put inside hole of sump pump, L1C BC4 and L1C BC1 are sump pump normal note hole for sump pump of L1C BC4 many land will make sump pump always start note need to clean up hole of sump pump to make sump pump working properly ( EDI & ADI )
|
|
2026-01-26
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
MAIN-GATE-ACCES-CONTROL
|
Inpsection electrical and welding tools of PT Indoporlen
|
Do inspection electrical and welding tools tagging with red color. Note: 2 extention cable and 1 portable lamp are not safe because not full fell safety requirement of plant ( EDI & ADI )
|
|
2026-01-26
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA3-&-473-FA4
|
Fabrication cover motor
|
Fabrication cover motor at work shop and do painting cover with yellow color continue install at site for 473 FA3 and 473 FA4 ( MUHAIMIN & ANDRI & DADANG )
|
|
2026-01-26
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3
|
Activation CCTV ER3 - office way
|
Do activation CCTV of ER3 with IP 10.227.19.170 and 10.227.19.151 result view for CCTV ok ( AGUS, RIZAL )
|
|
2026-01-26
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
EAST-BLEANDING-&-WEST-BLENDING-&-CT-TRANSPORT
|
Clean up welding panel - I/O panel - area motor from dirty of dust
|
Clean up panel welding - panel I/O - panel LCS - area motor - bucket elevator- bag filter - rotary feeder - blower - air slide of east and west blending also CT transport from dirty of dust use instrument air supply and hand blower ( JAJAT & EDI & ADI )
|
|
2026-01-23
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-HS1
|
Issue cable burn area 473 HS1
|
Disconnected cable power , scheduling for repairing ( JAJAT )
|
|
2026-01-23
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
453-GA1-&-453-GA2
|
Disconnected cable 453-GA1/2
|
Disconnected cable 453 GA1 and 453 GA2 at local ( JAJAT & ADI )
|
|
2026-01-23
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3
|
Prepare set of CCTV for ER3 2 unit
|
Do prepare support for CCTV at ER3 at workshop. Continue install at CCTV at ER3 and do setting of CCTV ( AGUS )
|
|
2026-01-23
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
FEED-BIN
|
Extention module I/O at feed bin support upgrade weight feeder FABA
|
Do prepare module extention I/O for WF FABA. Continue install module at panel I/O like module 8 DI 810 - module 9 DI 810 - module10 AI 810 continued download extention module result ok ( RIZAL & ANDRI )
|
|
2026-01-23
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Prepare fabrication power point area L1C BC5
|
Do prepare panel power point of L1C BC and wiring cable, Prepare support of panel at workshop ( MUHAIMIN & DADANG & ADI )
|
|
2026-01-22
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
Fabrication cable tray and connected FX Kiln (Shell Fan Kiln) and Install Point Port (Continue) - Connect port FX
|
Install Cable to distribution port and complete accecories unit to FX (spare 3 FX) ( MUHAIMIN & DADANG )
|
|
2026-01-22
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER2
|
Continue activation remote VCS at ER3
|
Connected cable Terminal control to VCS unit ( AGUS & ANDRI & RIZAL )
|
|
2026-01-22
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
453-PF1-483RF1-483-RF2-483-AG1-453-AG1
|
Wrapping part because production activity
|
Do wrapping equipment due production activity result part complete safe ( RIZAL & ANDRI )
|
|
2026-01-22
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-FN1-&-473-FAA
|
Repare handle LOTOTO ID Fan and handle LCS 473 FAA
|
Replace handle LOTOTO 443 FN1 with spare unit result ok note white lock 7019 still at available at existing lock. Replace handle 473 FAA result ok ( EDI & ADI )
|
|
2026-01-22
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-RF3
|
Disconnect motor rotary feeder
|
Do disconnect power motor for 483 RF3 ( RIZAL & ANDRI )
|
|
2026-01-22
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-BC1
|
Issue sump pump failure
|
Check at local position switch sump pump at manual.. Found power trip at panel input. Turn on power result sump pump working normal ( EDI & ADI )
|
|
2026-01-22
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-CC1-&-463-KL1
|
Clean Up and Check LCS and motor cooler and Kiln Bottom
|
Do clean up panel LCS and motor area 473 CC1 including panel welding area cooler from dirt of dust use equipment cleaning tool a and hand blower ( JAJAT & EDI & ADI & AIMAN )
|
|
2026-01-21
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
Fabrication cable tray and connected FX Kiln (Shell Fan Kiln) + Install Point Port (Continue) - Connect port FX
|
Install fabrication bar electric and wiring cable support installation ( MUHAIMIN & DADANG )
|
|
2026-01-21
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3
|
Prepare-Rewiring LAN Install Converter-POE unit and office way
|
Install converter POE unit and office way at ER3 continue rewiring cable ( EDI & ADI )
|
|
2026-01-21
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3-&-ER4-&-ER5
|
Install SOP of MICOM P122 and P225
|
Laminating SOP of Micom P122 & P226 at workshop. Install SOP of MICOM P122 and P225 at ER3 - ER4 - ER5 ( EDI & ADI )
|
|
2026-01-19
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3-&-MAIN-GATE
|
Inspection electrical and welding tools of PT Civacon and PT RMP
|
Inspection electrical and welding tools of PT CIVACON at ER3. Repare extention cable because for ground cable connected failure for stop contact and welding machine because cable power is not safe at outside welding machine. Inspection electrical and welding tools of PT RMP at main gate. Tagging equipment with red color. Note there are some equipment electrical tools not safe because grounding cable failure ( EDI & ADI )
|
|
2026-01-20
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463KL1-&-BURNER-FLOOR
|
Clean Up dan Check LCS Area Burner + Kiln + Heat Exchanger
|
Do clean up and check up LCS area burner and kiln ( JAJAT & EDI & ADI & AIMAN)
|
|
2026-01-19
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
Fabrication cable tray and connected FX Kiln (Sheal Fan Kiln)
|
Do fabrication cable tray at workshop and install at site continue connected cable sheal fan of kiln ( AGUS & RIZAL & MUHAIMIN & ANDRI & DADANG )
|
|
2026-01-15
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-RE1
|
Cleaning MCC and PLC
|
Cleaning MCC and PLC for L1C RE1 use hand blower from dirty of dust ( JAJAT & AIMAN & DADANG )
|
|
2026-01-15
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1-&-473-CC1
|
Inspection electrical and welding tools of PT TRUBA JAGA CITA
|
Do inspection electrical and welding tools of PT Tuba Jaga Cita. Equipment tagging with red color. Note some extention cable, welding machine-portable lamp are not full feel requirement safety from company ( EDI & ADI )
|
|
2026-01-15
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
Activation I/O 2nd floor 443 PH1 ( project upgrade 443 2K1 & 463 2K1) and addressing
|
Do activation I/O panel 2nd floor of preheater for project upgrade 443 2K1 and 463 2K1 including addressing cable ( AGUS & RIZAL & MUHAIMIN & ANDRI )
|
|
2026-01-15
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-BF1
|
Activation I/O module, migitation solenoid failure
|
Install module solen0id valve, connected cable power for solenoid valve and connector tubing for solenoid valve. Also connected cable at I/O module Continue activation I/O module for migitation solenoid valve failure and install connector tubing at module solenoid valve ( AGUS & RIZAL & MUHAIMIN & ANDRI )
|
|
2026-01-14
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
HRG shutdown ( long time idle )
|
Follow form step by step Log stoppage procedure ( release pressure ,empty Water , Release Power, Stop Valve system , Off breaker control power ) ( JAJAT )
|
|
2026-01-14
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TR1
|
Continue fabrication welding panel area truck lift
|
Install pipe conduit for cable welding panel, continue connected to new welding panel and existing welding panel near hoist crane with action turn off power input existing welding panel ( RIZAL & ANDRI & DADANG & AGUS & JAJAT & ADI & MUHAIMIN & AIMAN )
|
|
2026-01-13
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TR1
|
Fabrication welding point area truck lift
|
Take cable no item 305122055 around 30 meter. Pulling cable power of welding panel at L1C BC1 room to top floor. Prepare pipe conduit around 5 meter and claim pipe at workshop bring to site ( EDI & RIZAL & ADI & ANDRI )
|
|
2026-01-13
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-CC1-AND-BURNER-FLOOR
|
Activation welding panel area burner and cooler
|
Activation welding panel at 493AC2, replace ELCB, install and setting timer of lamp ( AGUS & MUHAIMIN & DADANG )
|
|
2026-01-12
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
463 KL1 T1 issue reading temperature at CCR low
|
Replace Thermocouple and repare housing. Result reading temperature back to normal ( RIZAL & ANDRI )
|
|
2026-01-12
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR service analyzer
|
Do clean flange probe-probe-filter sample line-sample line tube-diaphragm pump-filter balston-dryer gas pump from dirty of dust use instrument air supply. Check function humidity sensor and filter humidity result function sensor humidity normal and filter humidity sensor good condition ( RIZAL & ANDRI )
|
|
2026-01-12
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-&-473-CC1
|
PMR Service Critical Motor & LSR CM & CC
|
Clean area motor and filter motor. Measure vibration-noise-temperature FS and LS motor. Add grease for FS and LS motor 30 times and 25 times ( MUHAIMIN & DADANG )
|
|
2026-01-12
2 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-443-PH1
|
PMR service critical motor LSR RM-PH
|
Clean area motor and filter motor. Also clean up filter 363 FA2. Measure vibration-noise-temperature FS and LS motor. Add grease for FS and LS motor 15 times and 20 times. Replace AUTO Grease motor for 363 FN1 and 363 FN2 with spare unit. Refill AUTO Grease empty level at workshop until unit ready to use ( EDI & ADI )
|
|
2026-01-09
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1
|
replace CB no 6-8-9
|
Do clean up carbon brush room area from dirty of dust with instrument air. Replace carbon brush no 6-8-9 with spare unit ( EDI & RIZAL & ADI )
|
|
2026-01-09
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Install camera WS electric
|
Do install camera CCTV at workshop also pulling cable power and LAN cable continue connect at camera result ok ( ANDRI & DADANG )
|
|
2026-01-09
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Complete data check sheet inspection electrical tools of PT Pincuran Mas
|
Do completing data check sheet inspection electrical tools of PT PINCURAN MAS at 6-1-26.. Scan file and send to Mr.Jaenudin Safety Officer PT Pincuran Mas ( ADI )
|
|
2026-01-09
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-AC2
|
Replace Box hagger + Accecories
|
Check condition of box LCS for 493 AC2-493 AC3-483 AC4 result condition normal also clean up pabelk LCS from dirty of dust ( EDI & ADI & MUHAIMIN )
|
|
2026-01-09
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L93-SC4
|
Issue speed failure
|
Check speed sensor at local result function sensor good note problem of mechanical ( RIZAL & ANDRI )
|
|
2026-01-09
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
Replace spray pump
|
Do check function water spray at local found have problem when manual do service valve manual result function valve manual water spray normal ( AGUS & EVE FADHILAH & DADANG )
|
|
2026-01-08
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER5
|
Support take sample oil trafo
|
Do support supplier take sample oil trafo at electric room 5 ( JAJAT & AGUS )
|
|
2026-01-08
3 months ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
463-2K1
|
Issue O2 High and repare chain tention
|
Clean up sample line, and adjust chain of probe retract and insert. Turn off shock blower direct to main hole. Result reading O2 back to normal below 4% ( MUHAIMIN & AGUS & EVE SONY & ANDRI )
|
|
2026-01-08
3 months ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
363-RM1
|
Prepare part Cover Motor
|
Do prepare part of cover motor area 363 RM1 ( RIZAL & MUHAIMIN & DADANG )
|
|
2026-01-08
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-BC1
|
Install welding point and issue sump pump failure
|
Prepare support for panel welding and install at panel welding. Install panel welding at L1C BC1. Do turn off power input and found motor of sump pump hot. Swap cable connection power, test function sump pump result ok normal ( EDI & ADI & EVE FADHILAH & DADANG & JAJAT )
|
|
2026-01-07
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-CN
|
Prepare Welding Point RM Cyclone
|
Install welding panel at cyclone rawmill (MUHAIMIN & EVE FADHILAH & ANDRI & DADANG )
|
|
2026-01-07
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
L1C BC1-BC2-BC3 prepare welding panel
|
Prepare welding panel ex burner floor bring to workshop do clean up panel. Repainting welding panel use grey color. ( EDI & DADANG )
|
|
2026-01-07
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
PINCURAN-MAS-WORK-SHOP
|
Inspection electrical and welding tools
|
Do inspection electrical tools of PT PINCURAN MAS tools tagging with red color ( ADI )
|
|
2026-01-07
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-BC1
|
Lighting lamp off near welding panel
|
Replace lighting lamp test function result lighting lamp on ( EDI & DADANG )
|
|
2026-01-07
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-BF1
|
Issue JB 21 No 7 Abnormal
|
Check at site, clean up solenoid valve and tubing purging and reconnect tubing result function solenoid valve back to normal ( RIZAL & ANDRI )
|
|
2026-01-06
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TR1
|
Install selector AUTO-MAN for signal START-STOP activated vibrator from CCR
|
Do install selector for AUTO-MAN of signal START & STOP also activated vibrator from CCR ( JAJAT & EDI & RIZAL & ANDRI & DADANG & AGUS & MUHAIMIN & ADI & AIMAN & EVE FADHILAH & EVE SONY )
|
|
2026-01-06
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TR1
|
Prepare cable for sensor position minimal 2 pair around 15 m x 3
|
PM truck lift do prepare cable for sensor around 15 meter x 3 ( ADI & AIMAN & EVE SONY )
|
|
2026-01-06
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TR1
|
Pulling cable and connection sensor to terminal & commissioning ML indication
|
Pulling cable and do connection sensor to terminal. Do commissioning ML indication result ok ( JAJAT & RIZAL & EDI & ANDRI & DADANG )
|
|
2026-01-06
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Fabrication tray cable to sensor ML 3 point
|
Do fabrication cable tray and install at site ( RIZAL & EDI & ANDRI & DADANG & JAJAT )
|
|
2026-01-06
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER6
|
wiring I/O 24 VDC and signal
|
PM truck lift do pulling cable power 110 VAC for DI L1C BC1-L1C BC2-L1C BC3. Also add AO at I/O ER6 and cable power 110 VAC. Continue wiring DI at junction box and panel I/O ER6 ( AGUS & MUHAIMIN & ADI & EVE FADHILAH )
|
|
2026-01-05
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-FA2
|
Cooling Fan Failure
|
Service and clean up cooling fan and filter motor at 363 FA2 result function cooling fan back to normal ( EDI & DADANG )
|
|
2026-01-05
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
FEED-BIN
|
Observation upgrade control WF feed bin
|
Do observation for upgrade control WF feed bin ( AGUS & RIZAL & MUHAIMIN )
|
|
2026-01-05
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR service analyzer
|
Clean up flange probe-probe-filter sample line-sample line-diaphragm pump=filter balston-dryer gas pump from dirty of dust. Check function of humidity sensor and filter humidity result function humidity sensor normal and filter humidity good condition ( RIZAL & ANDRI & EVE FADHILAH )
|
|
2026-01-05
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-L63-RM1
|
PMR Service Critical Motor & LSR RM&CM1
|
Clean up area motor and filter motor. Measure vibration-noise-temperature of FS and LS. Add grease 30 times-25 times for FS and LS ( EDI & DADANG )
|
|
2026-01-05
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-&-473-CC1
|
PMR Service Crit Motor & LSR KL & Cooler
|
Clean up area motor and filter motor. Measure vibration-noise-temperature of FS and LS. Add grease 30 times-35 times for FS and LS ( MUHAIMIN & EVE SONY )
|
|
2026-01-02
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Make sign for 493 AC2 and 493 AC3
|
Make sign for LCS 493 AC2 and 493 AC3 print out and laminating continue install at local ( JAJAT & ADI & EVE SONY )
|
|
2026-01-02
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER6
|
Pulling cable control L1C BC1-BC2-BC3
|
Pulling cable control for L1C BC1-LiBC2-L1C BC3 ( MUHAIMIN & ANDRI & DADANG )
|
|
2026-01-02
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
433-BF2
|
Replace or upgrade module. Issue error at process
|
Connect cable at module PLC for power input and output also cable for solenoid valve. Test function bag filter result ok interval every solenoid 5 second ( JAJAT & ADI & MUHAIMIN & EVE SONY & ANDRI & DADANG )
|
|
2025-12-31
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-FN1
|
Observation blower at 443 FN1
|
Observation blower at 443 FN1 ( MUHAIMIN & ANDRI & DADANG )
|
|
2025-12-31
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR Service analyzer Preheater & IKGA N1 + completing part for upgrade 443 2K1 at SAP
|
Clean up flange of probe, probe, filter sample line, sample line, diaphragm pump, filter balston, dryer gas pump from dirty of dust, Check function of humidity sensor and filter humidity, result function humidity sensor normal and filter good condition. Do completing part for upgrade analyzer 443 2K1 at SAP ( RIZAL )
|
|
2025-12-31
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
EP--PH--GCT-PH-KL
|
WBI Elec & Ins & Check I/O GCT, EP,PH&KL
|
Do WBI electric and instrumentation check I/O GCT-EP-PH-KL. Clean up area, also measure vibration - noise - temperature of FS and LS. Write abnormal at file check sheet. Make notification for abnormal condition ( EDI )
|
|
2025-12-31
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
FEED-BIN--RAWMILL-CT--DUST-TRASNPORT---BAG-FILTER
|
WBI Electric & Ins & Check I/O Feed Bin-RM-CT-Dust Transport-Bag Filter
|
Do WBI electric and instrumentation check I/O feed bin, rawmill, CT, dust transport, bag filter. Clean up area, also measure vibration - noise - temperature of FS and LS. Write abnormal at file check sheet. Make notification for abnormal condition ( ADI )
|
|
2025-12-31
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
BURNER-FLOOR
|
Dismalting Welding Point Burner+ Clean Up + relocation power lubrication exchanger point
|
Dismantling welding point of burner floor and continue clean area welding from dirty of dust use instrument air supply. Relocation power lubrication exchanger point ( AGUS & MUHAIMIN & ANDRI & AIMAN )
|
|
2025-12-30
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
Monitoring Heating Up
|
Do monitoring process heating up of KILN NR1 ( JAJAT & AGUS & RIZAL & EDI & ADI & ANDRI & MUHAIMIN & DADANG )
|
|
2025-12-30
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
BURNER-FLOOR
|
Activation panel welding of burner floor
|
Do connect cable power panel welding at burner floor test on result power panel welding available ( AGUS & ANDRI & MUHAIMIN & DADANG )
|
|
2025-12-30
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
Relocation and replace end point hydraulic cooling fan and blower tyer
|
Relocation end point of hydraulic cooling fan and blower tyer ( AGUS & MUHAIMIN & DADANG & ANDRI )
|
|
2025-12-30
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-BF1
|
Install Auto Drain
|
Do install AUTO drain of bag filter ( RIZAL & EDI & ADI )
|
|
2025-12-30
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
Activation panel welding 8th floor
|
Do connect cable power panel welding at 8th floor test on result power panel welding available ( RIZAL & EDI & ADI )
|
|
2025-12-30
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-BF1
|
observation all solenoid valve and installation of L63 BF1 and check relay
|
Replace puppet valve 4 each, replace cage 7 each, bag 6 each and pneumatic 1 each by mechanic team ( RIZAL & ANDRI )
|
|
2025-12-30
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER4
|
Prepare Test Drive (Pulling cable ) + Support Instalation
|
Pulling cable for test drive at ER4 also clean up panel drive motor note make hole at wall of ER4 for cable drive way and heater cable power 220 VAC ( JAJAT & EDI & RIZAL & ADI & MUHAIMIN & ANDRI & DADANG & EKO JUHAN & MARDIYANTO & FIRMAN )
|
|
2025-12-29
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
Analyzer Failure (Issue failure of cable)
|
Do repare cable at 463 2K1 result ok analyzer reading normal from process ( EDI & RIZAL )
|
|
2025-12-29
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-2K1
|
Prepare instalation analyzer DownComer (New Instalation)
|
Do prepare installation analyzer 443 2K1 for new installation ( RIZAL & EDI )
|
|
2025-12-29
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-L63-RM1
|
PMR service critical motor LSR RM-CM
|
Clean up area motor and filter motor. Measure vibration-noise-temperature FS and LS motor also clean up filter 363 FA2 from dirty of dust use instrument air supply. Add grease motor 30 times and 25 times for FS and LS motor ( AGUS & DADANG )
|
|
2025-12-29
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-&-473-CC1
|
PMR service critical motor
|
Clean up area motor and filter motor from dirty of dust use instrument air supply. Measure vibration-noise-temperature FS and LS motor. Add grease motor 30 times and 35 times for FS and LS motor ( MUHAIMIN & EVE SONY )
|
|
2025-12-26
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA6
|
Issue high up 2gE for FS and LS
|
Add grease motor for FS and LS around 20 times. Measure noise motor FS: A 1.09 gE - V 1.85 gE - H 1.51 gE; LS: A 1.66 gE - H 1.43 gE - V 1.96 gE ( ADI & EVE SONY )
|
|
2025-12-26
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Repare thermowell ex 463 KL1 T1
|
Do repare thermowell at workshop ( ANDRI & DADANG )
|
|
2025-12-26
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Assembling panel welding area cyclone raw mill
|
Do assembling welding panel for cyclone raw mill ( MUHAIMIN )
|
|
2025-12-26
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG-ROOM-
|
Clean up area and turn off AC
|
Clean up area HRG and turn off AC of HRG ( MUHAIMIN )
|
|
2025-12-26
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
TPM-423-2K1-&-ER3
|
Prepare garbage tank 2 color green and yellow of 423 2 K1 & prepare garbage tank 3 color: green - yellow-red of ER3
|
Take garbage tank for yellow and green color put at outside CEMS room and also take garbage tank for yellow-green-red color put at outside ER3 ( ADI & AIMAN )
|
|
2025-12-24
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-MD1
|
Install guarding fan
|
Install guarding fan at L63 MD1 for cooling fan ( EDI & ADI )
|
|
2025-12-24
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
Issue high O2 reading
|
Clean up probe - filter sample line - motor blower from dirty of dust. Result CO 0.002 to 0.012%, NO 1244 PPM - O2 4.34 to 5.97 % ( EDI & ADI )
|
|
2025-12-24
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-T1
|
Issue reading temperature abnormal
|
Check at local found thermowell failure. Relace sensor T/C - hosing of T/C - thermowell result temperature indication normal ( RIZAL & MUHAIMIN & DADANG )
|
|
2025-12-24
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
TPM activity form
|
Do complete TPM activity form at computer, save at file inside computer ( JAJAT & RIZAL )
|
|
2025-12-24
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
AUTO-DRAIN-OF-CM
|
Install cover of solenoid AUTO drain at L63 2K1
|
Install cover from water and hot of sun at solenoid AUTO drain ( EDI & ADI )
|
|
2025-12-24
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-SR1&-363-FN2
|
Issue high vibration ( add greasing )
|
Add grease motor at 363 SR1 M1 around 20 times, measure vibration at LS: H 6.7 mm/s, A 3.7 mm/s, V 4.7 mm/s at base plate 7.8 mm/s. Also add grease motor at 333 BC1 for FS and LS measure vibration LS: H 1.9 mm/s, V 1.7 mm/s. Add grease motor at 363 FN2 LS around 20 times measure vibration LS: V 2.3 mm/s, H 1.3 mm/s, A 1.0 mm/s ( EDI & ADI )
|
|
2025-12-23
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
IDO-TANK
|
IDO pump can not loading diesel to tank
|
Refill tube for take out diesel from truck, result start pump diesel come out from tube after touch level high tube for loading diesel ( JAJAT & EDI & ADI & EVE SONY )
|
|
2025-12-23
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER6-&-ER5
|
Cleaning ER NAR 1
|
Clean up ER6 and ER5 top also bottom from dirty of dust, also filter MCC use vacuum cleaner and mop floor ( AIMAN )
|
|
2025-12-23
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Final Drawing 443-2K2 + Drawing Remote VCS RM
|
Drawing 443 2K1 and remote VCS of 363 RM save at computer ( AGUS )
|
|
2025-12-23
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TL1
|
Activation alarm Ready to Start - Failure
|
Install indication Ready - Start - Failure for L1C BC4 at L1C TL1. Pulling cable power for lamp indication ( MUHAIMIN & ANDRI & DADANG & EVE SONY )
|
|
2025-12-23
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-FN2
|
Issue high noise for LS motor
|
Measure noise motor at LS, add grease motor around 40 times measure noise result decrease below 2 gE ( EDI & ADI )
|
|
2025-12-23
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
Issue AUTO drain abnormal
|
Check auto drain solenoid valve, found not working. Replace solenoid valve auto drain for 2 air tank at CM test function result normal function. Make cover auto drain near analyzer L63 2K1 for protect from rain ( EDI & ADI )
|
|
2025-12-22
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
TSCANNER
|
Issue problem view at CCR
|
Stick limit switch untouched, make good position of stick can touched, result view T scanner back to normal ( MUHAIMIN & ANDRI )
|
|
2025-12-22
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CO2-SYSTEM-TANK-
|
Observation safety valve CO ( issue energize )
|
Check at local for safety valve, release valve CO result normal. Note safety valve over pressure make energize ( RIZAL & ANDRI )
|
|
2025-12-22
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-BF1
|
Observation solenoid purging L63 BF1 issue high draff
|
Check at local found tube hose broke, replace tube of solenoid purging at L63 BF1 result drafft back to normal ( RIZAL & ANDRI & EVE SONI )
|
|
2025-12-22
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-&-L63-RM1
|
PMR Service Critical Motor & LSR Kiln & Cooler 1
|
Clean up area motor and filter motor from dirty of dust use instrument air supply. Measure vibration - noise - temperature for FS and LS. Add grease 30 times - 25 times for FS and LS motor ( AGUS & DADANG )
|
|
2025-12-22
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-443-PH1
|
PMR service critical motor LSR RM-CM
|
Clean up area motor and filter motor also filter motor 363 FA2 from dirty of dust use instrument air supply. Measure vibration - noise - temperature for FS and LS. Add grease 20 times - 25 times for FS and LS motor ( ADI & MUHAIMIN )
|
|
2025-12-19
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
T-SCANNER
|
Issue problem view at CCR
|
Check stick limit switch zero not untouched, repare stick at limit switch zero result T scanner view normal at CCR ( RIZAL & ANDRI )
|
|
2025-12-19
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-2K1
|
Prepare Support Cable of 443-2K1
|
Do prepare support cable at 443 2K1. Measure part cable needed from analyzer ti I/o panel around 553 meter ( RIZAL & EDI & EVE SAFIR & ANDRI )
|
|
2025-12-19
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Scanning PMR dan WBI period July-December 2025
|
Do put back check sheet after scanning. Print out data check sheet 2 until 4 copies for some PMR and WBI ( JAJAT & ADI )
|
|
2025-12-18
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Observation recondition motor OH 2026
|
Do observation recondition motor for OH 2026 ( AGUS & MUHAIMIN )
|
|
2025-12-18
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
TSCANNER
|
Issue error
|
Replace stick for solenoid valve result ok ( RIZAL & ANDRI )
|
|
2025-12-18
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Fabrication or prepare level sensor L1C TL1
|
Do fabrication sensor level at workshop for L1C TL1 ( EDI & EVE SAFIR )
|
|
2025-12-18
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Scanning PMR dan WBI periode July-December 2025
|
Complete data check sheet PMR and WBI start month July to December 2025, continue scanning data check sheet send to Mr.Jajat ( JAJAT & ADI )
|
|
2025-12-17
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
SOLAR-TANK
|
Check function of sump pump
|
Check function sump pump, On breaker sump pump, result function normal. Note there is joint pipe failure advise repare joint pipe immeadiately ( EDI & ADI )
|
|
2025-12-17
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Observation recondition motor OH 2026
|
Observation data recondition motor of OH 2026 write data at computer as DATA MOTOR OH26 ( AGUS & MUHAIMIN )
|
|
2025-12-17
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA3
|
Issue Pressure zero
|
Replace pressure tube at 473 FA3 result indication pressure normal ( RIZAL & ANDRI & DADANG )
|
|
2025-12-17
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
433-FM2
|
Issue Error LC
|
Check at location found there is cable short to body panel, repare cable cover with isolation cable result indication normal ( RIZAL & ANDRI )
|
|
2025-12-17
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
fabrication sensor material level L1C TR1
|
Do fabrication sensor material level for L1C TR1 at workshop ( ANDRI & DADANG )
|
|
2025-12-17
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-CC1-&-483-BL7
|
GREASING-MOTOR->-200-KW
|
Add greasing motor for FS and LS around 10 times of motor ( EDI & ADI )
|
|
2025-12-17
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA6
|
Issue high vibration motor at FS and LS
|
Check found tank of AUTO grease low level, replace tank of AUTO grease motor with spare unit. Add grease motor at FS and LS around 15 times, measure vibration motor result 1.7 mm/s and 2.9 mm/s ( EDI & ADI )
|
|
2025-12-16
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-FN1
|
Issue AUTOBALANCER problem
|
Replace module and repare socket ( AGUS & MUHAIMIN )
|
|
2025-12-16
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3
|
Observation part needed piping AC robicon ER3 ( compare item number at WH )
|
Measure pipe 4 inchi needed at local around 32 meter. Check pipe 4 inchi at warehouse found but there are no elbow for 4 inchi and 2.5 inchi ( EDI & ADI )
|
|
2025-12-16
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-443-PH1
|
PMR service critical motor LSR RM-CM
|
Clean up area motor and filter motor. Measure vibration - noise - temperature FS & LS motor. Add grease motor 35 times - 30 times for FS and LS motor. Refill AUTO grease motor ( AGUS & DADANG )
|
|
2025-12-16
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-&-473-CC1
|
PMR service critical motor LSR KL-CM
|
Clean up area motor and filter motor. Measure vibration - noise - temperature FS & LS motor. Add grease motor 25 times - 30 times for FS and LS motor ( MUHAIMIN & EVE SAFIR )
|
|
2025-12-16
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR service CEMS
|
Clean up purge air motor and filter purge air motor, clean up flange with tube - swivel window T/R & R - alignment dust hunter. clean up transducer A & B for flowsic 100, CEMS room - filter cabinet MCS 100E - CEMS gas room from dirty of dust use instrument air supply ( RIZAL & ROMY & ANDRI )
|
|
2025-12-12
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Observation recondition motor for over haul 2026
|
Do observation for recondition motor OH 2026 ( AGUS & MUHAIMIN )
|
|
2025-12-12
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR service analyzer
|
Clean up flange probe - sample line tube -filter sample line - diaphragm pump - dryer gas pump - filter balston from dirty of coal. Check function of humidity sensor and filter humidity result function sensor humidity normal and filter humidity good condition ( RIZAL & ROMY )
|
|
2025-12-12
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
Replace and configuration CCTV at outside of HRG
|
Check communication CCTV at outside HRG result bad communication. Replace CCTV with spare camera test communication result normal view at outside of HRG ( AGUS & JAJAT & EDI & ADI & DADANG )
|
|
2025-12-11
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Setting MICOM with actual temperature
|
Do setting MICOM with standard actual temperature use calibrator of temperature result indication different 7 degree celcius. Install MICOM at ER3 test run function result ok ( AGUS & EDI & MUHAIMIN )
|
|
2025-12-11
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG-ROOM-
|
Cleaning area HRG
|
Do clean up area HRG room and panel of HRG use instrument air supply ( JAJAT & ADI & DEVI )
|
|
2025-12-11
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Fabrication additional HRG filter
|
Do fabrication for filter additional of HRG ( ANDRI & DADANG )
|
|
2025-12-11
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR service CEMS
|
Cleaning area motor purge air unit and filter motor, cleaning swivel window reflector and t/r unit dust hunter also flange with tube and alignment dust hunter, transducer A & transducer B flowsic 100, CEMS room, filter cabinet MCS 100E and CEMS gas room from dirty of dust use instrument air supply ( RIZAL & EVE SAFIR )
|
|
2025-12-10
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
Clean up panel I/O
|
Cleaning up panel I/O area raw mill, 363 FN2, 363 BC1, feed bin from dirty of dust use hand blower ( JAJAT & ADI )
|
|
2025-12-10
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-FN1-&-363-FN2
|
Cleaning motor and filter motor
|
Do clean up area motor and filter motor from dirty of dust use instrument air supply and equipment cleaning tools ( ADI & EDI )
|
|
2025-12-10
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-PF1
|
Panel HMI issue error communication
|
Check cable communication result good communication cable ( RIZAL & JAJAT )
|
|
2025-12-10
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1
|
Cleaning and check motor also CB and connection
|
Cleaning up area motor and filter motor also filter motor 363 FN2 also carbon brush room from dirty of dust use instrument air supply. Measure long carbon brush result normal ( EDI & EVE SAFIR )
|
|
2025-12-10
3 months ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
363-CV1
|
Issue oil come to motor check and install oil CPME to motor
|
Dismantling motor bring to workshop. Replace bearing motor install at site refill oil motor test run motor measure ampere result ok ( RIZAL & MUHAIMIN & EDI & ANDRI & DADANG )
|
|
2025-12-15
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-SR1
|
Issue high noise 7 gE
|
Add grease motor at FS and LS measure vibration & noise result below 4 mm/s and below 2 gE ( EDI & ROMY )
|
|
2025-12-09
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR service analyzer
|
Clean up flange probe - probe - filter sample line - sample line tube - diaphragm pump - filter balston - dryer gas pump from dirty of dust use instrument air supply. Check function humidity sensor and filter humidity result function sensor good and filter humidity good condition ( EDI & ADI & ROMY )
|
|
2025-12-09
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Prepare presentation TPM
|
Do prepare presentation for TPM ( JAJAT & RIZAL & MUHAIMIN )
|
|
2025-12-15
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-&-BURNER-FLOOR
|
Connect welding point
|
Do connect welding point area kiln and burner ( MUHAIMIN & ANDRI & DADANG & EVE SAFIR )
|
|
2025-12-15
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
413-3B1-&-3B2-&-463-KL1-&-473-CC1-&-443-PH1
|
clean up panel I/O
|
Do clean up panel I/O area blending east-blending west, KILN, Cooler and PH from dirty of dust use hand blower and equipment cleaning tool ( RIZAL & ADI & ROMY )
|
|
2025-12-15
3 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-FN1
|
AUTO Balancer support Mr. Eko Juan observation problem
|
Do replace controller result AUTO Balancer ready ( EKO & AGUS )
|
|
2025-12-08
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Complete also scan WBI & PMR support for AUDIT
|
Do complete data check sheet WBI and PMR 2025 for WBI elevator month July to November 2025 and calibration month of August 2025 ( JAJAT & ADI )
|
|
2025-12-08
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
Cross check temperature preheater
|
Do cross check indication temperature at preheater. Adjust range at temperature transmitter to make same indication between local and CCR ( RIZAL & ANDRI )
|
|
2025-12-08
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-443-PH1
|
PMR Service Critical Motor MD + FN (Raw Mill) + check RTD Motor ( special T6 )
|
Clean up area motor and filter motor. Measure vibration -noise - temperature for FS and LS motor. Add grease motor 25 times and 30 times for FS and LS motor. Also check RTD motor T6 at 363 MD1 result resistance RTD 144 ohm( AGUS & MUHAIMIN )
|
|
2025-12-08
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-&-L63-RM1
|
PMR Service Critical Motor Kiln + CM
|
Clean up area motor and filter motor. Measure vibration - noise - temperature FS and LS motor. Add grease motor 15 times - 25 times for FS and LS motor ( EDI & DADANG )
|
|
2025-12-05
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WF-LIMESTONE
|
Observation issue activation weigh feeder limestone high grade
|
Do observation at WF limestone high grade result ok ( RIZAL & MUHAIMIN )
|
|
2025-12-05
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Prepare Motor Rewinding (Blower Fan)
|
Do prepare motor for rewinding at workshop ( MUHAIMIN & JAJAT & DADANG & EDI )
|
|
2025-12-05
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER#-&-ER4-&-ER5-&-ER6
|
Cleaning MCC room
|
Do clean up MCC room for ER3 - ER4 - ER5 - ER6 from dirty of dust. Mop electrical room with equipment cleaning tool ( AIMAN )
|
|
2025-12-05
4 months ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
L1C-TR1
|
Prepare part project CCTV truck lift
|
Prepare part for project installation CCTV at L1C TR1 ( AGUS & MUHAIMIN )
|
|
2025-12-05
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TR1
|
Reposition probe sensor material level
|
Reposition probe sensor material level at L1C TR1. Test function probe sensor material level result ok function normal ( RIZAL & ANDRI & DADANG )
|
|
2025-12-05
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-EL1
|
PMR Serv. Elevator PH NAR1 & WBI Sump El
|
Do PMR Serv. Elevator PH NAR1 & WBI Sump El. Clean up 8th floor, 1st to 8th every door of elevator door from dirty of dust. Note lamp indication inside elevator off for 5th and 2nd floor ( EDI & ADI )
|
|
2025-12-05
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
413-3B1&-3B2-&-473-CC1
|
WBI Elec & Ins & Check I/O & S Pump Blending and Cooler
|
Do WBI Elec & Ins & Check I/O & S Pump Blending & ,Cooler. Test function sump pump motor result ok function Note need to clean up sensor sump pump at IDO tank ( EDI & ADI )
|
|
2025-12-04
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1
|
PMS Raw Mill
|
Do clean up CB room and finding 2 ea CB already shorth, Replace CB ( AGUS & RIZAL & ANDRI & DADANG )
|
|
2025-12-04
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Prepare Motor Blower Rewinding
|
Prepare rewinding motor blower 463 FX6 ( EDI & ADI )
|
|
2025-12-04
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TR1
|
Prepare part project CCTV truck lift
|
Prepare part of project CCTV at truck lift ( AGUS & RIZAL & ANDRI & DADANG )
|
|
2025-12-04
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TR1-&-L3C-RE1
|
Cleaning panel of coal ( PM )
|
Do clean up panel of coal ( JAJAT & AIMAN )
|
|
2025-12-04
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1-&-463-KL1-
|
WBI Elec & Ins & Check I/O GCT, EP,PH&KL
|
Do WBI Elec & Ins & Check I/O GCT, EP,PH&KL. Measure vibration - noise - temperature FS and LS write at form for abnormal condition. Make notification for abnormal condition ( ADI & EVE SAFIR )
|
|
2025-12-04
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-423-BF1-&-FEED-BIN
|
WBI Electric & Ins & Check I/O Feed Bin
|
Do WBI Electric & Ins & Check I/O Feed Bin. Measure vibration - noise - temperature FS and LS for motor ( EDI )
|
|
2025-12-03
4 months ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
393-FN3
|
Issue motor burned
|
Do dismantle motor bring to workshop. Install motor spare at location also measure ampere motor R-S-T result ok ( EDI & DADANG )
|
|
2025-12-03
4 months ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
L1C-TR1
|
Observation part needed for installation CCTV
|
Do estimation part need for project installation CCTV ( RIZAL & EDI & DADANG )
|
|
2025-12-03
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TR1
|
Install sensor material level and Cleaning radio link and Control
|
Fabrication and installation sensor material level do monitoring function sensor result ok. Do clean up radio link and control ( RIZAL & ANDRI & AIMAN )
|
|
2025-12-03
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-FX6
|
Issue motor burned
|
Dismantle motor shell cooling kiln bring to workshop. Install motor spare at location test run function result normal motor running ok ( AGUS & EDI & DADANG )
|
|
2025-12-01
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR service analyzer
|
Clean up flange probe, probe, filter sample line, diaphragm pump, filter balston, dryer gas pump from dirty of dust. Check function humidity sensor and filter humidity, result function sensor normal and filter humidity good condition ( RIZAL & ANDRI )
|
|
2025-12-01
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-T1
|
Issue reading temperature abnormal
|
Replace thermowell because existing bad condition. Cross check reading temperature result around 1020 degree celcius ( RIZAL & ANDRI )
|
|
2025-12-01
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-&-473-CC1
|
PMR Critical Motor Area Kiln
|
Clean up area motor and filter motor. Measure vibration - noise - temperature FS and LS. Add grease 10 times - 15 times for FS and LS motor ( AGUS & EVE SAFIR )
|
|
2025-11-28
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1-&-423-FN1-&-L63-MD1
|
Issue high noise information from CBM Mr. Najib
|
Add grease motor 15 times for FS and LS motor. Measure vibration result below 4 mm/s and noise below 2 gE ( EDI & DADANG )
|
|
2025-11-28
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
Continue repare lighting lamp area preheater 7th floor
|
Install pipe for cable power lighting lamp. Connection cable power lighting lamp test on result lighting lamp ON ( EDI & DADANG )
|
|
2025-11-28
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Continue fabrication filter HRG
|
Do fabrication filter HRG ( ANDRI & DADANG )
|
|
2025-11-28
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-FN1
|
Support AutoBalancer Test
|
Do support test for AUTOBALANCER result normal ( JAJAT & AGUS & ANDRI )
|
|
2025-11-28
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Complete data check sheet WBI and PMR 2025
|
Completing data check sheet WBI and PMR year of 2025 prepare for AUDIT ( ADI & EDI )
|
|
2025-11-27
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TR1
|
Prepare CCTV for Truck lift (2 each)
|
Prepare CCTV 2 each for L1C TL1 ( AGUS & JAJAT )
|
|
2025-11-27
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
Continue repare lighting lamp area preheater
|
Install panel junction box - pipe - pulling cable power from lighting lamp to junction box ( EDI & ADI & EVE SAFIR & DADANG )
|
|
2025-11-27
4 months ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
443-FN1
|
AutoBalancer Info Error (Check all sensor)
|
Check sensor AUTOBALANCER result normal (AGUS & ANDRI & DADANG )
|
|
2025-11-27
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SG9
|
Issue indication abnormal for open and closed
|
Check function limit switch open and close at local, test function open and close but indication still failure. Found stick limit switch for closed bad condition replace stick limit switch test function open and closed result indication normal ( EDI & ADI & EVE SAFIR & DADANG )
|
|
2025-11-26
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ELECTRIC-ROOM
|
Inspection electrci room ( make sure there is keys replace if there is no inspection all electric room )
|
Do inspection electric room 3-4-5-6 and there is key for door electric room ( AIMAN )
|
|
2025-11-26
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TL1
|
Prepare CCTV for Truck lift ( 2 each )
|
Do prepare CCTV 2 each for truck lift ( AGUS & JAJAT )
|
|
2025-11-26
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
Inspection lighting area 443 PH1 4th floor - 6th- 7th - 8th floor
|
Check lighting lamp at 4h floor result 1 lighting lamp off, 6th floor 1 lighting lamp off, 7th floor 3 lighting lamp off, 8th floor result 7 lighting lamp off. Replace lighting lamp 3 each at 7th floor test on result 1 lighting lamp ON, connecting power cable lighting lap at 6th floor join with AFR lighting lamp result lighting lamp ON ( EDI & ADI & DADANG )
|
|
2025-11-26
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR service analyzer also replace 3 way valve
|
Clean up flange probe - probe - filter sample - sample line - diaphragm pump - filter balston - dryer gas pump from dirty of dust. Check function of humidity sensor and filter humidity result function humidity sensor normal and filter sensor good condition. Replace 3 way valve at 463 2K1 ( RIZAL & EVE SAFIR & ANDRI )
|
|
2025-11-26
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
YM CEMS support MCAL
|
Do support YM CEMS for MCAL with Mr. Hannes and Mr. Adrianus from Kiss Industrial Company ( RIZAL & ANDRI & KISS COMPANY )
|
|
2025-11-25
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
Issue problem at FIDOR
|
Flame off for FIDOR. Check supply H2 set to 3 bar supply gas input H2 at FIDOR available, reset air instrument air suply from normal to 0 PSI and resetting normal again also clean up connector for H2 gas at FIDOR found there is some dirty inside .Found fuse 4A at MCS 100E blown out, replace fuse with 6A result found there is jumpered cable at card. Dismantling jumpered cable at power on result ok Note FIDOR still flame off ( HANNES & JAJAT & ADI )
|
|
2025-11-25
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1
|
Issue high winding temperature information from CBM Mr. Najib
|
Clean up filter 363 FA2. Check thermal stater up 80% because high fluctuation ampere until 265 A ( JAJAT & AGUS )
|
|
2025-11-25
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-MD1
|
Issue high noise information from CBM Mr.Najib
|
Clean up area motor and filter motor. Measure vibration and noise motor FS and LS result FS HVA: 1.1 to 3.7 mm/s and 1.60 to 3.44 gE LS HVA: 1.2 to 2.9 mm/s and 0.65 to 3.34 gE ( JAJAT & AGUS )
|
|
2025-11-25
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SC3
|
Fabrication cable rel and make position of cable and install terminal of 393 SC3 SGD-SGE-SGF
|
Do fabrication cable rel and make cable position and install terminal 393 SC3 for SGD - SGE - SGF ( EDI & ANDRI & DADANG )
|
|
2025-11-25
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Prepare CCTV for truck lift 2 each
|
Do prepare CCTV for truck lift 2 each ( AGUS )
|
|
2025-11-25
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
Front Cover probe broken
|
Replace front cover probe ( JAJAT & ANDRI )
|
|
2025-11-24
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
Issue pump clorine abnormal function
|
Modification pipe way clorine ( JAJAT & EVE SAFIR )
|
|
2025-11-24
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-BF1
|
Issue leakage compartement 2 & 8
|
All solenoid are working, replace big membrane but still find leakage at small s/v ( RIZAL & ADI & ANDRI )
|
|
2025-11-24
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-L63-CM1-463-KL1-473-CC1
|
PMR service critical motor RM-KL-CC
|
Clean up area motor and filter motor. Measure vibration-noise-temperature FS and LS. Add grease motor 20 times-25 times-30 times for FS and LS motor and check carbon brush ( AGUS & EVE SAFIR & DADANG )
|
|
2025-11-22
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SC3-&-ER3
|
Pulling cable KDRT, also pulling cable SGD - SGE - SGF; fabrication speed motion for 393 SC3; ER3: pulling cable remote VCS, signal S & G
|
Pulling cable of KDRT also fabrication speed motion and pulling cable SGD-SGE-SGF for 393 SC3 and Pulling cable at ER3 for remote VCS and signal S & signal G ( JAJAT & AGUS & RIZAL & EDI & ADI & MUHAIMIN & ANDRI & DADANG )
|
|
2025-11-21
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
33-WF1
|
Calibration zero and span
|
Do calibration zero and span result zero: 0.0 t/h span 162 t/h ( calculation 52.5 / 0.42 x 0.36 x 3.6 = 162 t/h ) ( RIZAL & ANDRI )
|
|
2025-11-21
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-CV1
|
Issue oil come inside motor
|
Dismantling motor bring to workshop, replace bearing. Install motor measure ampere motor result 6.03 ampere - 6.43 ampere -7.43 ampere also measure vibration and noise motor result 0.0 mm/s and 0.45 gE ( JJAJAT & AGUS & EDI & MUHAIMIN & DADANG )
|
|
2025-11-21
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3;-ER4;-ER5;-ER6
|
Inspection ALL ER
|
Do clean up electric room use brush and vacuum cleaner and continue mop electric room also clean up filter cabinet ( AIMAN )
|
|
2025-11-21
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3
|
Observation extend DI at 363 FN1
|
Prepare cable installation ( JAJAT & RIZAL )
|
|
2025-11-21
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA1;-473-FA3;-473-FA4;-473-FA6
|
Add grease motor issue high noise motor up to 2 gE information from CBM Mr. Najib
|
Add grease motor cooler measure noise motor result decrease below 2 gE for 473 FA1 - 473 FA3 - 473 FA4 - 473 FA6 ( EDI & ADI )
|
|
2025-11-21
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TL1
|
Repare Short cable
|
Replace short cable for lighting lamp. Test on lighting lamp result ok normal ( AGUS & MUHAIMIN & ANDRI )
|
|
2025-11-21
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-BC1-&-L1C-BC2-&-L1C-BC3
|
Repare / instal lighting lamp tail L1C-BC1-3
|
Replace blinking lighting lamp west side 2 each for room of L1C BC1-3 and east side 1 each at L1C BC2. Test on result lighting lamp ok all lighting lamp on ( EDI & ADI & DADANG )
|
|
2025-11-20
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Complete data check sheet PMR and WBI month of november 2025
|
Do completing data check sheet PMR analyzer L63 2K1 - L63 2K2 - L63 2K3 - 483 2K1 - 463 2K1 - 443 2K1 - 423 2K1; PMR IR TAD - T scanner - CCTV - Camera burner; PMR service hoist crane; PMR service critical motor KL & CM; WBI electrical & instrumentation bottom blending - kiln - cooler - clinker silo ; WBI electrical & instrumentation top blending - CT - PH - kiln; WBI electrical & instrumentation CM - truck lift - BC transport - tripper - reclaimer coal; WBI electrical & instrumentation feed bin - raw mill - CT - dust transport - BF for month of november 2025 ( JAJAT & ADI )
|
|
2025-11-20
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TL1
|
Trucklift PM ( repair support for LCS BC1-3, observation safety device BD-ML, relocation cable BD of tripper )
|
Repaire Rel LCS BC1-3, Dismantling unuse cable, install and fabrication new lighting lamp, repaire / replace solenoid water L1-BC5. repaire pull core at TR1, observation installation LAN at L1C TL1 ( JAJAT & AGUS & RIZAL & EDI & ANDRI & MUHAIMIN & DADANG )
|
|
2025-11-19
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-BC4
|
Replace lighting lamp off
|
Install 2 eah lighting lamp LED ( EDI & ADI & DADANG )
|
|
2025-11-19
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-FN1-M1
|
install motor
|
Do install motor at 483 FN1 M1. Test function motor measure ampere motor with open damper 65% result 48.7 ampere; 100% result 5.34 ampere with setting OL 7 ampere ( JAJAT & AGUS & RIZAL & MUHAIMIN & DADANG )
|
|
2025-11-19
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-MD1-&-483-BL5-&-493-FN5
|
Issue high vibration up 24 mm/s and high noise up 6 gE
|
Add grease motor 15 times for FS and LS. Measure vibration and noise motor result below 4 mm/s also below 2 gE. Note 493 FN5 there is no point for grease motor also measure vibration from base plat motor result high vibration ( EDI & ADI )
|
|
2025-11-19
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-FA2
|
V-belt motor are cracked bad condition
|
Do replace v-blet v-800 3 each ( EDI & ADI )
|
|
2025-11-18
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ANALYZER-ROOM
|
Cleaning up room analyzer
|
Clean up analyzer room from dirty of dust use brush and instrument air supply ( AIMAN )
|
|
2025-11-18
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR service CEMS
|
Clean up purge air unit motor and filter purge air unit. Also clean up swivel window T/R unit and R unit for dust hunter and flange with tube from dirty of dust. Do alignment dust hunter. Clean up transducer A & transducer B for flowsic 100. Clean up CEMS room and gas botle room and fan cabinet MCS 100 E from dirty of dust ( RIZAL & ENDEN )
|
|
2025-11-18
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-FN1-M1-&-483-FN1-M2
|
Issue motor noise for M1 and trip OCR also breaker. Observation motor
|
Check actual process at CCR, found 483 FN1 M2 running, but 483 FN1 M1 stop. Check at local use meger test found 2 phase ground. Bring down existing motor. Found 3.7 KW same existing motor bring to workshop from ware house. Measure ampere motor stable 3.6 ampere ( JAJAT & AGUS & EDI & ADI & MUHAIMIN & DADANG & ENDEN )
|
|
2025-11-17
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TR1
|
Resetting position of material level and timer ML from 10 s to 5 s
|
Do resetting sensor material level and change timer from 10 second to 5 second ( RIZAL & ADI & ANDRI & DADANG )
|
|
2025-11-17
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-BC4
|
Activated horn at L1C BC4
|
Do install horn at L1C BC4 and connected cable power for horn and cable DO at ER6. Test function horn result success ( JAJAT & AGUS & ADI & MUHAIMIN & DADANG )
|
|
2025-11-17
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR service analyzer
|
Clean up flange probe - probe - filter sample line - sample line - diaphragm pump - filter balston - dryer gas pump from dirty of dust. Check function humidity sensor result function normal also check filter humidity sensor result condition filter good ( RIZAL & ANDRI )
|
|
2025-11-17
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-&-L63-RM1
|
PMR critical motor area KILN & CM
|
Clean up area motor and filter motor. Measure vibration - noise - temperature of FS and LS. Add grease 20 times - 30 times for FS and LS motor ( AGUS & DADANG )
|
|
2025-11-17
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM-&-463-KL1
|
PMR critical motor area RM & KILN
|
Clean area motor and filter motor also filter 363 FA2. Measure vibration, noise and temperature of FS and LS. Add grease 10 times - 15 times - 25 times for FS and LS motor. Repaire AUTO grease pump for 363 FN2 ( MUHAIMIN & ADI )
|
|
2025-11-14
4 months ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
HRG
|
Prepare subtitution and fabrication filter substitution HRG
|
Take materials elbow plate from warehouse. Fabrication support filter substitution at workshop ( ANDRI & MUHAIMIN & DADANG )
|
|
2025-11-14
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KH1-P1
|
Issue indication pressure low at operator CCR
|
Cross check indication pressure at local. Do blow up tubing for pressure and zero adjust of pressure transmitter and measure pressure hood draft result indication pressure at local from 0.1 to 0.7 compare with reading CCR same ( RIZAL & ANDRI )
|
|
2025-11-14
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-FN1-&-473-FA6
|
Issue high noise motor 6.3 gE for 423 FN1 & 13.6 gE also 5.6 gE for 473 FA6
|
Add grease motor 15 times for FS and LS, measure noise motor result for 423 FN1 FS V: 1.49 gE H: 0.67 gE A: 1.48 gE - LS A: 1.18 gE V: 1.07 gE H: 1.33 gE; for 473 FA6 LS: 1.15 gE FS: 1.04 gE ( MUHAIMIN & ADI )
|
|
2025-11-14
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORKSHOP-ELECTRIC-1
|
Prepare take plat cable 12 core from NR2
|
Do take plat cable 12 core at electric Nr2 bring to workshop electric Nr1 ( AIMAN & DADANG )
|
|
2025-11-14
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR service analyzer
|
Clean up flange probe, probe, filter sample, sample line, diaphragm pump, filter balston from dirty dust. Check function humidity sensor and filter humidity result function humidity sensor normal and filter humidity good condition. Note replace dryer gas at 463 2K1 with spare unit because existing fault ( RIZAL & ANDRI )
|
|
2025-11-14
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-BL7
|
Issue cooling fan off
|
Take cooling fan at ER3, fabrication supporting cooling fan at workshop. Install cooling fan at 483 BL7 test function result fan running normal ( AGUS & DADANG )
|
|
2025-11-14
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HOIST-L1C-TR1
|
Hoist L1C TR1 issue can not start at local ( support for certification hoist by 3rd party )
|
Check at ER6 found power of for hoist at L1C TR1, make On for breaker hoist test function result can start at local ( ADI & MUHAIMIN & JOKO SAFETY )
|
|
2025-11-13
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TR1
|
Install senso material level and power supply 220 VAC
|
Fabrication support for sensor material level at workshop. Install sensor material level at L1C TR1. Do test function L1C TR1 and activation sensor material level, result function sensor normal. Install power 220 VAC at L1C TR1, test function power 220 VAC result normal ( JAJAT & RIZAL & ADI & MUHAIMIN & DADANG )
|
|
2025-11-13
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER4-&-ER5
|
Issue sealing trafo room bad condition information finding from CBM
|
Add sealing for area finding CBM Mr. Najib for trafo ER4 and ER5 ( AGUS & DADANG )
|
|
2025-11-13
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-BL7
|
Issue noise high 5.6 gE and high vibration 4.5 mm/s
|
Add grease motor result noise reduce back to normal below 2 gE and vibration below 4 mm/s ( AGUS & DADANG )
|
|
2025-11-13
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA6
|
Cross check pressure point
|
Clean up tubing sample pressure point and flange pressure point from dirty of dust result pressure back to normal condition ( JAJAT & ADI & MUHAIMIN )
|
|
2025-11-13
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
CEMS problem board abnormal
|
Check at site found 5 VDC drop to 4.8 VDC increase voltage to 5.0 VDC and clean up filter and tighten cable connection result CEMS back to normal ( RIZAL & ANDRI )
|
|
2025-11-13
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-BL7
|
Issue noise high 5.6 gE and vibration 4.5 mm/s
|
Add grease motor result noise reduce back to normal below 2 gE and vibration below 4 mm/s ( AGUS & DADANG )
|
|
2025-11-12
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-SC3
|
Issue pulse motion bad condition
|
Clean up probe sensor and propeller and tighten cable at pre amplifier card result pulse motion back to normal and already indication at CCR operator ( MUHAIMIN & DADANG )
|
|
2025-11-12
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Complete data check sheet report PMR and WBI month november 2025
|
Do completing data check sheet report for PMR analyzer L63 2K1-L63 2K2-L63 2K3-483 2K1-463 2K1-443 2K1-423 2K1; PMR camera burner-IR TAD-T scanner-CCTV; PMR service critical motor 363 MD1-363 FN1-363 FN2-423 FN1-443 FN1-L63 MD1-L63 FN1-473 FN7-463 MD1 for month of november 2025 ( JAJAT & ADI )
|
|
2025-11-12
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-CP1
|
Install lighting lamp
|
Installing lighting lamp at 393 CP1, test function lighting lamp result normal on ( MUHAIMIN & DADANG )
|
|
2025-11-12
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-&-473-CC1
|
Continue PMR service critical motor are KL & CM
|
Clean up area motor and filter motor. Measure vibration, noise and temperature for FS and LS. Add grease motor for FS and LS for 30 times 35 times area L63 RM & 463 KL1 ( AGUS )
|
|
2025-11-12
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-BF1
|
Issue problem at compartemen 4 & compartemen 11
|
Replace solenoid valve 2 each at compartemen 4 and compartemen 11, test function solenoid valve of purging result ok function normal ( RIZAL & ANDRI )
|
|
2025-11-11
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
Issue chiller problem
|
Check at local, do jumper cable test on, found i motor bad condition. Dismantling motor chiller, bring to workshop. Install back support and cover motor chiller. Clean up area HRG from dirty of dust use instrument air also filter HRG ( JAJAT & AGUS & ADI & ANDRI & MUHAIMIN & DADANG )
|
|
2025-11-11
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-463-KL1
|
PMR Service Critical Motor & LSR RM & CM1 & KL
|
Clean up area motor and filter motor. Measure vibration, noise and temperature for FS and LS. Add grease motor for FS and LS for 20 times, 25 times and 30 times ( AGUS & DADANG )
|
|
2025-11-10
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TR1
|
Continue pending Job
|
Activation alarm Over travel, Brake Motor, Install Motion and propeller SX1-SX3 also propeller at BC3 ( AGUS & JAJAT & RIZAL & ADI & ANDRI & MUHAIMIN & DADANG )
|
|
2025-11-10
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-BF1
|
Issue compartemen 10 Abnormal
|
Replace membran solenoid valve. Test function result ok ( RIZAL & ANDRI )
|
|
2025-11-10
4 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
MAIN-GATE-ACCES-CONTROL
|
Inspection welding and electrical tools of PT Indoporlen and PT RMP
|
Do inspection electrical and welding tools of PT INDOPORLEN & PT RMP Tagging with yellow color for all equipment ( ADI & JAJAT )
|
|
2025-11-07
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-GQ1
|
Prepare fabrication re-position Sensor Pressure 473-GQ1
|
Do fabrication for reposition sensor pressure. Install at location result indication normal ( RIZAL & ANDRI & DADANG )
|
|
2025-11-07
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-463-KL1-&-L63-RM1
|
WBI Switchgear, Cap & Trafo RM, KL & CM1
|
Do WBI Switchgear, Cap & Trafo RM, KL & CM1 ( MUHAIMIN )
|
|
2025-11-07
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
BOTTOME-BLENDING--473-CC1-493-3S1
|
WBI Elec & Ins & Check I/O & S Pump Bl,C
|
Clean up panel I/O area clinker silo-cooler-bottom blending outside panel use equipment cleaning tools. Check function of sump pump result norma function note repaire propeller sump pump L1C BC4 because at outside tank test function sump pump result ok ( EDI & ADI )
|
|
2025-11-07
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
PPUP-WORKSHOP
|
Check Tools Area PPUP
|
Inspection electrical tools of PPUP for mixer-cutting machine-portable compressor-genset. Repaire support for cutting machine reason is not requirement safety plant. Tagging equipment with yellow color ( EDI & ADI )
|
|
2025-11-06
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TR1
|
Issue for L1C BC6 can not start and tidy up cable PLC
|
Check at program found there is some failure at L1C BC6 after reset and run AUTO program result L1C BC6 can run. Tidy up un use cable at PLC result ok ( JAJAT & AGUS & EDI & ADI & MUHAIMIN & DADANG )
|
|
2025-11-06
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA4
|
Issue indication abnormal
|
Check at location found leakage of tubing sample pressure and some material block inside tubing, repaire leakage tubing and clean up sample line tubing result indication pressure back to normal at CCR ( RIZAL & ANDRI )
|
|
2025-11-05
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TR1
|
Continue Project L1C-TR1
|
Test run indication signal ready-run-trip-emergency for L1C BC1 to L1C BC7, also signal pcs and bd-tonase result ok ( JAJAT & AGUS & RIZAL & ADI & ANDRI & MUHAIMIN & DADANG & EDI )
|
|
2025-11-04
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TR1
|
PROJECT L1C-TR1
|
Do connection wiring cable for project L1C TR1. Do test function for start-running-trip-failure for L1C BC1-L1C BC2-L1C BC3-L1C BC7-L1C SX1-L1C SX2-L1C SX3 result ok also measure ampere motor result ampere of SX: 2.1 to 4.2 A for BC: 8.8 to 9.4 A ( JAJAT & AGUS & RIZAL & EDI & ADI & ANDRI & MUHAIMIN & DADANG & AIMAN )
|
|
2025-11-04
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-BF1
|
Issue purging abnormal
|
Check function solenoid valve purging bag filter found 8 membran for solenoid valve bad condition. Replace 8 membran solenoid valve test function result normal function ( RIZAL & ANDRI )
|
|
2025-11-03
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
Replace clorine pump issue pump performance pump already decrase
|
Replace pump clorine with spare pump test function pump result ok ( EDI & ADI )
|
|
2025-11-03
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
Indication temperature outlet fluctuation
|
Replace sensor temperature with spare result indication temperature normal ( RIZAL & ANDRI )
|
|
2025-11-03
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Final Drawing Upgrade L1C-TR1
|
Do final drawing for upgrade L1C-TR1 save at computer ( AGUS )
|
|
2025-11-03
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-463-KL1
|
PMR service critical motor LSR RM-CM
|
Do clean area motor and filter motor. Measure vibration, noise, temperature for FS and LS motor. Add grease for 20 times and 30 times for FS and LS motor ( EDI & ADI )
|
|
2025-11-03
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-&-L63-RM1
|
PMR Service Critical Motor & LSR Kiln & Cooler 1
|
Do clean area motor and filter motor. Measure vibration, noise, temperature for FS and LS motor. Add grease for 20 times and 25 times for FS and LS motor ( MUHAIMIN & DADANG )
|
|
2025-11-03
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L93-3S1
|
Issue Temp Bottom Bin increase- Check Solenoid Purging
|
Check at location bag filter result there is solenoid valve normal, replace 1 solenoid. Test function solenoid valve result ok normal. Check value temperature bin of coal result normal indication ( RIZAL & ANDRI )
|
|
2025-10-31
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1
|
363 MD1 check - clean up - replace carbon brush
|
Clean up filter 363 FA2 for filter main drive, area motor and room carbon brush. Measure long all carbon brush found no 1-2-5-11-12 bad condition. Replace carbon with spare units for no 1-2-5-11-12 ( ADI & MUHAIMIN )
|
|
2025-10-31
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
Y43-1G1
|
Service / replace pump antscalant
|
Replace pump antscalant test run function result ok ( RIZAL & EDI & DADANG )
|
|
2025-10-31
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
IKGA probe Support
|
Do continue welding probe support and repainting area 463 2K1 ( RIZAL & EDI & DADANG & ANDRI & WIKAN & AIMAN )
|
|
2025-10-31
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER6
|
Labelling cable ER6 - Tripper (L1C-TR1) + scun cable
|
Continue do labelling cable at ER6 and observation area tripper ( AGUS & ADI & MUHAIMIN )
|
|
2025-10-30
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TR1
|
Observation add 3 Modul DO PLC
|
Prepare Modul additional ( RIZAL & JAJAT )
|
|
2025-10-29
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR service analyzer
|
Clean up flange probe, probe, filter sample line, sample line, diaphragm pump, filter balston from dirty of dust. Check function humidity sensor and filter humidity, result function humidity sensor good and filter humidity ok ( RIZAL & ANDRI )
|
|
2025-10-29
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-BF1
|
Install lighting lamp
|
Do installation lighting lamp at 423 BF1, test on lighting lamp result normal on ( EDI & DADANG )
|
|
2025-10-29
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing data PMR and WBI month october 2025
|
Do complete data check sheet PMR and WBI month of october 2025 ( JAJAT & ADI )
|
|
2025-10-29
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-EL1
|
lighting lamp inside elevator room off
|
Replace lighting lamp area inside elevator 2 each, test on result lamp normal on ( MUHAIMIN & AIMAN )
|
|
2025-10-29
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER5
|
Lighting lamp issue off at ER5 outside
|
Replace lighting lamp with spare, test on result lighting lamp normal ( ADI & MUHAIMIN )
|
|
2025-10-28
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
KILN-SCANNER
|
Kiln Scanner (View Abnormal)
|
Replace limit switch of t scanner, test function result view good at CCR ( RIZAL & ANDRI )
|
|
2025-10-28
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-L63-RM1
|
PMR Service Critical Motor & LSR RM & CM1
|
Clean up area motor and filter motor. Measure vibration - noise - temperature FS and LS motor. Add grease motor 25 times - 30 times - 35 times for FS and LS motor ( MUHAIMIN & DADANG )
|
|
2025-10-28
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
BURNER-FLOOR
|
Connect Motor Hoist Area Burner
|
Do connecting motor hoist area burner ( MUHAIMIN & DADANG )
|
|
2025-10-28
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-SR1
|
Cleaning Finishing room trafo 363-SR1
|
Continue finishing room trafo 363 SR1 from dirty of dust use equipment cleaning tools and instrument air supply ( JAJAT & DEVI )
|
|
2025-10-28
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-BF1
|
Solenoid compartement 8 issue purging but no air supply
|
Check at location found 1 solenoid valve bag filter is not function normal, replace 1 solenoid valve test function result normal ( RIZAL & ANDRI )
|
|
2025-10-28
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Complete check sheet PMR or WBI month of october 2025
|
Completing data check sheet PMR analyser L63 2K1-L63 2K2-L63 2K3-483 2K1-463 2K1-443 2K1-423 2K1; PMR IR TAD-T scanner-CCTV-Camera Burner; PMR Hoist and Crane; WBI Bottom Blending-KILN-Cooler-Clinker Silo; WBI Top Blending-CT-PH-KILN; WBI CM-Truck Lift-BC Transport Tripper-Reclaimer Coal; WBI Feed Bin-Raw Mill-CT-Dust Transport-BF month of october 2025 ( JAJAT & ADI )
|
|
2025-10-27
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
fabrication and installation rel also rooler
|
Fabrication for installation rel rooler 463 2K1Installation at local, test run insert probe and retract probe flange result normall ( JAJAT, AGUS, RIZAL, ANDRI, DADANG, MUHAIMIN )
|
|
2025-10-27
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-SR1
|
Cleaning trafo room 363-SR 1
|
Do clean up trafo room from dirty of dust use equipment cleaning tools and instrument air ( JAJAT & ADI & AIMAN )
|
|
2025-10-24
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Wiring panel welding of burner floor
|
Do wiring of panel welding for burner floor. Panel welding ready to install ( AGUS & MUHAIMIN )
|
|
2025-10-24
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-BF1
|
Pulling cable power solenoid valve and install solenoid valve 2 groups
|
Do pulling cable 2 line for power solenoid valve 2 groups and installation 2 groups solenoid valve ( JAJAT, AGUS, RIZAL, ADI, MUHAIMIN, ANDRI, DADANG )
|
|
2025-10-24
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1-GEMBA-TPM-
|
Clean up area outside CEMS shelter
|
Do GEMBA TPM clean area CEMS gas room, wall, roof from dirty of dust use equipment cleaning tools and instrument air supply ( JAJAT, ADI, AIMAN )
|
|
2025-10-23
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-MD1
|
Pulling cable power at L63-MD1
|
Pulling cable for power L63 MD1 ( AGUS & MUAHIMIN & ANDRI )
|
|
2025-10-23
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR service analyzer
|
Clean up flange probe-sample line-filter sample line-diaphragm pump-filter balston from dirty of coal. Check function humidity sensor and filter humidity result function humidity normal and filter good condition ( RIZAL & AIMAN )
|
|
2025-10-23
5 months ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
ER6-&-ER5
|
PMR Clean Up MCC ER All Area Kiln Nar1
|
Do clean up MCC area ER 6 and ER5 from dust use broom and vacuum filter also filter cabinet from dirty of dust ( AIMAN )
|
|
2025-10-23
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1-&-473-FA3
|
Install lighting lamp 4th floor 443 PH1 and fix also dismantling stop contact area cooler ex 473 FA3
|
Do install lighting lamp at 4th floor test on lamp result ok, fix and dismantling stop contact area ex cable 473 FA3 ( JAJAT & EDI & DADANG )
|
|
2025-10-22
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Sort it out and 5R part work shop
|
Do sort it out part and 5R part area workshop of electric ( JAJAT & AIMAN )
|
|
2025-10-22
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR service analyzer
|
Clean up flange probe-probe-filter sample line-sample line-dryer gas pump-filter balston from dirty of dust. Check humidity sensor function and filter sensor result function sensor normal and filter good condition ( EDI & ADI )
|
|
2025-10-22
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
Support Yearly Maintenance CEMS
|
Do support yearly maintenance CEMS with KISS INDUSTRIAL employee hannes and adrianus ( RIZAL & ANDRI & DADANG & KISS INDUSTRIAL )
|
|
2025-10-21
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
Lamp of HRG blinking
|
Replace lamp test lamp result lamp on ( ANDRI )
|
|
2025-10-21
5 months ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
443-PH1
|
IR TAD issue indication temperature low
|
Cross check by portable tools result normal compare between local and CCR are same ( RIZAL & MUHAIMIN )
|
|
2025-10-21
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-AC1
|
Prepare and connection welding point burner
|
Do connection welding panel near 493 AC1 result finnish note wait input power welding at buttom cooler ( EDI & ADI & DADANG )
|
|
2025-10-21
5 months ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
423-2K1
|
YM CEMS
|
Yearly maintenance CEMS and do support KISS Industrial work YM CEMS ( RIZAL & MUHAIMIN & ANDRI & KISS INDUSTRIAL EMPLOYEE MR. HANNES - MR. ADRIANUS )
|
|
2025-10-21
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
Failure start
|
Reset Alarm , Start step-by-step , monitor di 60% ( AGUS & RIZAL )
|
|
2025-10-20
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
Observation instalation blower sheel kiln
|
Do observation for instalation motor sheel kiln ( RIZAL & MUHAIMIN & ANDRI )
|
|
2025-10-20
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-&--L63-RM1
|
PMR Service Critical Motor area Kiln & CM1
|
Clean up area motor and filter motor. Measure vibration-noise-temperature FS (NDE) and LS (DE) motor. Add grease motor for 25 times and 30 times for FS (NDE) and LS (DE) motor ( AGUS & DADANG )
|
|
2025-10-20
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-443-PH1
|
PMR Service Critical Motor area RM
|
Clean up area motor and filter motor. Measure vibration-noise-temperature FS (NDE) and LS (DE) motor. Add grease motor for 10 times and 15 times for FS (NDE) and LS (DE) motor ( EDI & ADI )
|
|
2025-10-18
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1-;-473-CC1;-L63-RM1;-FEED-BIN
|
Clean panel I/O
|
Do clean up panel I/O area preheater-cooler-coal mill hs-feed bin from dirty of dust use hand blower ( ADI & AMIT & SAIPUL )
|
|
2025-10-18
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA3
|
Pulling cable motor from local to ER5
|
Do pulling cable motor from local to ER5, test meger cable result ok. Do test run motor with different speed result ok ( JAJAT, AGUS, RIZAL, ADI, ANDRI, AIMAN, MIHAIMIN, DADANG )
|
|
2025-10-17
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-AC2
|
Prepare & Pulling Cable welding point Cooler
|
Pulling cable and cleaning material cable rel ( JAJAT & AGUS & RIZAL & ADI & MUHAIMIN & ANDRI & DADANG & AIMAN )
|
|
2025-10-17
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SC3
|
Installation and wiring 393-SC3 ( MCC part + LCS+ Motion )
|
Prepare part needed ready to install ( MUHAIMIN & ANDRI & DADANG )
|
|
2025-10-17
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
TPM Area CEMS
|
Do TPM area 423 2K1. Clean air tank, wall outside. Repainting blue color for air tank, green color for wall outside shelter 423 2K1, yellow color for roof outside ( JAJAT, AGUS, RIZAL, ADI, ANDRI, AIMAN, MUHAIMIN, DADANG )
|
|
2025-10-16
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-AC2
|
Relocation welding point
|
Relocation welding point close to main distribution welding point ( AGUS & ANDRI & DADANG )
|
|
2025-10-16
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-3B1
|
Check Greasing and Cleaning Area Clinker Silo
|
Clean up ALL LCS , Motor, Greasing Motor 493-AC2/AC3 ( JAJAT & MUHAIMIN )
|
|
2025-10-16
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR service analyzer
|
Clean up flange probe-sample line-filter sample-diaphragm pump-filter balston-dryer gas pump from dirty of coal. Check humidity sensor function and filter humidity result function sensor normal and filter good condition ( RIZAL )
|
|
2025-10-16
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CIVIL-BUILDING-WORKSHOP
|
Inspection electrical and welding tools of Civil Building
|
Inspection electrical tools of civil building tagging with yellow color. ( ADI & EVE AKPAN )
|
|
2025-10-15
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-AC2
|
Observation cable welding point area 493 AC2 and planning tap power
|
Do observation cable welding point for 493 AC2 and planning power tap ( MUHAIMIN & AIMAN )
|
|
2025-10-15
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SC3-&-3-SG
|
Prepare part needed for new installation 393-SC3 + 3 Slide Gate (MCC part + LCS+ Motion)
|
Do prepare part needed new installation 393 SC3 and 3 SG like MCC & motion & LCS ( RIZAL & MUHAIMIN )
|
|
2025-10-15
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TR1
|
Cleaning Area L1C-TR1 (MCC + Radio Link)
|
Do clean up area L1C TR1 for MCC and radio link ( AIMAN )
|
|
2025-10-15
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Finishing Fabrication I/O additional 2nd floor
|
Do finishing fabrication I/O panel 2nd floor ( ANDRI & DADANG )
|
|
2025-10-15
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CIVIL-BUILDING-WORKSHOP
|
Inspection electrical and welding tools
|
Inspection electrical and welding tools of Civil building work shop. Tagging equipment with yellow color. Note 2 extention cable unsafe to use, 1 circle machine because cable power failure and connector male and female failure ( ADI )
|
|
2025-10-14
5 months ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
393-SC3-&-3-SG
|
Observation part needed new installation 393 SC3 and 3 slide gate
|
Observation part needed new installation 393 SC3 and 3 slide gate ( JAJAT & RIZAL & MUHAIMIN )
|
|
2025-10-14
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
Fabrication I/O additional 2nd floor
|
Fabrication I/O additional at 2nd floor ( MUHAIMIN & ANDRI & DADANG )
|
|
2025-10-14
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
PT-TRUBA-JAGA-CITA
|
Inspection electrical and welding tools
|
Do inspection electrical and welding tools of PT Truba Jaga Cita. Equipment tagging with yellow color ( Total electrical tools: 28 units, welding tools: 6 units ) ( ADI & EVE AKPAN )
|
|
2025-10-13
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-CC1
|
473 FA Cooler refill easylube + greasing
|
Add greaseing motor for FS and LS. Also refill easylube fan motor ( MUHAIMIN )
|
|
2025-10-13
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR service analyzer
|
Clean up flange probe-probe-sample line-filter sample line-diaphragm pump-filter balston-dryer gas pump from dirty of dust. Check humidity sensor function and filter humidity result function humidity sensor normal and filter humidity good condition ( RIZAL & ANDRI )
|
|
2025-10-13
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-BF3
|
Replace & Service PLC
|
Service PLC 393 BF3, test function result PLC normal ( AGUS & DADANG )
|
|
2025-10-13
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-L63-RM1
|
PMR Service Critical Motor & LSR RM & CM1
|
Clean area motor and filter motor. Measure vibration-noise-temperature FS and LS. Add grease 10 times-15 times-25 times and 30 times for FS and LS motor.( ADI & EVE AKPAN )
|
|
2025-10-10
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
Measure mV OZD
|
Measure mV OZD for area RM ( RIZAL & EVE TEGAR )
|
|
2025-10-10
5 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1-&-363-FN1
|
Check and cleaning carbon brush
|
Cleaning carbon brush room and area motor. Measure long all carbon brush, replace carbon brush 1 because sort 3100 mm. Cleaning carbon brush room and area motor. Measure long all carbon brush for 363 FN1 M1 result ok ( AGUS & MUHAIIMIN & EVE AKPAN )
|
|
2025-10-09
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR service analyzer
|
Clean up flange probe-sample line-filter sample line-diaphragm pump-filter balston-dryer gas pump from dirty of coal. Check humidity sensor function and filter humidity result function humidity normal and filter humidity good condition ( RIZAL & EVE TEGAR & ANDRI )
|
|
2025-10-09
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
Observation power pump fire protection 5th floor
|
Connection cable power pump fire at 5th floor ( EDI & MUHAIMIN )
|
|
2025-10-09
6 months ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
WORK-SHOP
|
Continue fabrication Welding Point
|
Fabrication welding point at workshop ( AGUS & EVE AKPAN & DADANG )
|
|
2025-10-09
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-FA3
|
Observation cable signal S-G Observation cable signal S-G
|
Replace signal cable S-G test signal result ok ( RIZAL & EVE TEGAR & ANDRI )
|
|
2025-10-08
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-BL1
|
Replace Handle LCS failure
|
Replace LCS handle and test signal result ok ( MUHAIMIN & EVE AKPAN )
|
|
2025-10-08
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
PT-PINCURAN-MAS
|
Check Tool Pincuran Work Shop
|
Inspection electrical and welding tools of PT Pincuran Mas. Tagging equipment with blue color ( MUHAIMIN & EVE TEGAR & EVE AKPAN )
|
|
2025-10-07
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
Repare Welding Point 6th floor and dismantling Box ( ex-cable sensor 7th floor)
|
Do repare welding at 6th floor and dismantling box or ex cable sensor at 7th floor ( MUHAIMIN & DADANG )
|
|
2025-10-07
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER4
|
Istall platform bottom ER4
|
Install platform bottom ER4 ( MUHAIMIN & ANDRI & AIMAN )
|
|
2025-10-07
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RF1
|
Reposition speed sensor
|
Adjusting probe, monitor oke ( RIZAL & ANDRI )
|
|
2025-10-07
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
Repare Emergency Door HRG-WTP
|
Do repare welding evacute door + storage chemical room ( JAJAT & DADANG )
|
|
2025-10-07
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-EL1
|
PMR Serv. Elevator PH NAR1 & WBI Sump El
|
Do clean up room of elevator, door elevator from 1st to 8th floor from dirty of dust, cage of elevator from dirty of dust, drive of elevator also from dirty of dust use hand blower. Test function elevator from 8th to 1st floor result normal function. WBI sump pump of elevator ( AGUS & EVE AKPAN )
|
|
2025-10-07
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1;-L63-RM1;-463-KL1
|
PMR CCTV, IR TAD & Kiln Scanner
|
Clean lens IR TAD, camera burner & T scanner-flange probe-camera CCTV from dirty of dust use cleaning tools ( ADI & EVE TEGAR )
|
|
2025-10-06
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-MD-&-453-BL1-&-483-BL5-&-483-BL9
|
Add greasing motor for FS and LS
|
Add greasing motor for FS and LS. Measure vibration-noise for FS and LS until vibration below 4 mm/s and noise below 2 gE ( MUHAIMIN & EVE AKPAN & ANDRI )
|
|
2025-10-06
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Fabrication plat form at bottom ER4
|
Fabrication platform for ER4 at workshop ( ANDRI & MUHAIMIN & DADANG & EDI )
|
|
2025-10-06
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-BF1
|
Compartement 1 south side leakage
|
Check at location found solenoid valve normal function ( MUHAIMIN & ANDRI & EVE AKPAN )
|
|
2025-10-06
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
PMR Critical motor Area Kiln
|
Clean up area motor and filter motor. Measure vibration-noise-temperature for FS and LS motor. Add grease motor for FS and LS around 25 times and 30 times ( AGUS & DADANG & EVE RIZALDI )
|
|
2025-10-06
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
PMR Critical motor Area RM
|
Clean up area motor and filter motor. Measure vibration-noise-temperature for FS and LS motor. Add grease motor for FS and LS around 10 times and 15 times ( EDI & ADI & EVE TEGAR )
|
|
2025-10-03
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-FN1-&-CEMS-ROOM-&-ER3
|
TPM Area 423 FN1 & CEMS Room & ER3
|
Take picture before TPM and make report TPM for dash board and save at computer ( RIZAL & AGUS )
|
|
2025-10-03
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Fabrication plat form at bottom ER4
|
Do fabrication plat form bottom ER4 at workshop ( ANDRI & DADANG )
|
|
2025-10-03
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-RF6
|
Install Motor
|
Install motor at 393 RF6, check ampere motor result ampere motor 2.7 A and 2.9 A from normal 0.9 A. Install original motor and install VSD in order reduce speed motor also pulling cable at ER4 test run motor base on production request for speed motor also measure ampere motor result ampere motor normal ( JAJAT & AGUS & RIZAL & ADI & ANDRI & MUHAIMIN & DADANG & EVE TEGAR )
|
|
2025-10-03
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SC1
|
Issue motor oil gear leakage
|
Check at location found there is leakage oil from motor, also found nut at motor is not tight. Do tighten every nut motor and add silicone at part of leakage oil ( EDI & ADI & EVE TEGAR )
|
|
2025-10-02
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SC1
|
Check motor oil gear leakage
|
Check at location, tighten nut of motor and do clean up area motor. Result not found leakage oil at motor ( EDI )
|
|
2025-10-02
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
BURNER-FLOOR
|
Lighting burner check and install new lighting
|
Check lighting at burner floor and install new lighting lamp ( AGUS & MUHAIMIN & DADANG )
|
|
2025-10-02
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Continue fabrication plat form at bottom ER4
|
Do fabrication plat form for bottom ER4 at workshop ( ANDRI & DADANG )
|
|
2025-10-02
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-BF1
|
Check purging not function
|
Replace 1 membran for purging because bad condition also service coil of solenoid valve and solenoid valve because function bad. Do replace nut for solenoid valve. Test function purging result normal ( RIZAL & EVE TEGAR & ANDRI )
|
|
2025-10-02
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1;-L63-RM1;-463-KL1
|
PMR IR TAD- T Scanner- CCTV - Camera Burner
|
Clean lens IR TAD, camera burner & Tscanner-flange probe-camera CCTV from dirty of dust use cleaning tools ( EDI & ADI )
|
|
2025-10-01
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Fabrication plat form at bottom ER4
|
Fabrication plat form at bottom ER4 ( ANDRI & DADANG )
|
|
2025-10-01
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Continue TPM report FI
|
Print out report FI last report and time line dash board with new form of TPM and install at dash board TPM at workshop ( ADI & EVE TEGAR )
|
|
2025-10-01
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ANALYZER-ROOM
|
Clean up area analyzer room
|
Do clean up area analyzer room from dirty dust and coal use broom and dustpan ( AIMAN )
|
|
2025-10-01
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
BURNER-FLOOR-AND-CLINKER-SILO
|
WBI hoist and crane
|
Do WBI hoist and crane area burner floor and clinker silo. Clean up area motor and test function move east-west south-north and up-down result function normal ( EDI & EVE RIZALDI )
|
|
2025-10-01
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-CC1
|
Observation area cooler ( issue Ground F ) from M33-WP4 with measurement result normal related other suspected
|
Do observation area cooler regarding issue ground F of M33 WP4 result normal function ( AGUS & MUHAIMIN )
|
|
2025-09-30
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-FN3
|
Signal cable S I/O is failure
|
Connected signal S of I/O for 393 FN3 test function signal result normal ( RIZAL & EVE TEGAR & CIVACON )
|
|
2025-09-30
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR service analyzer
|
Clean up flange probe-sample line-filter sample inlet-diaphragm pump-dryer gas pump-filter balston from dirty of coal. Check humidity sensor function and filter humidity result function sensor normal and filter humidity good condition ( EDI & ADI )
|
|
2025-09-30
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-AND-BURNER-FLOOR
|
Continue relocation welding point and prepare cable connection burner point + Kiln
|
Do relocation welding point for kiln and burner floor and connection cable of welding point ( MUHAIMIN & DADANG )
|
|
2025-09-30
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-FN1
|
Replace sensor vibration with IFM
|
Do replace sensor vibration of N1 with IFM test function sensor result normal ( RIZAL & EVE TEGAR & CIVACON )
|
|
2025-09-29
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-AND-BURNER-FLOOR
|
Continue relocation welding point and prepare cable connection burner point and Kiln
|
Pulling cable and make connection at end side point ( MUHAIMIN & ANDRI & DADANG )
|
|
2025-09-29
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-463-KL1
|
PMR Service Critical Motor & LSR RM & CM1
|
Clean up area motor and filter motor. Measure vibration-noise-temperature for FS and LS motor. Add grease motor from 25 times-30 times and 35 times for FS and LS motor ( EDI & EVE RIZALDI )
|
|
2025-09-29
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR service analyzer
|
Clean up flange probe-probe-filter sample line-sample line-diaphragm pump-dryer gas pump-filter balston from dirty of dust. Check function humidity sensor and filter humidity, result function humidity good and filter humidity good condition ( RIZAL & EVE TEGAR )
|
|
2025-09-29
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Report also complete PMR and WBI September 2025
|
Re write PMR critical motor KILN and RM for 1st and 2nd weeks of september 2025 ( JAJAT & ADI )
|
|
2025-09-29
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER4
|
TPM ER4 repainting green color for floor
|
Repainting green color for floor at ER4 ( JAJAT & ADI )
|
|
2025-09-26
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Complete data check sheet PMR and WBI month of september 2025
|
Do complete data check sheet for PMR and WBI month of september 2025 ( ADI )
|
|
2025-09-26
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER4
|
Gemba TPM ER4
|
Clean area ER4 for south west from dirty of dust, install cover for panel trafo and tightening cover cable tray. Repainting door with red color, and floor of ER4 with yellow and red color. Move unsafe good inside ER4 to garbage tank, put support for cable to warehouse behind ER5 ( JAJAT & AGUS & RIZAL & EDI & ADI & ANDRI & AIMAN & MUHAIMIN & DADANG )
|
|
2025-09-26
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ELGA-2
|
Observation leaked ELGA 2
|
Service leaked at ELGA 2 result test function normal ( RIZAL & ANDRI )
|
|
2025-09-26
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Continue observation and wiring project L1C-TR1
|
Do wiring for project L1C TR1 ( JAJAT & AGUS )
|
|
2025-09-26
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
BURNER-FLOOR
|
Continue relocation welding point and prepare cable connection burner point
|
Do relocation welding point at burner floor and connect cable of welding point ( EDI & MUHAIMIN & DADANG )
|
|
2025-09-26
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER4
|
Gemba TPM ER4
|
Clean area ER4 for south west from dirty of dust, install cover for panel trafo and tightening cover cable tray. Repainting door with red color, and floor of ER4 with yellow and red color. Move unsafe good inside ER4 to garbage tank, put support for cable to warehouse behind ER5 ( JAJAT & AGUS & RIZAL & ADI & ANDRI & MUHAIMIN & AIMAN & DADANG )
|
|
2025-09-25
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
Continue Welding Point + put panel welding near 463 MD1 + Prepare Cable connection
|
Install cable for panel welding at 463 KL1, put cable power at top side near panel welding note wait scafolding to pulling cable power ( MUHAIMIN & DADANG )
|
|
2025-09-25
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TR1
|
Continue observation and wiring project L1C-TR1
|
Do observation L1C-TR1 and wiring project tripper ( AGUS & EDI )
|
|
2025-09-25
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Complete data check sheet PMR and WBI month of september 2025
|
Do complete data check sheet PMR analyzer L63 2K1-L63 2K2-L63 2K3-483 2K1-463 2K1-443 2K1-423 2K1, PMR IR TAD-CCTV-Tscanner-Pyoremeter, PMR hoist & crane, WBI top blending-CT-PH-kiln, WBI bottom blending-kiln-cooler-clinker silo, WBI CM-Truck lift-BC transport-Tripper-Reclaimer coal, WBI feed bin-RM-CT-dust transport-BF month of september 2025 ( JAJAT & ADI )
|
|
2025-09-25
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Upload description L1C-TR1
|
Do upload description for L1C-TR1 and do laminating for file tripper at workshop ( RIZAL & EVE RIZALDI )
|
|
2025-09-24
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CLINKER-SILO
|
Check + Add greasing + Clean up Motor Area Clinker
|
Check and clean up motor area clinker and add grease motor for FS and LS ( MUHAIMIN & DADANG )
|
|
2025-09-24
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR service analyser
|
Clean up flange probe-sample line-filter sample line-diaphragm pump-filter balston-dryer gas pump from dirty of coal. Check function humidity sensor and filter humidity result function sensor ok and filter humidity good condition ( ADI & MUHAIMIN & EVE RIZALDI )
|
|
2025-09-24
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FN7
|
Support take motor 473-FN7 from vendor
|
Do support motor from vendor of 473-FN7 ( EDI & DADANG )
|
|
2025-09-24
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR analyzer CEMS
|
Clean up purge air unit motor and filter purge air unit for Dust Hunter and Flowsic 100-swivel window dust hunter for T/R and R unit and transducer A & transducer B for Flowsic from dirty of dust. Do alignment dust hunter T/R and R dust hunter. Clean up CEMS room, CEMS gas room and filter cabinet MCS 100 E from dirty of dust ( RIZAL & ANDRI )
|
|
2025-09-24
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TR1
|
Continue observation and wiring project L1C-TR1
|
Do observation and wiring project for L1C-TR1 ( AGUS & EDI )
|
|
2025-09-23
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TR1
|
Continue Observation Project L1C-TR1
|
Do observation project for L1C TR1 ( JAJAT & AGUS )
|
|
2025-09-23
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-&-463-KL1
|
Fabrication support lamp + Welding panel and install lighting lamp area kiln
|
Install lighting lamp at area kiln test on result lighting lamp normal on and make fabrication support lamp and welding panel at workshop ( MUHAIMIN & ANDRI & DADANG )
|
|
2025-09-23
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR service analyzer
|
Clean up flange probe-probe-filter sample line-sample line-diaphragm pump-dryer gas pump-filter balston from dirty of dust use instrument air supply. Check humidity sensor function and filter humidity result function humidity normal and filter humidity good condition. For 463 2K1 clean up motor and filter heat exchanger from dirtyof dust use instrument air supply ( EDI & ADI )
|
|
2025-09-22
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Continue wiring control Radio Link
|
Wiring control radio link. Ready to Install ( RIZAL )
|
|
2025-09-22
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1
|
Observation replacement lamp without cover area kiln
|
Do observation instalation lighting lamp without cover area kiln. Fabrication support for lighting lamp ( MUHAIMIN )
|
|
2025-09-22
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-&-473-CC1
|
PMR Critical motor Kiln and Cooler
|
Cleaning area motor and filter motor. Measure vibration-noise-temperature for FS and LS. Add grease motor for 35 times-30 times for FS and LS ( AGUS )
|
|
2025-09-22
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-L63-RM1
|
PMR Critical motor Raw Mill and Coal Mill
|
Cleaning area motor and filter motor. Measure vibration-noise-temperature for FS and LS. Add grease motor for 25 times-30 times for FS and LS ( RIZAL )
|
|
2025-09-22
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L3A-BC1
|
Lighting lamp off 2 each
|
Replace lighting lamp 2 unit with spare test on result lighting lamp ok ( ANDRI & DADANG )
|
|
2025-09-20
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TR1
|
Pulling cable 6P x 1.5 mm 3 line from tripper to I/O ER6
|
Pulling cable 6P x 1.5 mm 3 line around 250 m from tripper to I/O panel ER6 ( JAJAT & AGUS & RIZAL & ADI & MUHAIMIN & ANDRI & DADANG & AIMAN )
|
|
2025-09-19
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
IDO-TANK
|
Instalation pump
|
Check at location can not found motor at IDO tank base information from Mr.Jajat motor still at Mr.Nopayadi CBM ( ADI & MUHAIMIN )
|
|
2025-09-19
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Prepare + Wiring RD for L1C-TR1
|
Do prepare wiring radio link for L1C TR1 test function result ok
|
|
2025-09-19
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Install Support Welding point
|
Make support for welding panel at workshop ( ANDRI & DADANG )
|
|
2025-09-19
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TR1
|
Obsevation / prepare for pulling cable
|
Observation for job pulling cable at L1C TR1 ( AGUS & EDI & MUHAIMIN )
|
|
2025-09-18
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1-CYCLONE-4
|
Add tubing cone C4A
|
Add tubing of cone C4A ( ANDRI & DADANG )
|
|
2025-09-18
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3-&-ER4-
|
PMR Clean Up MCC ER
|
Clean up electric room 3 & electric 4 top and bottom side, MCC from dirty of dust use brush and mop electric room ( AIMAN )
|
|
2025-09-18
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-FV9
|
Check / install double tipping valve new control
|
Install double tipping valve for new control test function result normal ( EDI & MUHAIMIN )
|
|
2025-09-17
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-HC1
|
Service pipe lighting back of HC
|
Test on lighting lamp result normal lighting lamp area 473 HC1 all on ( AGUS & ADI & MUHAIMIN & DADANG )
|
|
2025-09-17
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-GQ1
|
Install lighting lamp north side
|
Make support lighting lamp at workshop. Install lighting lamp test on result lighting lamp normal ( AGUS & ADI & MUHAIMIN & DADANG )
|
|
2025-09-17
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Prepare box and PS 12 VDC 20A
|
Prepare box for power supply 12 VDC 20A, install power supply and cable power input bring panel to CCR server room give to Mr.Muklas ES ( MUHAIMIN & ADI )
|
|
2025-09-17
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR Service Analyser
|
Clean up flange probe-probe-sample line-filter sample line-diaphragm pump-fiter balston-dryer gas pump from dirty of dust. Check function humidity sensor and filter humidity result function sensor normal and filter humidity good condition ( RIZAL & ANDRI & EVE HADIF & EVE RIZALDI )
|
|
2025-09-16
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-MD1
|
Clean up and check carbon brush
|
Clean up carbon brush room, measure long all carbon brush, replace 8 carbon brush with spare carbon brush ( AGUS )
|
|
2025-09-16
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-SR1
|
Observation cracked at base plate motor
|
Check at location found cracked at support 363 SR1 ( MUHAIMIN & DADANG )
|
|
2025-09-16
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Closing WO Electric 1
|
Do closing WO for date 8-9-25 to 12-9-25 ( ADI )
|
|
2025-09-16
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-&-L1C-TR1-&-L1C-TL1
|
WBI Elect & Ins & Check I/O CM, Sump T&T
|
Do WBI electrical and instrumentation and check I/O coal mill, sump T&T. Measure vibration-noise motor FS and LS ( EDI )
|
|
2025-09-16
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-BL7-AND-473-FA2
|
Install lighting lamp
|
Install lighting lamp area blower and motor. Test on result ok lighting lamp on ( MUHAIMIN & DADANG )
|
|
2025-09-16
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR Service CEMS
|
Clean up purge air unit motor and filter purge air unit, swivel window R unit & T/R unit of dust hunter also flange with tube and alignment dust hunter, transducer A & transducer B of flowsic, CEMS room, filter cabinet MCS 100 E and gas bottle room from dirty of dust ( RIZAL & ANDRI )
|
|
2025-09-15
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-BL5
|
Replace Motor & Cek Structure P
|
Check motor spare and replace motor ( AGUS & ADI & MUHAIMIN )
|
|
2025-09-15
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TR1
|
Re-check cycle mode and survey way pulling cable
|
Re check cycle mode result function ok. Do survey way of pulling cable ( RIZAL & EVE RIZALDI & ANDRI )
|
|
2025-09-15
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-MD1
|
Greasing bearing motor LS
|
Add grease at LS motor 25 times ( EDI & EVE HADIF & DADANG )
|
|
2025-09-15
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-FN1
|
Check recondition motor
|
Check recondition motor ( AGUS & ADI & MUHAIMIN )
|
|
2025-09-15
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-RF6
|
Service speed motor
|
Service speed motor result ok ( AGUS & ADI & MUHAIMIN )
|
|
2025-09-15
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-L63-CM1-463-KL1-473-CC1
|
PMR Service Critical Motor & LSR
|
Clean up area motor and filter motor. Measure vibration-noise-temperature for FS and LS. Add grease 20 times-25 times and 30 times for FS and LS ( EDI & EVE HADIF & DADANG )
|
|
2025-09-12
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Install motor CKD test run motor
|
Install motor at CKD do test run motor result found there is friction at motor when installing ( AGUS & MUHAIMIN & ANDRI & DADANG )
|
|
2025-09-12
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-MD1
|
Observation heat at winding
|
Measure heat at winding L63 MD1, result around 70 degree celcius and body around 58.5 to 64.2 degree celcius. Advise install exhause fan to take out heat at terminal cable to prevent motor function well ( AGUS & ADI & MUHAIMIN & DADANG & JAJAT )
|
|
2025-09-12
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L3C-TR1
|
Prepare Cable (6P x 1,5 mm) for project tripper
|
Check cable sensor at ware house, result found cable 6P x 1.5 mm. Take cable from ware house bring to ER6 ( ADI & MUHAIMIN & DADANG )
|
|
2025-09-12
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR Analizer IKGA & Pre heater
|
Clean up probe-sample line-filter sample line-diaphragm pump-fiter balston-dryer gas pump from dirty of dust. Check function humidity sensor and filter humidity result function humidity normal and filter humidity normal ( RIZAL & EVE AKPAN & ANDRI )
|
|
2025-09-12
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Update wiring L1C-TR1
|
Do update wiring for L1C TR1 ( AGUS )
|
|
2025-09-11
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Replace bearing motor CKD
|
Replace bearing motor of CKD at workshop ( MUHAIMIN & EDI )
|
|
2025-09-11
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Prepare Audit Safety (SWP-HIRAC)
|
Do prepare for Audit Safety like SWP and HIRAC ( JAJAT & ADI )
|
|
2025-09-11
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
PANEL-INPUT-OUTPUT
|
Repare handle I/O fail
|
Repare handle panel I/O fail result function handle ok ( ANDRI & DADANG )
|
|
2025-09-11
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
PANEL-INPUT-OUTPUT
|
Replace CI830 to CI801
|
Do replace CI830 to CI801 test ON LINE ok ( AGUS & EVE AKPAN )
|
|
2025-09-11
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FN4
|
Test run after re-position blade
|
Do test run after reposition blade motor. Measure ampere for R-S-T result 58.4 ampere to 60.4 ampere also measure vibration result 3.4 mm/s and 2.6 mm/s ( EDI & MUHAIMIN )
|
|
2025-09-11
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
Replace pump of HRG
|
Replace pump at HRG. Test function ok ( RIZAL & ANDRI )
|
|
2025-09-11
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
PLANT-NR1
|
Support area NAR1 and concern feeding
|
Do Support area NR1 for concern feeding ( JAJAT & AGUS & RIZAL & ADI & MUHAIMIN & ANDRI & DADANG & AIMAN & EVE AKPAN )
|
|
2025-09-10
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-BE1
|
Replace limit switch of bottom side for L2 and issue speed failure
|
Replace limit switch for bucket elevator test function result ok. Adjust position of sensor more deep that before, test run bucket elevator result ok normal ( ADI & MUHAIMIN & EVE AKPAN & AGUS & EDI & RIZAL )
|
|
2025-09-10
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1-WINCI-8THFLOOR
|
Decrease break
|
Decreasing break. test function winci result ok ( EDI & MUHAIMIN & DADANG )
|
|
2025-09-10
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-Z2B-P1-&-443-Z4A-&-443-Z4B-
|
Repare tubing and extend pipe draft
|
Repare tubing for sample pressure at cyclone 2. Do extend pipe draft of sample line pressure at cyclone 4 result ok ( RIZAL & ANDRI )
|
|
2025-09-10
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-BF1
|
Replace membran 6 each
|
Replace membran bag filter 6 units test function bag filter result normal ( EDI & DADANG )
|
|
2025-09-10
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FN4
|
Test Run
|
Test run motor result function normal. AGUS & MUHAIMIN ) Because size of blade different
|
|
2025-09-10
6 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
PINCURAN-MAS-WORK-SHOP
|
Inspection electrical and welding
|
Do inspection electrical tools of PT Pincuran Mas, total 38 units tagging with blue color ( ADI & EVE AKPAN )
|
|
2025-09-09
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Inspection electrical tools of PT Pincuran Mas
|
Inspection electrical tools of PT Pincuran Mas, 1 portable lamp. Tagging with blue color ( ADI & EVE AKPAN )
|
|
2025-09-09
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Complete check sheet PMR & WBI for 1st week of september 2025
|
Do completing data check sheet for PMR service analyzer L63 2K1 - L63 2K2 - L63 2K3 - 483 2K1 - 463 2K1 - 443 2K1 - 423 2K1 for 1st weeks of september 2025 ( ADI & EVE AKPAN )
|
|
2025-09-09
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CKD
|
Check and service motor CKD
|
Dismantle motor CKD. Bring to workshop inspection motor result good condition. Install back motor at workshop continue connected at local ( AGUS )
|
|
2025-09-09
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-FN1
|
Install motor, check function motor and bag filter
|
Install motor at location. Test run motor, measure ampere result: 6.04 A - 5.77 A - 5.73 A, vibartion and noise for FS and LS result: 3.04 mm/s 0.92 gE; 2.7 mm/s 1.67 gE. Test function of bag filter result normal ( MUHAIMIN & EVE AKPAN & DADANG )
|
|
2025-09-08
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TR1
|
issue can not AUTO
|
Restart computer, check program. Tripper still can not AUTO ( RIZAL & AGUS & ANDRI )
|
|
2025-09-08
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-FN1
|
Issue motor noise
|
Dismantle Dismantle motor found bearing motor 6206 bad condition. Replace bearing motor with spare install ( EDI & MUHAIMIN & DADANG )
|
|
2025-09-08
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-&-473-CC1
|
Clean up panel I/O
|
Clean up panel I/O LC1-2RA 71, LC1-2RA 41, LC1-2RA 11, 4C2-2RC 22, 4C2-2RC 21, 4C2-2RC 11, 4C2-2RC 23, 4C2-2RC 24 from dirty of dust and coal use blower ( ADI & EVE AKPAN )
|
|
2025-09-05
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CKD
|
Issue motor burned at hoist
|
Check at location, motor hoist need scafolding to check. Measure use Meger, found grounded between line R-S-T to grounded ( EDI & ADI )
|
|
2025-09-05
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER4
|
Install Battery UPS
|
Do install battery UPS of ER4 ( JAJAT & AGUS & RIZAL & ADI & AIMAN & ANDRI & MUHAIMIN & ANDRI & DADANG )
|
|
2025-09-05
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3
|
Pulling cable data 6P x 0.75 x 3 ER 3 ( @25m ) + Install Module DI
|
Do pulling cable data 6P x 0.75 x 3 ER 3 ( @25m ) + Install Module DI ( JAJAT & RIZAL & AGUS & MUHAIMIN & ANDRI & DADANG )
|
|
2025-09-05
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3-&-ER4-&-ER5
|
Manuver Power ( format and procedure same with 1st manuver)
|
Do support manuver power at ER3 - ER4 and ER5 ( JAJAT & AGUS & RIZAL & ADI & ANDRI & MUHAIMIN & DADANG & AIMAN )
|
|
2025-09-04
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-&-ER4
|
Pulling cable Sensor Winding (L63-MD1 --- ER5) 2 X 6P X0,75 mm ( @70 m)
|
Pulling cable of winding CM. Cable already at Motor L63-MD1 dan IO ER 4. Connected cable at motor at panel I/O ER4 ( AGUS & RIZAL & MUHAIIMIN & ANDRI & DADANG & JAJAT )
|
|
2025-09-04
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
MAIN-GATE-ACCES-CONTROL
|
Inspection electrical and welding tools
|
Inspection electrical and welding tools of RMP total 40 units tagging blue color. Note 1 mixer is not safe because not full fill requirement safety of PT SBI tagging can not use ( ADI & JAJAT )
|
|
2025-09-04
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
AUTOMATION-NL1.1.2-&-3
|
Replace PS dan CI830, di NL1.1. 3 , add module AI830
|
Automation : Replace PS dan CI830, di NL1.1. 3 , add module AI830---- Online (Normal) ( JAJAT & RIZAL )
|
|
2025-09-04
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-MD1
|
Observation / Replace CB
|
Clean up area motor - filter motor - carbon bursh room from dirty of dust from dirty of dust. Measure actual long every carbon brush found long carbon brush1: 38.89 cm 2: 38.73 cm 3: 34.10 cm 5:39.82 cm 6: 31.83 cm7 cm: 46.41 cm 8: 43.60 cm 9: 45.54 cm 10: 45.24 cm 11: 43.85 cm 12: 40.34 cm 13: 33.86 cm 14: 28.88 cm 15: 33.28 cm 16: 42.97 cm 18: 25.78 cm 19: 36.46 cm 20: 39.92 cm 21: 40.03 cm 22: 34.70 cm 23: 43.82 cm 24: 43.90 cm. Replace carbon brush 3-6-13-14-15-18-22 with spare carbon brush ( EDI & ADI )
|
|
2025-09-03
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
BLENDING-SILO-&-FEED-BIN-&-PH-&-CM
|
Cleaning panel I/O
|
Do clean up panel I/O at east and west blending from dirty of dust use hand blower also clean up panel pfister feeder. Also clean up panel I/O area water pump and area raw mill & coal mill for HS from dirty of coal use hand blower. Clean up panel I/O area feed bin and pre heater from 8th floor to 2nd floor ( ADI & EVE TEGAR )
|
|
2025-09-03
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
PANEL-I_O-AREA-N41-&-N31
|
Replace CI 801 --2 Each di N31 + Replace Modul IO di N41 Bus A
|
Do replace CI 801 2 each at N31 and replace module I/O at N41 Bus A ( RIZAL & ANDRI )
|
|
2025-09-03
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-BL5
|
Prepare & Replace Motor
|
Take motor spare from warehouse bring to location. Install motor spare and do connection cable power. Do function test motor with every speed and measure vibration and noise for FS and LS motor ( AGUS & EDI & JAJAT & MUHAIMIN & DADANG )
|
|
2025-09-03
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3-&-ER4-&-ER5
|
Manuver Black Out
|
Do support black out at ER3 - ER4 and ER5 ( JAJAT & AGUS & RIZAL & ADI & MUHAIMIN & ANDRI & AIMAN & DADANG )
|
|
2025-09-02
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data spare part work shop electric1 ( Choose spare part for CEMS and MC )
|
Take out spare CEMS from cabinet 25 and put at special cabinet and also YM CEMS. Add spare part MC at cabinet 68 file spare part of ws electric nr1 ( JAJAT & ADI )
|
|
2025-09-02
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TR1
|
Final Elec Drawing + observation posibility pulling cable L1C TR1 to ER6
|
Final drawing of electrical and do observation pulling cable from L1C TR1 to ER6 ( AGUS )
|
|
2025-09-02
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR Service Analyser
|
Clean up flange probe - sample line - filter sample - diaphragm pump - filter balston - dryer gas pump from dirty of coal. Check humidity sensor function and filter humidity, result function sensor humidity normal and filter humidity still ok ( MUHAIMIN & ANDRI )
|
|
2025-09-02
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR Service Analyser
|
Clean up flange, probe, sample line, filter probe, diaphragm pump, dryer gas pump, filter balston from dirty of dust. Check humidity sensor function and filter humidity, result function sensor normal and filter humidity good condition ( EDI & EVE TEGAR & DADANG )
|
|
2025-09-01
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data spare part work shop electric 1
|
Make data file spare part cabinet 7 - cabinet 9 - cabinet 47 also add spare part at cabinet 25 cabinet 61. Safe file at PC as spare part of ws electric nr1 ( JAJAT & ADI )
|
|
2025-09-01
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-L63-RM1-&-463-KL1-&-473-CC1
|
PMR critical motor
|
Clean up area motor and filter motor. Measure vibration-noise-temperature for FS and LS. Add grease 20 times-25 times-35 times for FS and LS motor ( EDI & EVE TEGAR )
|
|
2025-09-01
7 months ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
L1C-TR1
|
Motor Travel Brake failure
|
Check at location found cable motor brake short, repare cable and do test function motor brake result ok ( AGUS & MUHAIMIN & ANDRI & DADANG )
|
|
2025-09-01
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Complete data TPM
|
Complete data TPM of ER4 bottom floor, print out, take sign of people joint TPM install at dash board TPM ( RIZAL )
|
|
2025-08-29
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR Service Analyser
|
Clean up flange probe - sample line - filter sample line - diaphragm pump - filter balston - dryer gas pump from dirty of coal. Check humidity sensor function and filter sensor, result function sensor good and filter sensor good condition ( RIZAL, EVE TEGAR, ANDRI )
|
|
2025-08-29
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER6
|
Continue Project L1C-TR1 (Labeling SX, MS, MX) + Test signal
|
Labelling for SX, MS, MX and do test signal from local to I/O panel result ok ( AGUS, EDI, MUHAIMIN, DADANG )
|
|
2025-08-29
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3-&-ER4-
|
PMR Clean Up MCC ER All Area Kiln Nar1
|
Clean up MCC ER3 and ER4 top also bottom from dirty dust use brush and mop room ( DIVA )
|
|
2025-08-29
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data spare part work shop electric 1 + complete data check sheet PMR and WBI month of August 2025, template TPM ER4 for safety
|
Complete data check sheet for PMR critical motor for 25-8-25 also make notification for job . Make template safety and print out template ER4. Make data file spare part cabinet 8 - cabinet 9 ( JAJAT, ADI )
|
|
2025-08-28
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data spare part work shop electric 1 + complete data check sheet PMR and WBI month of August 2025
|
Make data spare part cabinet 74 - cabinet 75 safe at PC as spare part of work shop nr1. Complete data check PMR analyser L63 2K1-L63 2K2-L63 2K3-483 2K1-463 2K1-443 2K1-423 2K1, PMR camera burner-pyrometer-IR TAD-t scanner-hoist crane-critical motor RM KL CM CC. Also WBI bottom blending,KL,CC,clinker silo-top blending,CT,PH,KL-feed bin,RM,CT,dust transport-CM,truck lift, bc transport, tripper, reclaimer coal-panel lighting & welding ( JAJAT, ADI, EVE TEGAR )
|
|
2025-08-28
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Continue Cover motor Area 393
|
Make cover motor at work shop for area 393 ( EDI, MUHAIMIN , DADANG )
|
|
2025-08-28
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER6
|
Continue Project L1C-TR1 (Labeling SX, MS, MX)
|
Do labeling for SX - MS - MX. Also install labelling at cable signal. Test signal from local to I/O panel result signal ok ( AGUS, EDI, MUHAIMIN, DADANG )
|
|
2025-08-28
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR Service Analyser
|
Clean up flange probe - probe - filter sample line - sample line - diaphragm pump - filter balston - dryer gas pump from dirty of dust. Check humidity sensor function and filter humidity, result function sensor normal and filter good condition ( RIZAL
|
|
2025-08-27
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data spare part work shop electric 1
|
Make data spare part cabinet 69 - cabinet 73 safe at PC as spare part of work shop nr1 ( JAJAT & ADI )
|
|
2025-08-26
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
Y43-1G1 HRG ELGA 2 Abnormal
|
Motor stuck, wire broken (Waiting new ones) ( RIZAL & JAJAT & ANDRI )
|
|
2025-08-26
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-BE1-& 433 BE1
|
Replace battery AUTO Grease
|
Replace battery AUTO Grease for 393 BE1 & 433 BE1
|
|
2025-08-27
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER6
|
Continue Project L1C-TR1
|
Do wiring cable I/O at ER6, check signal from local to I/O result ok ( JAJAT, EDI, RIZAL, ADI, MUHAIMIN, ANDRI, DADANG )
|
|
2025-08-27
7 months ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
L1C-BC6-
|
Install lighting lamp at tail pulley
|
Do install lighting lamp at tail pulley. Test function result ok lighting lamp on ( RIZAL & ANDRI )
|
|
2025-08-27
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Check Motor Bogie (Replace Bearing) for L1C-RE1,
|
Do replace bearing motor bogie number of bearing 6307. Test motor no load result normal for RST | ( MUHAIMIN, EVE TEGAR & DADANG )
|
|
2025-08-26
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data spare part work shop electric 1
|
Make data spare part cabinet 62 - cabinet 63 - cabinet 68, safe at PC as spare part of work shop nr1 ( JAJAT & ADI )
|
|
2025-08-26
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
TPM-ER4
|
Install sign safety and cleaning tool
|
Install sign safety for EVACUATION ROUTE 6 each and cleaning tool 2 each at TPM ER4 ( ADI )
|
|
2025-08-26
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Prepare Cover Motor Area 393
|
Prepare cover motor for area 393 ( EDI & MUHAIMIN & ANDRI & DADANG )
|
|
2025-08-26
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-2K1
|
Relay Purging Probe 1 abnormal
|
Replace relay, monitor function purging analyser ( RIZAL )
|
|
2025-08-26
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1-8TH-FLOOR
|
Washer Motor can not start
|
Replace receptacle, test function result ok ( MUHAIMIN & ANDRI )
|
|
2025-08-26
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
AREA-DRIVE-NORTH-SIDE
|
Repare lighting lamp off
|
Replace lighting lamp with spare, test on result lighting lamp on ( EDI & DADANG )
|
|
2025-08-25
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-FN1
|
Issue reading high vibration
|
Replace vibration sensor, result reading vibration back normal ( RIZAL & ANDRI & EVE FAJAR )
|
|
2025-08-25
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data spare part work shop electric 1
|
Make data spare part cabinet 56 - cabinet 58 - cabinet 61, safe at PC as spare part of work shop nr1 ( JAJAT & ADI )
|
|
2025-08-25
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-463-KL1
|
PMR Service Critical Motor Area RM dan KL
|
Clean area motor and filter motor. Measure vibration-noise-temperature FS and LS motor. Add grease motor 25 times-30 times-35 times for FS and LS motor ( MUHAIMIN & DADANG )
|
|
2025-08-25
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-2K1
|
Check Service analyser
|
Clean up filter sample line and solenoid valve. Result reading analyser ok ( RIZAL & ANDRI )
|
|
2025-08-25
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG-&-ER6
|
Observation all safety device
|
Check DC ampere at HRG and ER6 wiring connection I/O ( JAJAT & EVE TEGAR )
|
|
2025-08-25
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-463-KL1
|
PMR Service Critical Motor Area RM dan KL
|
Clean area motor and filter motor. Measure vibration-noise-temperature FS and LS motor. Add grease motor 25 times-30 times-35 times for FS and LS motor ( MUHAIMIN & DADANG )
|
|
2025-08-22
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SCB
|
Resetting PPM at miltronic card
|
Do resetting PPM at sensor miltronics. Result function ok ( EDI )
|
|
2025-08-22
7 months ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
WORK-SHOP-&-L1C-TR1
|
Prepare Print HAC L1C-TR1
|
Do prepare print out HAC for L1C TR1. Also install HAC at location ( AGUS & MUHAIMIN & JAJAT & RIZAL & ANDRI & DADANG & EVE HADIF & EDI & ADI )
|
|
2025-08-22
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Fabrication 4 Motor Cover Area 393-RF1
|
Do fabrication cover motor for area 393 RF1 ( ANDRI & DADANG )
|
|
2025-08-22
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
indication O2 often spike at10 minutes
|
Replace relay and service sample pump replace connector tube at sample pump. Service s/v 3 way for release pressure after purging found dirty inside. After clean up 3 times purging reading O2 normal ( RIZAL & EDI )
|
|
2025-08-22
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data spare part and safe file at PC
|
Make data file for cabinet 49 - cabinet 50 - cabinet 54 - cabinet 55 - cabinet 73 safe file as spare part ws electric Nr1 also move every file to this name of spare part ws electric Nr1 ( JAJAT & ADI & EVE HADIF )
|
|
2025-08-22
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER4
|
GEMBA TPM ER4
|
Clean area ER4 bottom area from dirty dust use broom, also vacuum cleaner. Update data TPM at dash board ( JAJAT & RIZAL & AGUS & EDI & ADI & MUHAIIMIN & TRUBA JAGA CIPTA & ANDRI & DADANG & EVE HADIF )
|
|
2025-08-21
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data spare part and safe file at PC
|
Make data spare part cabinet 67 - cabinet 73. Safe file as satelit part electric kiln form at personal computer as 21-8-25 ( JAJAT & ADI )
|
|
2025-08-21
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
List comsumable part (Item number )
|
List consumable part include number item every part ( AGUS & RIZAL )
|
|
2025-08-21
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SCB
|
info often speed failure
|
Do adjust probe sensor and service card speed sensor. Result ok ( EDI & ANDRI & DADANG )
|
|
2025-08-21
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L33-BF1
|
Service indication local stop
|
Do service indication local stop at L33 BF1, test function result ok ( EDI & ANDRI & DADANG )
|
|
2025-08-21
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR Service Analyser
|
Clean up flange probe, sample line, filter sample line, diaphragm pump, filter balston, dryer gas pump from dirty of dust coal. Check humidity sensor and filter sensor, result function sensor ok and filter still good condition ( MUHAIMIN & EVE HADIF )
|
|
2025-08-20
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data spare part electric, safe file at PC
|
Make data spare part cabinet 79 - cabinet 80 - cabinet 81. Safe file as satelit part electric kiln form at personal computer as 20-8-25. Also put spare part outside of electric at cabinet 22 - cabinet 51 - cabinet 67 - cabinet 73 and add additional spare part at file ( JAJAT & ADI )
|
|
2025-08-20
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-BC5-&-RADIO-LINK
|
Top Up grease + Cleaning Up control and Radio Link
|
Do top up AUTO grease L1C BC5 and cleaning control and radio link use hand blower ( MUHAIMIN & ANDRI )
|
|
2025-08-20
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Fabrication LCS L1C-BC1-3 + accecories
|
Do fabrication LCS for L1C BC1 and L1C BC3 also prepare accecories for LCS ( AGUS & DADANG )
|
|
2025-08-20
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR Service analyser
|
Clean flange probe-probe-sample line-filter sample line-diaphragm pump-filter balston-dryer gas pump from dirty of dust. Check humidity sensor and filter sensor, result function sensor humidity and filter ok ( RIZAL & EVE HADIF )
|
|
2025-08-19
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-BC4
|
Lighting lamp head pulley off
|
Install lighting lamp for head pulley, replace timer for lighting lamp. Test on function of lighting lamp result ok ( ADI & ANDRI & DADANG )
|
|
2025-08-19
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-FA2
|
Cooling Fan often failure
|
Clean up filter cooling fan, found filter very dirty ( AGUS & EVE HADIF )
|
|
2025-08-19
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR Service CEMS
|
Clean up purge air unit motor and filter purge air unit- flange with tube dust hunter- swivel window transciever / recieve also reflector-alignment dust hunter- transducer A & B - CEMS room also gas CEMS room - filter cabinet MCS 100 E from dust ( RIZAL & EVE FAJAR )
|
|
2025-08-18
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-&-473-CC1
|
PMR Service Critical Motor KL and Cooler
|
Clean area motor and filter motor. Measure vibration-noise-temperature FS and LS motor. Add grease 25 times-30 times for LS and FS motor ( AGUS & DADANG )
|
|
2025-08-18
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-L63-RM1
|
PMR Service Critical Motor
|
Clean area motor and filter motor. Measure vibration-noise-temperature FS and LS motor. Add grease 25 times-30 times for LS and FS motor ( MUHAIMIN & ANDRI )
|
|
2025-08-16
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TL1
|
Pulling cable 6P around 100m
|
Bring cable from ER3 to location, pulling 3 line cable from motor dumping coal truck to ER6 ( JAJAT & AGUS & & EDI &RIZAL & ADI & MUHAIMIN & DADANG & AIMAN )
|
|
2025-08-15
7 months ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
363-MD1
|
Replace CB no12 and cleaning area motor
|
Cleaning Motor and replace CB no 12 with spare ( MUHAIMIN & ANDRI & DADANG )
|
|
2025-08-15
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data spare part and safe file at PC
|
Make data spare part Cabinet 67 - Cabinet 68 and safe file at computer as Satelit Electric Kiln Form 15-8-25 ( JAJAT & ADI )
|
|
2025-08-15
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3-&-423-BF1-M1
|
Dismantling Battery EX ER3 UPS + Cleaning Motor Area 423-BF1
|
Do dismantling battery ex UPS ER3 bring to scrap chemical and cleaning motor area 423 BF1 ( MUHAIMIN & ANDRI & AIMAN & DADANG )
|
|
2025-08-15
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TR1
|
Make sure signal Tonase Pulse + Total tonase+ Upload HMI to Factory talk
|
Do put signal pulse tonase and total tonase for tripper to CCR and upload HMI to factory talk ( RIZAL )
|
|
2025-08-15
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Drawing Electrical Truck lift
|
Do drawing electrical for area truck lift save file at computer ( AGUS )
|
|
2025-08-15
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
FEED-BIN
|
WBI FEED-BINC-363-RM1--443-CT1-DUST-TRANSPORT--BAG-FILTER and cleaning I/O modul
|
Do WBI Electric & Ins & Check I/O Feed Bin and cleaning use hand blower I/O module ( EDI & EVE FAJAR )
|
|
2025-08-14
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L3C-TL1
|
Observation installation Sensor VEGA + Pulling cable at truck lift
|
Take observation location for install sensor VEGA and pulling cable at truck lift ( JAJAT & RIZAL )
|
|
2025-08-14
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HEAT-EXCHANGER
|
Prepare cable + Support Welding point Heat Exchanger
|
Pulling cable for welding point from junction box to location connected cable. Install scafolding at location to make safe while pulling cable welding heat exchanger ( EDI & MUHAIMIN & EVE FAJAR & DADANG )
|
|
2025-08-14
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Drawing Electrical Truck lift
|
Do drawing electrical for area truck lift save file at computer ( AGUS )
|
|
2025-08-14
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data spare part and safe file at PC
|
Make data spare part Cabinet 61 and safe file at computer as Satelit Electric Kiln Form 14-8-25 ( JAJAT & ADI )
|
|
2025-08-13
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR Service Analyser Coal Mill
|
Clean up flange probe, sample line, filter sample line, diaphragm pump, filter balston dryer gas pump from dirty of coal. Check humidity sensor and filter humidity, result function ok and filter good condition ( RIZAL & ANDRI )
|
|
2025-08-13
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HEAT-EXCHANGER
|
Prepare cable + Support Welding point Heat Exchanger
|
Do prepare cable and support for welding point at heat exchanger ( MUHAIMIN & EVE FAJAR & DADANG )
|
|
2025-08-13
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Drawing Electrical Truck lift
|
Do drawing electrical for area truck lift save file at computer ( AGUS )
|
|
2025-08-13
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data part work shop per cabinet save at file PC
|
Make data spare part Cabinet 49 - Cabinet 50 - Cabinet 56 - Cabinet 63 and safe file at computer as Satelit Electric Kiln Form 13-8-25 ( JAJAT & ADI )
|
|
2025-08-12
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HEAT-EXCHANGER
|
Prepare cable Welding Heat Exchanger
|
Do prepare cable welding heat axchanger ( EDI & MIHAIMIN & DADANG )
|
|
2025-08-12
7 months ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
WORK-SHOP
|
Drawing Electrical Truck lift
|
Do drawing electrical for area truck lift save file at computer ( AGUS )
|
|
2025-08-12
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-CC1-CYCLONE-AREA
|
Cleaning Motor
|
Do cleaning motor CV at cyclone cooler from dirty of dust ( EDI & MUHAIMIN & DADANG )
|
|
2025-08-12
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR Service CEMS
|
Clean motor purge air unit and filter purge air unit, flange with tube dust hunter-swivel wndows transciever / reciever also reflector-alignment dust hunter, transducerA and transducer B of flowsic 100, CEMS room also gas room, filter cabinet MCS 100 E from dirty of dust ( RIZAL & ANDRI )
|
|
2025-08-12
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data spare part and safe file at PC
|
Make data spare part Cabinet 83 - Cabinet 82 - Cabinet 51 - Cabinet 57 and safe file at computer as Satelit Electric Kiln Form 12-8-25 ( JAJAT & ADI )
|
|
2025-08-11
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Drawing Electrical Truck lift
|
Make drawing electrical for truck lift save at computer ( AGUS )
|
|
2025-08-11
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
BELT-FEED
|
Autodrain Belt Feed is not function
|
Check autodrain function normal, found MC is failure ( RIZAL & ANDRI )
|
|
2025-08-11
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-L63-RM1-&-463-KL1-&-473-CC1
|
PMR Service Critical Motor Area KL dan RM
|
Clean up area motor and filter motor. Measure vibration - noise - temperature FS and LS. Add grease motor for FS and LS 20 times - 25 times - 30 times ( EDI & MUHAIMIN & DADANG )
|
|
2025-08-11
7 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data spare part and safe file at PC
|
Make data spare part Cabinet 84 - Cabinet 76 - Cabinet 77 and safe file at computer as Satelit Electric Kiln Form 11-8-25 ( JAJAT & ADI )
|
|
2025-08-08
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L3C-TL1
|
Prepare cable ER 6 support Automation Truck lift
|
Do prepare cable for support automation L3C TL1. Bring cable to location continue pulling cable ( JAJAT & RIZAL & AIMAN & ANDRI & MUHAIMIN & DADANG )
|
|
2025-08-08
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HEAT-EXCHANGER
|
Install Welding point di Heat Exchanger ( 2nd floor )
|
Do install welding point at heat exchanger 2nd floor ( ANDRI & DADANG )
|
|
2025-08-08
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data spare part work shop per cabinet save at file PC
|
Make data spare part cabinet 71 - cabinet 72. Safe file at Satelit Kiln Form 8-8-25 ( JAJAT & ADI )
|
|
2025-08-08
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3-&-ER4-
|
PMR Clean Up MCC ER All Area Kiln Nar1
|
Clean up area MCC ER3 & ER4 top also bottom and filter cabinet. Continue mop ER3 & ER4 ( AIMAN )
|
|
2025-08-07
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data spare part work shop per cabinet save at file PC
|
Do data spare part at work shop for Cabinet 64 - Cabinet 65 - Cabinet 66 - Cabinet 70. Safe file at Satelit Kiln Form 7-8-25 ( JAJAT & ADI )
|
|
2025-08-07
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HEAT-EXCHANGER
|
Prepare Welding point Heat Exchanger
|
Do preparing welding point at heat exchanger ( AGUS & DADANG )
|
|
2025-08-07
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
BAC-ROOM
|
Install final conection support Welding BAC
|
Do install connection support welding point at BAC. Continue connect cable power at panel welding panel and ER6 ( RIZAL & EDI & MUHAIMIN & ANDRI )
|
|
2025-08-07
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER5-&-ER6
|
PMR Clean Up MCC ER All Area Kiln Nar1 (ER6 & ER5 top also bottom)
|
Clean up area MCC ER6 and ER5 top also bottom and filter cabinet from dirty of dust. Continue mop electrical room ( AIMAN )
|
|
2025-08-07
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Inspection electrical tools of PT AAS
|
Inspection electrical of PT AAS, 2 extention cable, 1 hot box, 1 main instrumentation tagging blue color ( JAJAT & ADI )
|
|
2025-08-06
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
363 BE1 & 363 FN3 make canopy motor
|
Make canopy motor for bag filter and bucket elevator raw mill, paint yellow color and install at location ( MUHAIMIN & ANDRI )
|
|
2025-08-06
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-W1-M3
|
Issue bearing motor bad condition or noise
|
Check found bearing motor dry. Number bearing 6312 ZZ C3 & 6212 ZZ C3. Replace bearing motor waiting alignment from CMB team ( EDY & DADANG, MUHAIMIN ,ANDRI )
|
|
2025-08-06
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
BAC-ROOM
|
Fabrication support rail mount BAC + Install Box Welding
|
Prepare cable tray at work shop. Install welding panel at BAC and cable tray beside welding panel. Put cable power for welding at cable tray ( ADI & ANDRI & MUHAIMIN )
|
|
2025-08-06
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L3C-RE1
|
L3C RE1 clean up panel control and I/O panel
|
Clean up panel control and I/O for reclaimer use hand blower from dirty of dust coal ( JAJAT & EDI & ADI )
|
|
2025-08-06
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Prepare Welding Point (Heat Exchanger )
|
Do prepare welding point panel of heat exchanger at work shop. Do wiring panel welding ( AGUS )
|
|
2025-08-06
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
MOTOR-INJECTION
|
Lighting lamp at motor injection off
|
Replace lighting lamp off 3 each with spare lighting lamp, test function result lighting lamp on ( EDI & DADANG )
|
|
2025-08-06
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR Service Analyser
|
Clean flange probe, filter sample line, sample line, diaphragm pump, dryer gas pump, filter balston from dirty of dust. Check humidity sensor and filter humidity, result filter good condition ( RIZAL )
|
|
2025-08-05
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Fabrication support rail mount BAC
|
Do fabrication support rail mount of BAC ( ANDRI & DADANG )
|
|
2025-08-05
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HEAT-EXCHANGER
|
Prepare Box Welding point
|
Do prepare box welding point for heat exchanger. Take box at ware house electric behind ER5. In order to new installation 2nd floor heat exchanger ( AGUS & DADANG )
|
|
2025-08-05
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR Service CEMS + CGA
|
Clean up motor purge air unit and filter purge air unit, flange with tube dust hunter-swivel window reflector & transciever / reciever -alignment dust hunter-transducer A & B for flowsic 100-CEMS room-CEMS gas room-filter cabinet MCS 100E from dirty of dust ( RIZAL )
|
|
2025-08-05
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR Analyzer Coal Mill
|
Clean flange, sample line, filter sample line, filter balston, dryer gas, diaphragm pump from dirty of coal. Check humidity sensor and filter sensor result function normal and filter good condition ( ADI & MUHAIMIN )
|
|
2025-08-04
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Fabrication support rail mount BAC
|
Do fabrication support rail mount of BAC at work shop ( DADANG & ANDRI & MUHAIMIN )
|
|
2025-08-04
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Collective Wiring , Truck lift (PLC), Tripper , Re-wiring
|
Do collective wiring of PLC truck lift and rewiring safe file at computer ( AGUS )
|
|
2025-08-04
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-463-KL1
|
PMR Critical Motor RM dan Kiln
|
Clean area motor and filter motor. Measure vibration - noise - temperature FS and LS motor. Add grease motor 25 times - 30 times for FS and LS motor. Replace battery for AUTO Grease at 363 MD1 2 each ( EDI & MUHAIMIN )
|
|
2025-08-04
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
CEMS issue problem at MCS 100E
|
Clean up connector, on and off power before on power tighten cable control heat at card heat control, MCS 100 E running well ( RIZAL & ANDRI )
|
|
2025-08-04
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data part work shop per cabinet save at file PC + Scanning for PMR also WBI month of July 2025
|
Do scanning check sheet PMR and WBI month of July 2025 send to Mr. Jajat. Make data spare part cabinet 60 - cabinet 59 safe at computer as Satelit Part Kiln Form 4-8-25 ( JAJAT & ADI )
|
|
2025-08-02
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER6
|
Pulling cable power for panel welding BAC
|
Pulling cable power welding panel BAC at ER6 ( JAJAT, AGUS, EDI, RIZAL, ADI, MUHAIMIN, ANDRI, DADANG )
|
|
2025-08-02
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TL1
|
Issue radio link problem
|
Check program and service radio link found there is no power replace power supply, test function result ok ( RIZAL & JAJAT )
|
|
2025-08-02
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FN4
|
Replace motor-wiring, install taper lock, pulley
|
Lifting motor spare from burner floor to location, install motor. Check ampere no load at ER5 result ok around 26 to 27 ampere ( JAJAT, AGUS, EDI, RIZAL, ADI, ANDRI< MUHAIMIN, DADANG )
|
|
2025-08-02
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FN4
|
Replace motor-wiring, install taper lock, pulley
|
Lifting motor spare from burner floor to location, install motor. Check ampere no load result ok around 26 ampere until 27 ampere. Install tapper lock, pulley motor, connect cable power motor ( AGUS, EDI, RIZAL, ADI, JAJAT, MUHAIMIN, ANDRI, DADANG )
|
|
2025-08-02
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TL1
|
Issue radio link problem
|
Check program and service radio link found there is no power replace power supply, test function result ok ( RIZAL & JAJAT )
|
|
2025-08-01
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L3C-RE1
|
Motor Bogie run one side
|
Check program ok, found there plate torn at steering side material, Observation Travelling ( RIZAL & EDI & ANDRI )
|
|
2025-08-01
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-CC1
|
Stop Contact failure (Area Cooller) + lighting lamp off
|
Replace stop contact test function lighting lamp result ok ( EDI & DADANG & ANDRI )
|
|
2025-08-01
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA4
|
Fabrication / prepare lifting motor
|
Prepare Elect shop Hoist-rewiring ( AGUS & MUHAIMIN & DADANG )
|
|
2025-08-01
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-AC2
|
Issue speed Motion (fabrication sensor propeller motion)
|
Fabrication propeller sensor, and do adjust position. Test function result ok ( EDI & RIZAL & ANDRI )
|
|
2025-08-01
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data part work shop per cabinet save at file PC
|
Make data spare part cabinet 53 - cabinet 54 - cabinet 58 safe at Safe file at computer as Satelit Part Electric Kiln Form 1-8-25 ( JAJAT & ADI )
|
|
2025-07-31
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data part work shop per cabinet save at file PC + Scanning for June 2025
|
Do scanning check sheet for PMR and WBI month of June 2025 send to Mr.Jajat email. Print out check sheet PMR and WBI 3 copy every check sheet. Make data spare part cabinet 52 Safe file at computer as Satelit Part Electric Kiln Form 31-7-25 ( JAJAT & ADI )
|
|
2025-07-31
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR Analyzer Coal Mill
|
Clean up flange, sample line, filter sample line, diaphragm pump, filter balston, dryer gas pump from dirty of dust coal. Check humidity sensor and fiter sensor result filter condition ok ( RIZAL & ANDRI )
|
|
2025-07-31
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
Install Motor Circulation
|
Install motor circulation at HRG test function result ok ( JAJAT & MUHAIMIN )
|
|
2025-07-31
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-CC1
|
Check ALL Greasing Area Cooller
|
Check Auto grease motor, add empty level Auto grease motor for 473 FA2- 473 FA3 - 473 FA6 and check battery replace with spare battery for 473 FA1 - 473 FA3 - 473 FA8 - 473 FA9 - 473 FAA test function result ok ( EDI & MUHAIMIN )
|
|
2025-07-31
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-FN2
|
Install Auto Greasing
|
Install Auto Greasing motor ( AGUS & DADANG )
|
|
2025-07-30
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-FN1
|
PM 363-FN1, Issue Hot Bearing Motor
|
Check condition actual motor measure use Megger ( AGUS & RIZAL & MUHAIMIN & DADANG & ANDRI )
|
|
2025-07-30
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-AC2-&-493-AC3
|
Install Greasing + Cleaning Motor
|
Clean up motor and install AUTO Grease motor ( DADANG )
|
|
2025-07-30
8 months ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
363-RM1
|
Cleaning ALL IO Raw Mill
|
Clean up I/O panel area Raw Mill ( ANDRI )
|
|
2025-07-30
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Update PMR + WBI + Scanning for June 2025
|
Complete data check sheet PMR analyser L63 2K1-L63 2K2-L63 2K3-483 2K1-463 2K1-443 2K1-423 2K1 and WBI Feed Bin-Raw Mill-CT-Dust Transport-BF-Bottom Blending-Kiln-Cooler-Clinker Silo-Top Blending-CT-PH-Kiln-Coal Mill-Truck Lift-BC Transport-Tripper Reclaimer Coal month of June 2025 ( JAJAT & ADI )
|
|
2025-07-29
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-AC2-&-493-AC3
|
Auto grease low level
|
Replace AUTO grease with spare full ( JAJAT & AGUS )
|
|
2025-07-29
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
List observation posibility recondition motor at OH 2026
|
Make list observation for posibility recondition motor at OH 2026 ( AGUS )
|
|
2025-07-29
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
333-WF1-&-BIN-LS-&-BIN-SHALE-SILILICA
|
Lighting lamp off
|
Replace lighting lamp at 333 WF1 and lighting off, result test on lighting lamp on ( EDI & RIZAL & ANDRI )
|
|
2025-07-29
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data part work shop per cabinet save at file PC
|
Make data spare cabinet 13 - cabinet 19 - cabinet 20 - cabinet 21. Safe file at computer as Satelit Part Electric Kiln Form 29-7-25 ( JAJAT & ADI )
|
|
2025-07-28
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Complete data TPM ER4
|
Complete data TPM ER4, save data at computer, print out install at dash board take print out TPM ER4 at CCR bring to work shop. Make data safety at SHE SIG print out install at dash board. Take board for TPM at civil building work shop bring to electrical work shop ( RIZAL & ADI & EDI )
|
|
2025-07-28
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CAMERA-BURNER
|
Install Sensor Temp at Camera Burner ( Use way of temperature pyrometer )
|
Prepare support sensor temperature at work shop, install sensor temperature at camera burner. Result ok ( RIZAL & ANDRI )
|
|
2025-07-28
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-L63-CM1-463-KL1-473-CC1
|
PMR Critical Motor area raw mill-coal mill-kiln-cooler
|
Clean up area motor and filter motor. Measure vibration-noise-temperature for FS and LS add grease 25 times-30 times for FS and LS to make vibration below 4 mm/s and noise below 2 gE ( AGUS & EDI )
|
|
2025-07-25
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER4
|
TPM ER4, clean up area
|
Clean up area ER4 front and inside, do documentation for TPM. Make documentation safety area at ER4 send to Mr. Rizal for data TPM ER4 ( RIZAL & ADI & AIMAN )
|
|
2025-07-25
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-FN1&-363-FN2-&-363-MD1
|
Install Temp DE dan NDE, Cek Bearing Motor for Greasing, Cleaning Motor +Cek Carbon brush ALL Motor RM
|
Install temperature of DE and NDE check indication temperature at CCR result are indication temperature high do check range temperature at CCR add cooling air at motor result temperature stable at 73 degree celcius. Clean up area motor 363 MD1, 363 FN1 & 363 FN2 also clean carbon brush 363 MD1 after clean up carbon brush room area use instrument air supply. Check bearing motor for greasing, do add greasing at main drive raw mill, 363 FN1 & 363 FN2 ( JAJAT & AGUS & EDI & ANDRI )
|
|
2025-07-25
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Complete data TPM ER4
|
Complete data TPM ER4 save at computer ( RIZAL )
|
|
2025-07-25
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data part work shop per cabinet save at file PC + Update PMR + WBI
|
Complete data check sheet PMR service analyzer L63 2K1-L63 2K2-L63 2K3-483 2K1-463 2K1-443 2K1-423 2K1 for 3rd weeks of June 2025, PMR service critical motor RM-PH-CM-CC1 for month of june 2025 ( JAJAT & ADI )
|
|
2025-07-24
8 months ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
BAC-ROOM
|
Prepare control + pulling BAC room
|
Preparing control and pulling BAC room ( AIMAN & ANDRI )
|
|
2025-07-24
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR Service Analyser Coal Mill NAR1
|
Clean up flange, sample line, filter sample line, diaphragm pump, filter balston, dryer gas from dirty of coal. Check humidity sensor and sensor humidity result filter ok ( RIZAL )
|
|
2025-07-24
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-FN1-&-363-FN2
|
Issue temp Abnormal , Make sure addressing ST12, CH5/6, Prepare Pulling cable , Temp Winding
|
Pulling cable 6 pairs from motor to ST 12 ( AGUS & EDI & ANDRI )
|
|
2025-07-24
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data part work shop per cabinet save at file PC
|
Make data spare part cabinet 33 - cabinet 25- cabinet 26- cabinet 27- cabinet 32 write at PC as Satelit Part Electric Kiln Form 24-7-25 ( JAJAT & ADI )
|
|
2025-07-23
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data part work shop per cabinet save at file PC
|
Make data spare part cabinet 46 - cabinet 43 - cabinet 44- cabinet 45 - cabinet 23 - cabinet 38 - cabinet 39 - cabinet 37 write at PC as Satelit Part Electric Kiln Form 23-7-25 ( JAJAT & ADI )
|
|
2025-07-23
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-FN1
|
Observation abnormaly temperature
|
Cross check indication temperature compare with display result ok different 6 until 7 degree celcius ( AGUS )
|
|
2025-07-23
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR Service Analyser Preheater & IKGA N1
|
Clean up flange, probe, filter sample, sample line, diaphragm pump, filter balston, dryer gas pump from dirty of dust. Check humidity sensor and fiter sensor result filter sensor ok ( RIZAL )
|
|
2025-07-23
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L3C-TR1
|
Repare LS -Cleaning control dan Radio Link
|
Clean up area LS - area control - and radio link from dirty of dust coal use instrument air. Add silicone for cable gland ( EDI )
|
|
2025-07-22
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data part work shop per cabinet save at file PC + Update PMR + WBI
|
Make data spare part cabinet 46 - cabinet 47 - cabinet 48 write at PC as Satelit Part Electric Kiln Form 22-7-25 ( JAJAT & ADI )
|
|
2025-07-22
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L3C-BC7-TRIPPER
|
Info often babbling
|
Decrease setting speed from 47 Hz to 35 Hz, decrease decelaration setting ( parameter C1-2 & C1-4 ) from 10 s to 5 s, setting stick limit switch travel result function tripper ok ( AGUS & EDI & ANDRI )
|
|
2025-07-22
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FN7
|
Issue indication vibration error
|
Cross check at CCR operator indication vibration value 0 mm/s ( AGUS & EDI & ANDRI )
|
|
2025-07-21
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
373-FA4
|
Issue low for flow
|
Blowing piping sample result flow back to normal indication ( RIZAL & ANDRI )
|
|
2025-07-21
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-AC2
|
Issue on and off 3 times
|
Adjust speed sensor result ok ( JAJAT & EDI )
|
|
2025-07-21
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SCB
|
Cross Cek Indikation Motion Speed
|
cross check speed sensor result ok ( AGUS & EDI )
|
|
2025-07-21
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-CT1
|
Solenoid valve no 23 issue leakage
|
Replace solenoid valve, test function result ok s/v normal ( RIZAL & ANDRI )
|
|
2025-07-21
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-L63-RM1-&-463-KL1-&-473-CC1
|
PMR Service Critical Motor & LSR RM & CM1 & 463 KL1 & 473 FN7
|
Clean up area motor and filter motor. Measure vibration - noise - temperature for LS and FS. Add grease 20 times - 25 times and 30 times for FS and LS motor ( AGUS & EDI )
|
|
2025-07-21
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data part work shop per cabinet save at file PC + Update PMR + WBI
|
Make data spare part cabinet 34 - cabinet 35 - cabinet 36 write at PC as Satelit Part Electric Kiln Form 21-7-25 and add spare part for cabinet 10 for vibration sensot ( vibration transmitter 4 each brand ifm electronics ) ( JAJAT & ADI )
|
|
2025-07-18
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1
|
Activation DALOG (together with expert)
|
Activation DALOG accompany expert engineer DALOG ( RIZAL & EXPERT DALOG ENGINEER )
|
|
2025-07-18
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-TL1
|
Prepare cable comsumable truck lift
|
Prepare cable consumable for truck lift ( EDI & AGUS & MUHAIMIN & DADANG & AIMAN )
|
|
2025-07-18
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-FA2
|
Continue project 483 FA2
|
Do project 483 FA2, prepare cabinet, cable needed at cabinet ( AGUS )
|
|
2025-07-18
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-CC1
|
Install Memory Card CCTV Cooller
|
Do install memory card CCTV cooler ( ANDRI & DADANG )
|
|
2025-07-18
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data part work shop per cabinet save at file PC. Complete data check sheet PMR
|
Make file data spare part at PC as Satelit Part Electric Kiln form 18-7-25 for cabinet 22 - cabinet 23 - cabinet 24 - cabinet 28 - cabinet 29 - cabinet 30. Complete check sheet PMR service analyser for L63 2K1-L63 2K2-L63 2K3-483 2K1-463 2K1-443 2K1-423 2K1 for month of 2nd week of July 2025( ADI )
|
|
2025-07-17
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1-&-423-EP1-&-463-KL1-&-L63-SR1
|
WBI Elec & Ins & Check I/O GCT, EP,PH&KL and re check Amp L63-SR1 isuuse Fluktuation
|
Do WBI Elec & Ins & Check I/O GCT, EP,PH&KL and re check Amp L63-SR1 isuuse Fluctuation ( RIZAL & ANDRI )
|
|
2025-07-17
8 months ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
473-FA6
|
Install Motor Colling
|
Install motor cooling motor ( MUHAIMIN & DADANG )
|
|
2025-07-17
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data part work shop per cabinet save at file PC
|
Make data file spare part work shop cabinet 6 - 10 - 11 - 12- 16- 17safe at Satelit Part Electric Kiln form 17-7-25 ( EDI & ADI & JAJAT )
|
|
2025-07-16
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data part work shop per cabinet save at fi
|
Make data file spare part work shop cabinet 5 safe at Satelit Part Electric Kiln form 16-7-25 ( JAJAT & ADI )
|
|
2025-07-16
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1-4TH-&-8TH-FLOOR-AND-WS-MECHANIC-1
|
Tagging Tool Truba Jaga Cita
|
Inspection electrical and welding tools of PT Truba Jaga Cita at 8th and 4th floor of pre heater and work shop mechanic 1 tagging blue color for electrical totals 45 unit consits: extention cable - portable lamp - impact wrenh - grinding machine - drilling machine, for welding totlas 8 units ( JAJAT & ADI )
|
|
2025-07-16
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR Service Analyser CM
|
Clean up flange sample, filter sample, sample line, diaphragm pump - filter balston - dryer gas from dirty of dust coal. Check humidity sensor and filter humidity sensor result filter ok ( RIZAL & ANDRI )
|
|
2025-07-16
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA5-&-FA6
|
Replace cooling blower
|
Replace motor cooling blower 473 FA5 & 473 FA6. Bring down ex motor cooling blower to work shop ( MUHAIMIN & ANDRI & DADANG )
|
|
2025-07-15
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data part work shop per cabinet save at file PC
|
Make data spare part at work shop and write file at PC as Satelit Part Electric Kiln form 15-7-25 cabinet 1 - cabinet 2 - cabinet 3 ( JAJAT & ADI )
|
|
2025-07-15
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-FA2
|
Continue project 483 FA2
|
Project 483 FA2 ( AGUS & EDI & DADANG )
|
|
2025-07-15
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR Service CEMS
|
Clean up area purge air unit and filter purge air unit, swivel window T/R & R of dust hunter also flange with tube do alignment dust hunter, transducer A & B of flowsic 100, CEMS rooms, filter cabinet MCS 100 E and CEMS gas room from dirty of dust ( RIZAL & ANDRI )
|
|
2025-07-15
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-EL1
|
PMR Serv. Elevator PH NAR1 & WBI Sump El
|
PMR service elevator, clean up elevator room and top side also control at 8th floor from dirty of dust test run elevator from 8th to 1st floor result ok. WBI sump pump for elevator result ok ( MUHAIMIN )
|
|
2025-07-14
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data part work shop per cabinet save at file PC
|
Complete data check sheet PMR MCC load UPS and PLC ER5. Make data spare part every panel safe at PC as Satelit Part Electric Kiln form 14-7-25 start cabinet 1 ( ADI )
|
|
2025-07-14
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-FA2
|
Continue project
|
Continue project motor 483 FA2 ( AGUS & DADANG )
|
|
2025-07-14
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR service analyzer
|
Clean up probe, flange, filter sample, sample line, diaphragm pump, filter balston from dirty of dust. Check humidity sensor and filter humidity result filter ok ( RIZAL & ANDRI )
|
|
2025-07-14
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-L63-RM1
|
PMR Service Critical Motor & LSR RM&CM1
|
Clean up area motor, filter motor. Measure vibration - noise - temperature FS & LS motor. Add grease 20 times - 25 times - 30 times for FS & LS motor ( MUHAIMIN )
|
|
2025-07-14
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Data part per cabinet and save at file PC
|
Complete data check sheet PMR MCC load UPS and PLC ER5 ( JAJAT & ADI )
|
|
2025-07-11
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
Service analyzer
|
Clean up probe, cooling fan, rail probe from dirty of dust. Check humidity sensor result filter ok Result CO: 0.004 vol% - NO: 960 PPM - O2: 5.44 vol% ( ADI & EVE HADIF & EVE ANDRE )
|
|
2025-07-10
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-2K1
|
Prepare Temperature Sensor 483-2K1
|
Check at location found sensor temperature already install ( RIZAL & EVE IDAM )
|
|
2025-07-10
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Complete Report ALL PMR & WBI
|
Complete data check sheet PMR analyzer L63 2K1-L63 2K2-L63 2K3-483 2K1-463 2K1-443 2K1-423 2K1; PMR IR TAD-T Scanner-CCTV-Camera Burner ( Pyrometer ) ( ADI & EVE ANDRE )
|
|
2025-07-10
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1--463-KL1-BURNER-FLOOR
|
PMR IR TAD- T Scanner- CCTV - Camera Burner
|
PMR service IR TAD-T scanner-CCTV- Camera burner Pyrometer clean lens and flange from dirty of dust ( ADI & EVE ANDRE )
|
|
2025-07-10
8 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FN4
|
Observation 473-FN4 ( Test rotation, Test Load, Abnormaly, Discouple)
|
Test on motor check rotation - load ( JAJAT & EDI & MUHAIMIN & ANDRI )
|
|
2025-07-09
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FN4-AND-473-FN6
|
Prepare trouble problem at motor 37 KW-970 RPM
|
Find new motor at ware house bring to site and lifting to location. Dismantle existing motor 473 FN4 bring to work shop. Install new motor at site and install cable motor to LCS ( JAJAT & EDI & AGUS & RIZAL & ADI & MUHAIMIN & DADANG & EVE IDAM & EVE ANDRE & EVE HAFID )
|
|
2025-07-08
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-FEED-BIN
|
Tidy up garbage put in garbage tank
|
Take garbage at floor put back in garbage tank from Feed Bin to Raw Mill ( EDI & ADI )
|
|
2025-07-08
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-GQ-GREAT-COOLER
|
Repare Focus Camera CCTV south side #3
|
Repare focus camera CCTV at south side 3 ( AGUS & JAJAT )
|
|
2025-07-08
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER5
|
PMR MCC load, UPS ER5 NAR1 & PLC CCR
|
PMR MCC load also UPS ER5 and PLC CCR ( EDI & ADI )
|
|
2025-07-08
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR Service CEMS
|
Clean up purge air unit and filter purge air unit, swivel window T/R & R for dust hunter also flange with tube and alignment dust hunter from dirty of dust, transducer A & transducer B flowsic 100 from dirty of dust, CEMS room gas bottle also CEMS room and filter cabinet MCS 100 E from dirty of dust ( RIZAL & ANDRI )
|
|
2025-07-08
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Fabrication Frame UPS ER3 and 483-FA2
|
Fabrication frame UPS ER3 and 483 FA2 ( ANDRI & DADANG )
|
|
2025-07-08
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-FEED-BIN
|
Tidy up garbage put in garbage tank
|
Take garbage at floor put back in garbage tank from Feed Bin to Raw Mill ( EDI & ADI )
|
|
2025-07-07
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
Install dozing motor
|
Install dozing motor of HRG. Test function result ok ( EDI & JAJAT )
|
|
2025-07-07
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR Analyzer IKGA and PH + Finding leakage at probe 463 2K1
|
Clean up probe-flange-filter sample line-sample line-filter balston-diaphragm pump from dirty of dust. Check humidity sensor and filter sensor result filter still function and normal. Found leakage at probe 463 2K1 observation suspected leakage, replace probe with spare probe, test leakage at work shop result ok, install at site. Test function insert and retract result ok ( RIZAL & EDI & MUHAIMIN & ANDRI & DADANG & ADI )
|
|
2025-07-07
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Fabrication Frame UPS ER3 dan 483-FA2
|
Do fabrication frame of UPS ER3 and 483 FA2 ( EDI & ANDRI & DADANG )
|
|
2025-07-07
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-&-473-GQ1
|
Instal New CCTV R Hydraulic and setting computer for CCTV
|
Take computer at hydraulic room bring to work shop. Setting computer for CCTV great cooler. Install CCTV great cooler ( AGUS & JAJAT )
|
|
2025-07-07
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-&-473-CC1
|
PMR Service Critical Motor & LSR RM&CM1
|
Clean area motor and filter motor. Measure vibration-noise-temperature FS and LS motor. Add AUTO grease at L63 MD1 found empty tank AUTO Grease motor. Add grease from 20 times and 30 times at FS also LS in order make vibration below 4 mm/s and noise below 2 gE ( ADI & MUHAIMIN )
|
|
2025-07-04
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-CC1
|
Prepare CCTV Great Cooler +Install Supporting Camera
|
Install CCTV at great cooler and supporting camera. Setting address for CCTV great cooler result ok ( AGUS & RIZAL & ANDRI )
|
|
2025-07-04
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-FA2-AND-363-MD-1
|
PM RM, Replace CB dan Cleaning Deeply Motor 363-MD1 + FAN Raw Mill
|
Replace carbon brush, do cleaning motor 363 MD1 and filter 363 FA2 also replace belt motor e each do alignment test run motor check ampere result 152 A-149 A-154 A and check vibration vibration horizontal for FS and LS high 3.8 mm/s ( EDI & MUHAIMIN & DADANG & ADI )
|
|
2025-07-04
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3
|
Replace Battery UPS
|
Replace battery UPS ER3 totals18 units. Bring ex battery to waste room of environment ( JAJAT & AGUS & RIZAL & ADI & ANDRI )
|
|
2025-07-03
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-CC1
|
Prepare +Pulling cable LAN CCTV Great Cooler
|
Pulling cable LAN CCTV great cooler from site to hydrolic room ( AGUS & MUHAIMIN & ANDRI & DADANG )
|
|
2025-07-03
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Scanning Data + complete Form WBI dan PMR
|
Complete data form WBI & PMR month of June 2025 do scanning for all data send to Mr.Jajat email ( EDI & ADI )
|
|
2025-07-03
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR service analyzer
|
Clean up flange sample line, filter sample line, sample line, filter balston, diaphragm pump, dryer gas pump from dirty of coal. Check humidity sensor and filter humidity result ok ( EDI & ADI )
|
|
2025-07-02
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
Repare Flapper probe
|
Repare flaper analyzer. Test retract and insert result ok function flapper normal ( RIZAL & ANDRI )
|
|
2025-07-02
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ELECTRICAL-NR2
|
Activation Protection Analyzer PH 7 + CM
|
Calibration zero and span for measurement gas result ok ( JAJAT & EVE IDAM )
|
|
2025-07-02
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-FA2-&-473-FA2
|
Prepare Wiring Instalation Upgrade
|
Do preparing wiring instalation upgrade for 483 FA2 and 473 FA2 ( AGUS )
|
|
2025-07-02
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Fabrication Support Line Grease
|
Fabrication support line grease at work shop result ok ( RIZAL & ANDRI )
|
|
2025-07-02
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Complete Document PMR dan WBI All Area
|
Complete document PMR and WBI. Rewrite for name file of PMR also WBI issue different number from name file install compare actual number file at cupboard reprint and install at cupboard of file ( JAJAT & ADI )
|
|
2025-07-02
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L3C-BC1
|
Observation Modification Motion Detector
|
Observation motion detector, found there is no jumper cable at terminal sensor, do simulation disconnect cable result belt conveyor stop sensor function normal. Check distance probe sensor to media result ok ( MUHAIMIN & DADANG )
|
|
2025-06-26
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FN7-M1-&-M2--AND-MOTOR-AREA-COOLER-ALSO-WORK-SHOP
|
Cleaning motor cooler & tidy up spare part
|
Cleaning Area Cyclone Cooller & Damper 473-FN7 and tidy up spare part at work sop ( JAJAT & IMAN )
|
|
2025-06-26
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Complete form PMR and WBI month of June
|
Complete WBI electrical & instrumentation area feed bin-raw mill-CT-dust transport-bag filter; CM-truck lift-BC transport-tripper-reclaimer coal; top blending-CT-PH-KILN; bottom blending-KILN-CC1-clinker silo ( JAJAT & ADI )
|
|
2025-06-26
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-BF1
|
Replace / repare L63BF1 comp 8 (Info is not working) , Comp 7 leakage
|
Check at local for compartemen 8 and compartemen 7. Jumpered DO result normal. Suspected sequence program problem make compartemen 7 & 8 are not working normal ( RIZAL & ANDRI )
|
|
2025-06-26
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-BL7-&-483-BL9
|
Add Greasing motor
|
Check AUTO grease at 483 BL7 & 483 BL9, found connector for grease plug. Replace 2 connector for motor, install 3 way connector from AUTO grease to motor. Result working normal ( MUHAIMIN & EVE RAIHAN )
|
|
2025-06-26
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
BELT-FEED
|
Replace Lighting lamp 3 units
|
Replace lamp area belt feed 3 units, test on result ok lighting lamp on ( FIRMAN & DADANG )
|
|
2025-06-25
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Complete data check sheet PMR and WBI month of June 2025
|
Complete data check sheet PMR analyzer 423 2K1-463 2K1-443 2K1-L63 2K1-L63 2K2-L63 2K3-483 2K1; PMR camera burner-IR TAD-CCTV-T scanner; PMR hoist crane; PMR service critical motor KILN-RM-CM-CC ( JAJAT & ADI )
|
|
2025-06-25
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
MAIN-GATE-ACCES-CONTROL
|
Inspection electrical and welding tools
|
Inspection electrical tools of PT INDOPORLEN totals 5 units: 3 jack hamer, 1 gunning machine, 1 water pump all tagging green color ( ADI )
|
|
2025-06-24
9 months ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
WORK-SHOP-NR2
|
Assembling motor 454 BL1
|
Assembling motor 454 BL1 issue motor grounded, after service and add insulating spray at rotor motor result ok ( HARIYANTO & MARDIYANTO & ADI & DADANG & CIVACON )
|
|
2025-06-24
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-N2
|
Inspection electrical & welding tools OH NR2
|
Inspection electrical tools of PT Indoporlen totals 2 unit2; PT Mega Volts Perkasa total 1 unit all tagging green color ( TITOK & ADI )
|
|
2025-06-10
9 months ago
|
NR.N2-OH
|
Muhammad Fakhri Kusnan
|
L64-SR1
|
Service dan test RTD L64-SR1.Ti1 (Temperatur Under Bearing Separator)
|
| Service dan test RTD L64-SR1.Ti1 (Temperatur Under Bearing Separator)
|
|
2025-06-10
9 months ago
|
NR.N2-OH
|
Muhammad Fakhri Kusnan
|
L64-RM1-
|
Disconnect dan lepas sensor RTD L64-RM1.Ti8
|
| Disconnect dan lepas sensor RTD L64-RM1.Ti8
|
|
2025-06-10
9 months ago
|
NR.N2-OH
|
Muhammad Fakhri Kusnan
|
L64-RM1-
|
Disconnect dan Relokasi untuk mengamankan Probe Filter Analyzer L64-2K1 dan Saluran Cocair
|
| Disconnect dan Relokasi untuk mengamankan Probe Filter Analyzer L64-2K1 dan Saluran Cocair
|
|
2025-06-10
9 months ago
|
NR.N2-OH
|
Muhammad Fakhri Kusnan
|
EXPLOSION-DOOR-COALMILL ATAS
|
Disconnect Proximity Sensor 2 Ea
|
| Disconnect Proximity Sensor 2 Ea
|
|
2025-06-10
9 months ago
|
NR.N2-OH
|
Muhammad Fakhri Kusnan
|
ER-5-
|
Manuver Power
|
| Manuver Power
|
|
2025-06-09
9 months ago
|
NR.N2-OH
|
Muhammad Fakhri Kusnan
|
L64-FN2.P1
|
Lepas Transmitter
|
Lepas Transmitter
|
|
2025-06-09
9 months ago
|
NR.N2-OH
|
Muhammad Fakhri Kusnan
|
L64-RM1.PT1
|
Lepas Transmitter
|
| Lepas Transmitter
|
|
2025-06-09
9 months ago
|
NR.N2-OH
|
Muhammad Fakhri Kusnan
|
L94-BF1.P1
|
Lepas Transmitter
|
Lepas Transmitter
|
|
2025-06-09
9 months ago
|
NR.N2-OH
|
Muhammad Fakhri Kusnan
|
484-PF1
|
484-PF1 Wrapping All Panel Aerasi
|
| Wrapping All Panel Aerasi
|
|
2025-06-09
9 months ago
|
NR.N2-OH
|
Muhammad Fakhri Kusnan
|
L64-RM1.T5
|
Disconnect, lepas sensor Temperature
|
| Disconnect, lepas sensor Temperature
|
|
2025-06-09
9 months ago
|
NR.N2-OH
|
Muhammad Fakhri Kusnan
|
L64-RM1.T4
|
L64-RM1.T4Disconnect, lepas sensor Temperature
|
Disconnect, lepas sensor Temperature
|
|
2025-06-09
9 months ago
|
NR.N2-OH
|
Muhammad Fakhri Kusnan
|
L64-RM1.T3
|
Disconnect, lepas sensor Temperature
|
| Disconnect, lepas sensor Temperature
|
|
2025-06-09
9 months ago
|
NR.N2-OH
|
Muhammad Fakhri Kusnan
|
454-PF2
|
Bongkar Motor PF , Wrapping Panel
|
Bongkar Motor PF , Wrapping Panel
|
|
2025-06-09
9 months ago
|
NR.N2-OH
|
Muhammad Fakhri Kusnan
|
454-PF1
|
Bongkar Motor PF , Wrapping Panel
|
| Bongkar Motor PF , Wrapping Panel
|
|
2025-06-24
9 months ago
|
NR.N2-OH
|
Muhammad Fakhri Kusnan
|
484-PF1
|
Bongkar Motor PF , Wrapping Panel
|
Bongkar Motor PF , Wrapping Panel
|
|
2025-06-23
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
334-WF2
|
Service dan repair
|
Check speed sensor,beltdrift dan kalibrasi
|
|
2025-06-23
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
334-WF1
|
Service dan repair
|
Repair dudukan speed sensor,check switch belt drift
|
|
2025-06-23
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
424-FN1-T1
|
Service dan repair
|
Replace temp transmitter
|
|
2025-06-23
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-RM1-T4.A
|
Service Repair
|
Connect new transmitter
|
|
2025-06-23
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-ELECTRIC-NR2
|
Completing data check sheet calibration temperature and pressure transmitter OH NR2
|
Completing data for calibration temperature and pressure transmitter OH NR2 ( TITOK & ADI )
|
|
2025-06-21
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
334-BC2
|
Service dan clean up
|
Check safety device
|
|
2025-06-21
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
334-BC1
|
Service dan clean up
|
Check safety device
|
|
2025-06-21
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-RM1
|
New instal
|
Instal temperature transmitter,connect to i/o
|
|
2025-06-21
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
394-DV3
|
Service dan repair
|
Repair actuator macet,test open close dan check indikasi dr I/O
|
|
2025-06-21
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
364-RM1-&-424-FN1
|
Calibration temperature OH NR2
|
Do calibration temperature transmiter area RM total 2 unit 364 SR1 T2-364 RM T1; 364 FN3 T1-364 FN3 T2; 364 FN4 T1-364 FN4 T2; 424 FN1 T1-424 FN1 T2 replace with Endess Hauser-424 FN1 T3 for zero 0 degree celcius and span 150 degree celcius result ok ( MUHIB & ADI & CIVA SUPRIYADI )
|
|
2025-06-20
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
444-CT1
|
Service dan repair
|
Service dan repair solenoid valve
|
|
2025-06-19
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
394-3B1
|
Service dan repair
|
Check dan service sensor level dan sensor ML
|
|
2025-06-20
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
394-BF2
|
Service dan repair
|
Replace timer purging
|
|
2025-06-20
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
394-ASK
|
Service dan repair
|
Replace bray valve
|
|
2025-06-20
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
394-SG4
|
Service dan repair
|
Replace bray valve
|
|
2025-06-20
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
424-FN1
|
Check vibration-noise motor issue high vibration and noise
|
Run local motor EP fan, try run 50% and 80% RPM, measure vibration below 0 mm/s, noise below 1 gE ( HARIYANTO, ADI )
|
|
2025-06-20
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Scanning data check sheet calibration pressure-temperature transmitter-inspection electrical & welding tools OH nr2
|
Do scanning data check sheet calibration pressure-temperature transmitter-inspection electrical & welding tools OH NR2 ( ADI & EVE RAIHAN )
|
|
2025-06-19
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
MAIN-GATE-ACCES-CONTROL
|
Inspection electrical and welding tools
|
Inspection electrical and welding tools of PT Quadro Indonesia 1 unit purification machine, PT Deco Mandiri Sejahtera 1 unit welding machine-2 drilling machine, PT Aqpa Indonesia 3 unit extention cable- 2 unit drilling machine all tagging green color ( ADI & TRUBA SUTRI & EVE RAYHAN )
|
|
2025-06-18
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
MAIN-GATE-ACCES-CONTROL
|
Main gate and plant building inspection electrical and welding tools
|
Inspection electrical and welding tools of PT Deco Mandiri Sejahtera rejected 2 extention cable because not full fill requirement safety no cover and PT Truba Jaga Cita, all tagging green color ( TRUBA SUTRI & TRUBA SUSILO )
|
|
2025-06-18
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
OH-NR2
|
Calibration pressure transmitter area PH-RM-CC
|
Replace pressure transmitter for 446 PH1 PT3 and calibration zero also span result ok ( ADI & EVE RAYHAN )
|
|
2025-06-17
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
MAIN-GATE-ACCES-CONTROL
|
Main gate inspection electrical & welding tools
|
Inspection electrical & welding tools of PT Cahaya Abadi Teknik, PT Bouveri all tagging green color ( TRUBA SUTRI & TRUBA SUSILO )
|
|
2025-06-17
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
OH-NR2
|
Calibration pressure transmitter area PH-RM-CC
|
Calibration pressure transmitter area pre heater-rawmill totals 10 units ( ADI & YOGA )
|
|
2025-06-17
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-RM1
|
Service dan repair
|
Instal TE exit mill,bottom CT dan buat lubang baru TE exit mill(fail)
|
|
2025-06-17
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-RM1
|
Service dan repair
|
Instal pressure tx area Rawmill
|
|
2025-06-17
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
444-FN1
|
Service dan repair
|
Test counterweight dan coil auto balancer
|
|
2025-06-16
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-BE1
|
Servoce dan repair
|
Replace sensor ML
|
|
2025-06-17
9 months ago
|
NR.N2-OH
|
Hendro Supramono
|
4P4-1V1
|
PMR Stop LVMDP ER4 Lt.1
|
cleanup and test function ACB
|
|
2025-06-16
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
MAIN-GATE-ACCES-CONTROL
|
Inspection electrical & welding tools
|
Inspection electrical & welding tools of PTCIVACON total 2 unit electrical tools: extention cable-grinding machine; PT Cahaya Abadi Teknik total 9 units welding tools: 3 unit welding machine-3 cable welding + & 3 unit cable welding - also 7 units electrical tools: 1 portable lamp-3 extention cable-3 grinding machine-1 line boring machine; PT RMP total 1 unit eletrical tools: 1 gunning machine all tagging green color ( ADI & TRUBA SUTRI & TRUBA SUSILO )
|
|
2025-06-14
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
4D4-BF1
|
Service dan repair
|
Service,check dan replace solenoid dan selang purging
|
|
2025-06-14
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
4D4-3S1
|
Service dan repair
|
Service dan repair selang valve actuator Replace flexible conduit Check dan test sensor ML Check dan test level sensor
|
|
2025-06-13
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
443-CT1
|
Service dan repair
|
Service dan repair valve bottom Ct Replace regulator
|
|
2025-06-14
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
423-EP-1
|
Service dan repair
|
Service dan repair safety device ep transport
|
|
2025-06-14
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
MAIN-GATE-ACCES-CONTROL
|
Inspection electical and welding tools
|
Inspection electrical and welding tools of PT AQPA totals 21 units for electrical 20 units and welding 1 units, PT RMP for elecrical 4 units and welding 5 units cable welding ( ADI & TRUBA SUTRI & TRUBA SUSILO )
|
|
2025-06-13
9 months ago
|
NR.SHIFT
|
Peny Prasetyo
|
LA4-VA6
|
project LA4-VA6
|
roject VT calciner N2: check signal di do ai di er4, terminasi instrument di local PH lt 5, check spare motor blower keong di gudang
|
|
2025-06-13
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
PMR service analizer 463 2K1 IKGA
|
PMR analizer IKGA, clean up flange-filter sample line-sample line-diaphragm pump-filter balston from dirty of dust. Check humidity sensor and filter humidity result filter ok ( RIZAL & ANDRI )
|
|
2025-06-13
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
MAIN-GATE-ACCES-CONTROL
|
Inspection electical and welding tools
|
Inspection electrical tools of PT Truba Jaga Cita for 2 blower tagging green color ( ADI & TRUBA SUSISLO)
|
|
2025-06-12
9 months ago
|
NR.SHIFT
|
Peny Prasetyo
|
364-FN3
|
ganti VCB 2
|
pabrikasi support kabel, cover panel, torque terminasi kabel power, test open close vcb, cleanup ruangan vcb2
|
|
2025-06-12
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-LD3
|
Service dan repair
|
Check service dan test open close
|
|
2025-06-12
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-LD2
|
Service dan repair
|
Service,repair dan test damper
|
|
2025-06-12
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-LD1
|
Service dan repair
|
Service repair dan adjust Damper actuator Continue check by mechanic
|
|
2025-06-12
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
433-BE1
|
Activated speed sensor
|
Activated speed sensor result ok ( RIZAL & ANDRI )
|
|
2025-06-12
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L1C-BC7
|
Install AUTO grease pump
|
Install AUTO grease pump ( JAJAT & DADANG )
|
|
2025-06-12
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
MAIN-GATE-ACCES-CONTROL
|
Inspection electrical and welding tools
|
Inspection electrical and welding tools of PT Sentra AnekaTama found 1 extention cable is not safe no cover and welding machine failure also ground cable failure, PT Truba Jaga Cita, PT RMP all tagging green color ( ADI & TRUBA SUTRI & TRUBA SUSILO )
|
|
2025-06-12
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-BC5
|
Check dan service
|
Check service dan test safety device
|
|
2025-06-12
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-BC4
|
Check dan service
|
Check service dan test safety device
|
|
2025-06-12
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-BC3
|
Check dan service
|
Check service dan test safety device
|
|
2025-06-12
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-BC2
|
Check dan service
|
Chwck service dan test safety device
|
|
2025-06-12
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-BC1
|
Check dan service
|
Check service dan test safety device
|
|
2025-06-11
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L3C-RE1-&-L1C-TR1
|
Cleaning Rec dan Tripper Batu bara
|
Cleaning All ( PLC, Drive, MC, Cabin) ( JAJAT & DADAMG )
|
|
2025-06-11
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-OF-PLANT-BUILDING-&-MAIN-GATE
|
Inspection electrical and welding tools
|
Inspection electrical and welding tools of PT Mujur Manggana Megah, Plant building connected cable power portable lamp 10 units also tagging green color, Truba Jaga Cita, all tagging with green color ( ADI & TRUBA SUTRI & TRUBA SUSILO )
|
|
2025-06-11
9 months ago
|
NR.N2-OH
|
Hendro Supramono
|
464-1T1
|
Koneksi dan Terminasi MV kabel
|
Koneksi dan Terminasi MV kabel dengan 3M
|
|
2025-06-10
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
394-BE1
|
Pre check service safety device
|
Precheck safety device
|
|
2025-06-10
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-RM1
|
364 RM 1 T1 T2
|
364 RM1 T1 T2 Replace thermocouple inlet Rawmill 2 eah
|
|
2025-06-10
9 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-BF2
|
364 BF2 service solenoid purging
|
Check purging Repair 1 purging ngowos bersihkan membran
|
|
2025-06-10
9 months ago
|
NR.SHIFT
|
Peny Prasetyo
|
364-FN3
|
ganti VCB 2
|
disconect cable power, bongkar panel LBS & pindahankan ke gudang er4 bawah, pabrikasi support panel VCB2
|
|
2025-06-10
9 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
MECHANICAL-AFR-&-MAIN-GATE
|
Inspection electrical & welding tools
|
Do inspection electrical and welding tools of mechanical AFR also make 1 unsafe electrical tools because not full fill requirement safety and INDOPORLEN, tagging green color ( ADI & TRUBA SUTRI & TRUBA TRI SUSILO )
|
|
2025-06-09
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-BV3
|
Install Motor cooling Back actuator
|
Install Blower to Motor Back actuator ( MUHAIMIN & ANDRI )
|
|
2025-06-09
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WS-PLANT-BUILDING-&-MAIN GATE
|
Inspection electrical & welding tools
|
Inspection electrical and welding tools of plant buildinng also repare extantion cable and grinding machine because cable grounding of make danger note for grinhding machine and extantion cable because are bot safety and failure. Inspection electrical and welding of suplier at main gate, Inspection jack hamer of CIVACON. all tagging green color ( ADI & TRUBA SUTRI & TRUBA TRI )
|
|
2025-06-09
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
PMR Service Analyser IKGA- repare Rel + adjusment Sensor
|
Replace Rel, Cleaning Probe, Calibration Sensor ( RIZAL & ANDRI )
|
|
2025-06-09
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-L63-RM1
|
PMR Service Critical Motor & LSR RM&CM1
|
Clean up motor and filter motor. Measure vibration-noise-temperature FS & LS motor. Add grease 25 times & 30 times for FS & LS motor until vibration below 4 mm/s and noise below 2 gE ( MUHAIMIN & EVE RAYHAN )
|
|
2025-06-09
10 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-BF1
|
Check Purging
|
Check solenoid purging kondisi kerja semua Clean up box panel
|
|
2025-06-09
10 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-BE1
|
Check Motion
|
Check motion detector kondisi visual masih OK
|
|
2025-06-09
10 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
363-RM1
|
Disconnect dan discouple pressure transmitter
|
Disconnect dan discouple All pressure transmitter area Raw Mill
|
|
2025-06-09
10 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-BC3
|
Service dan repair sensor ML
|
Repair box yg lepas Repair cable gland Simulasi sensor result good
|
|
2025-06-09
10 months ago
|
NR.N2-OH
|
Yurizal Rachman
|
364-BC2
|
Check,repair dan simulasi sensor ML
|
Repaire cable gland,repair box mau lepas,simulasi sensor ML result good
|
|
2025-06-07
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP-PLANT-BUILDING
|
Inspection electrical and welding tools
|
Inspection extention cable 9 unit tagging with green color, repare 3 unit extention cable because cable grounded loose also replace male and female connector ( ADI )
|
|
2025-06-07
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
364-RM1-PT-CIVACON
|
Inspection electrical and welding tools
|
Inspection electrical and welding tool, tagging green color ( FIRMAN & DADANG )
|
|
2025-06-07
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
TENT-&-TOILET-OH
|
Install lighting lamp
|
Install lighting lamp for 2 tent and toilet beside work shop nr1, tent OH near work shop mechanic and L63 RM1 ( IMAN & MUHAIMIN & ANDRI & FIRMAN & DADANG )
|
|
2025-06-05
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Check dan complete PMR dan WBI
|
Complete data check sheet PMR analyzer L63 2K1-L63 2K2-L63 2K3-483 2K1-463 2K1-443 2K1-423 2K1; PMR IR TAD-CCTV-T Scanner-Camera Burner for June 1st weeks. For 423 2K1 complete month April & May 2025 ( ADI & EVE IDAM ) & JAJAT )
|
|
2025-06-05
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-FA2
|
Prepare instalation Drive 483-FA2 + Prepare Drawing Diagram + IO needed
|
Prepare drawing diagram and IO needed also instalation drive 483 FA2 ( AGUS & FIRMAN & MUHAIMIN & EVE IQBAL )
|
|
2025-06-05
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR Service Analyser Coal Mill NAR1
|
Clean up flange, sample line, filter sample line, filter balston, diaphragm pump, dryer gas from dirty of coal. Check humidity sensor and filter sensor, result filter ok ( ADI & EVE IDAM )
|
|
2025-06-05
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-RF2
|
Issue often stop because speed switch failure
|
Service sensor speed switch, test function result ok ( RIZAL & ANDRI )
|
|
2025-06-05
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
Issue lighting lamp 6th to north TV off
|
Replace lighting lamp with spare lamp, do test on lighting lamp result ok lamp on ( FIRMAN & DADANG )
|
|
2025-06-05
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3-&-ER4--&-423-BF1
|
PMR Clean Up MCC ER All Area Kiln Nar1, Motor Area 423-BF1
|
Clean up MCC ER3 & ER4 top and bottom floor, filter cabinet, electric room from dirty of dust use brush and vacuum cleaner. Also mop floor top and bottom. Also area motor 423 BF1 ( JAJAT & AIMAN )
|
|
2025-06-03
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR Service Analyser Preheater & IKGA N1
|
Clean up flange, filter sample line, sample line, diaphragm pump, filter balston, dryer gas pump from dirty of dust. Check humidity sensor and inspection filter result filter ok ( AGUS & ANDRI & EVE IQBAL )
|
|
2025-06-03
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-FN1
|
Replace lighting lamp
|
Replace lighting lamp with spare lamp test on result lighting lamp on ( FIRMAN & DADANG )
|
|
2025-06-03
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-&-473-CC1
|
PMR Service Crit Motor & LSR KL & Cooler
|
Clean up motor and filter motor. Measure vibration-noise-temperature FS & LS motor. Add grease 25 times and 30 times for FS & LS make vibration below 4 mm/s, noise below 2 gE ( MUHAIMIN & EVE IDAM )
|
|
2025-06-03
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Complete stop log PMR
|
Complete stop log PMR, scan data for AUDIT API send to Mr. Jajat ( JAJAT & ADI )
|
|
2025-06-02
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Check Portable electric Tools EL01
|
Inspection electrical and welding tools total 29 units tagging blue color ( electrical tools: 25 units, welding tools: 4 units ) ( ADI & EVE IDAM )
|
|
2025-06-02
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR Service CEMS
|
Clean up motor purge air unit and filter purge air-unit swivel window T/R & R of dust hunter, flange with tube dust hunter-alignment dust hunter result ok-transducer A & B flowsic 100-CEMS room-filter cabinet of MCS 100 E-gas room of CEMS from dirty of dust ( RIZAL & ANDRI )
|
|
2025-06-02
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-&-473-CC1
|
PMR Service Critical Motor & LSR Kiln & Cooler 1
|
Clean up motor and filter motor, measure vibration-noise-temperature FS & LS motor. Add grease 20 times and 25 times for FS & LS motor make vibration below 4 mm/s, noise below 2 gE ( MUHAIMIN & EVE IDAM )
|
|
2025-06-02
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-L63-RM1
|
PMR Service Critical Motor & LSR RM & CM1
|
Clean up motor and filter motor, measure vibration-noise-temperature FS & LS motor. Add grease 20 times and 30 times for FS & LS motor make vibration below 4 mm/s, noise below 2 gE ( AGUS & DADANG )
|
|
2025-05-30
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
PMR ampere kiln check cycle how many periode of month at weekly
|
Check sheet result found 3 file: PMS 463 KL1 frequency 120 days, PMR MV motor frequency 120 days, Speed Calibration frequency 1 years ( ADI & EVE IDAM )
|
|
2025-05-30
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-SX1.M1
|
Top up grease
|
Do top up grease of L63 SX1 M1. Measure vibration-noise FS & LS result normal
|
|
2025-05-30
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
-L63-LQ1.M1
|
Top up grease
|
Do top up grease of L63 LQ1 M1. Measure vibration-noise FS & LS result normal ( MUHAIMIN & FIRMAN & DADANG )
|
|
2025-05-30
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L3A-BC1
|
Repair sensor ML
|
Check at local, found propeller sensor broken, service propeller at work shop. Install sensor ML at local test function result ok ( RIZAL & ANDRI & EVE IQBAL )
|
|
2025-05-30
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR Service Analyser Coal Mill NAR1
|
Clean up flange, sample line, filter sample, diaphragm pump, filter balston, dryer gas pump from dirty of coal. Check humidity sensor and filter humidity sensor, result filter ok ( ADI & EVE IDAM )
|
|
2025-05-30
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER4
|
Specification PMR MCC load ,Check I/O&UPS ER4 NAR1
|
Check temperature and ampere for trafo cable at ER4 result ok. Put spare battery UPS 20 each at ER4 ( FIRMAN & MUHAIMIN & DADANG )
|
|
2025-05-28
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Fabrication cover for battery
|
Do fabrication cover battery ( FIRMAN & DADANG )
|
|
2025-05-28
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Complete Data, All Doc PMR, WBI, Data API Foto Copy PDF Adi, ZT, EVE Idam, Farchan
|
Complete data PMR & WBI for month 2025 from January until May 2025 continue scan all data send to Mr.Jajat email. Complete data check clean up MCC ER3-ER4-ER5-ER6 from december 2024 until may 2025 ( ADI & JAJAT & FARCHAN & EVE IDAM )
|
|
2025-05-28
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
WBI Elect & Ins & Check I/O CM,Sump T&T
|
Do WBI Elect & Ins & Check I/O CM,Sump T&T. Measure vibration-noise-temperature FS & LS motor. Write not normal vibration and noise motor ( RIZAL & ANDRI & EVE IQBAL )
|
|
2025-05-28
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1-&-443-2K1
|
PMR Service Analyser Preheater & IKGA N1
|
Clean up flange, probe, filter probe, sample line, diaphragm pump, filter baltson, dryer gas pump from dirty of dust. Check filter humidity sensor, result filter ok ( RIZAL & ANDRI & EVE IQBAL )
|
|
2025-05-27
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CCR
|
NAR 2 Install / Reconnect Operator NAR2 Section Kiln Area
|
Prepare ALL connection LAN (PC-CCTV,APC) , Pulling cable Radio, Prepare PC Unit, Cleaning Filter Server , dismantling table + accessories ex NAR 2 ( AGUS & JAJAT & ADI & FIRMAN & MUHAIMIN & ANDRI & DADANG & EVE IDAM & EVE IQBAL )
|
|
2025-05-27
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Complete data check sheet PMR & WBI month of may 2025
|
Complete data for preparing AUDIT API ( JAJAT & ADI )
|
|
2025-05-27
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
CCTV WS off
|
Still observation, test Signal Ok, confirm IT ( AGUS & ADI & DADANG )
|
|
2025-05-27
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-&-473-CC1
|
PMR Service Critical Motor & LSR KL & Cooler
|
Clean up area motor and filter motor. Measure vibration-noise-temperature free side and load side motor. Add grease 10 times for FS & LS until vibration & noise normal ( MUHAIMIN & EVE IQBAL & EVE IDAM )
|
|
2025-05-27
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-2K1
|
PMR Service CEMS
|
Clean up motor and filter purge air unit, swivel window T/R & R dust hunter, and flange with tube dust hunter, alignment dust hunter, transducer A &B flowsic 100, CEMS room and filter cabinet MCS 100 E also gas bottle room from dirty of dust ( FIRMAN & ANDRI )
|
|
2025-05-26
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CCR
|
NAR 2 Install / Reconnect Operator NAR2
|
Do install and reconnect cable power for Operator Nr2 at CCR ( JAJAT & AGUS & RIZAL & ANDRI & FIRMAN & MUHAIMIN & ADI & DADANG )
|
|
2025-05-26
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Make notification WBI electric and instrumentation bottom blending-cooler-clinker silo
|
Make notification for WBI electric and instrumentation bottom blending-cooler-clinker silo ( ADI & EVE IDAM )
|
|
2025-05-26
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
TPM complete Data Dashboard
|
Complete data dash board TPM L63 FN1 & L63 IP1. Print out at put at dash board work shop. Make safety file TPM also print out and put at dash board TPM work shop ( ADI & EVE IQBAL )
|
|
2025-05-26
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-CT1
|
Install Indication Flow Meter
|
Install indication flow meter, result ok ( RIZAL & ANDRI )
|
|
2025-05-26
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-L63-RM1
|
PMR Service Critical Motor & LSR RM&CM1
|
Clean up area motor and filter motor. Measure vibration-noise-temperature motor free and load side. Add grease 20 times-30 times for FS & LS. Replace 3 unit carbon brush at 363 MD1 because actual long are short information from Mr.Najib CBM (MUHAIMIN & EVE IDAM )
|
|
2025-05-23
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FN4
|
Repare Power Greasing
|
Make reparing power greasing 473 FN4, replace power supply input 110-220 VAC and output 24 VDC, test function AUTO Grease motor result ok ( MUHAIMIN & DADANG )
|
|
2025-05-23
10 months ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
443-CT1
|
Flow meter value is not indication at CCR
|
Found card error at control flow meter advise need to replace ( MUHAIMIN & DADANG )
|
|
2025-05-23
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
453-PF1
|
Repare Solenoid Purging system
|
Install Water trap and Regulator ( RIZAL & ANDRI )
|
|
2025-05-23
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
413-3B1-&-413-3B2-&-473-CC1-&-493-3B1
|
WBI Elec & Ins & Check I/O & S Pump Blending , Cooler, Clinker Silo
|
Do WBI area bottom blending-cooler-clinker silo. Measure vibration-noise-temperature FS & LS motor, write unnormal condition ( JAJAT & ADI )
|
|
2025-05-23
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-BF1.-T1-AND-T2
|
Issue indication temperature low at CCR
|
Repare connection at sensor, result indication temperature normal ( RIZAL & ANDRI )
|
|
2025-05-22
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1-SUMP-PUMP
|
Fix for Power Sump Pump Coal Mill HS
|
Make fix connection power supply coal mill at HS room ( MUHAIMIN )
|
|
2025-05-22
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FN4
|
Issue AUTO grease is not working
|
Check at location found there is no power for AUTO grease motor. Replace power supply 220 VAC to 24 VDC, test function result ok ( MUHAIMIN )
|
|
2025-05-22
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-FA5-TEMPARATURE-FS
|
Issue indication temperature abnormal
|
Clean up sensor and tighten cable because found untighten cable sensor, result indication temperature back to normal ( RIZAL & ANDRI )
|
|
2025-05-22
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1-T1
|
Issue indication temperature abnormal
|
Check at site, found cable at sensor is not tight, tighten cable sensor result indication temperature normal ( RIZAL & ANDRI )
|
|
2025-05-22
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-FN1
|
Support testing AUTO Balancer
|
Do support testing AUTO Balancer ( AGUS & FIRMAN & JAJAT )
|
|
2025-05-22
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER4
|
Observation replace battery UPS ER-04 2402 need replace 6 unit
|
Replace battery UPS ER-04 2402 6 unit ( AGUS & FIRMAN & DADANG )
|
|
2025-05-22
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
HRG
|
Cleaning area HRG and install level imodification
|
Cleaning area HRG inside and outside room, filter at outside HRG room, PLC HRG from dirty of dust use instrument air supply and hand blower. Install level modification at WTP of HRG test indication al PLC already appear ( RIZAL & ADI & MUHAIMIN & ANDRI & DADANG & JAJAT )
|
|
2025-05-21
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing data check sheet WBI month of may 2025
|
Do completing data sheet WBI month of may 2025 ( ADI )
|
|
2025-05-21
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
Install control sump pump
|
Install control sump pump. test function result ok ( FIRMAN & DADANG )
|
|
2025-05-21
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-HC1-
|
Check Hoist Crane RM
|
Check hoist crane at raw mill, adjust brake test function ok clean up area motor, rail continue test function motor move south-north-up and down result ok ( AGUS & FIRMAN & DADANG )
|
|
2025-05-21
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-WF1
|
Issue replace belt
|
Check sensor BD, test indication at CCR. Do calibration zero and span result ok ( RIZAL & MUHAIMIN & ANDRI )
|
|
2025-05-21
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-BF1
|
Modification temperature sensor for T1 and T2
|
Modification temperature T1 and T2. Replace temperature transmitter 2 each result indication temperature normal at CCR ( RIZAL & ANDRI & MUHAIMIN )
|
|
2025-05-21
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1
|
Re check and tidy up lighting lamp 8th floor
|
Re check lighting lamp at pre heater 8th floor connect cable short at panel, test function result ok ( FIRMAN & DADANG )
|
|
2025-05-21
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
413-3B1-&-413-3B2-&-473-CC1
|
Cleaning up panel I/O area blending & cooler
|
Clean up I/O panel area blending-cooler-water spray kiln from dirty of dust use rag and hand blower ( JAJAT & ADI & EVE ANDRE )
|
|
2025-05-21
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-FN1
|
Support Auto Balancer ,install sensor
|
Support AUTO Balancer. Install sensor ( AGUS & FIRMAN & DADANG )
|
|
2025-05-20
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CCR
|
Pulling cable AC server room to CCR
|
Pulling cable power AC server room to CCR ( AGUS & FIRMAN & MUHAIMIN )
|
|
2025-05-20
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SCB
|
Connected cable power motor and test run
|
Do connected cable power motor and test run result ok ( AGUS & FIRMAN & MUHAIMIN )
|
|
2025-05-20
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
393-SC6
|
Repaire propeller motion because broken
|
Repaire propeller motion at motor. Result ok ( AGUS & FIRMAN & MUHAIMIN )
|
|
2025-05-20
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-2K1
|
Activation Re-track probe
|
Do activation re-track for analyzer IKGA. Test re-track and insert probe result ok ( RIZAL & ADI & ANDRI & DADANG )
|
|
2025-05-20
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-IP1
|
Activation indication Low Temp CO2 liquid (DI- Pulling cable to Room Hydraulic)
|
Pulling cable digital input for indication low temperature heater CO2 liquid from control to I/O panel L63 HS1 continue connected cable white and brown. Test signal from heater control to I/O panel result ok blinking ( RIZAL & ADI & ANDRI & DADANG )
|
|
2025-05-20
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-FA2
|
Support Instalation motor and alignment
|
Do support alignment motor from CBM. Install AUTO grease motor. Measure data vibration 2 mm/s, noise 1 gE after alignment from CBM ( AGUS & FIRMAN & MUHAIMIN )
|
|
2025-05-20
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-FN1
|
Support Instalation Auto Balancer
|
Do support instalation AUTO Balancer, found existing AUTO Balancer is bad condition suspected because fire case when kiln just start up and motor 443 FN1 is not starting full, when existing AUTO Balancer bring to work shop and measure resistance 9.5 ohm ( AGUS & FIRMAN & MUHAIMIN )
|
|
2025-05-19
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Make data Kiln-RM-CM for shut down-off-PM 2025
|
Do make data for KILN-RM-CM shut down-idle-PM-off save at D: as Data Kiln-RM-CM shut down-idle-PM-off 2025 ( JAJAT, ADI )
|
|
2025-05-19
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Inspection electrical & welding tools of PT CIVACON
|
Inspection electrical and welding tools, tagging with green color ( ADI, DADANG )
|
|
2025-05-19
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-IP1
|
CO2 system install heater temperature
|
Measure distance cable for analog input and digital input from heater control to I/O pnel L63 HS1 needed cable 30 meter ( JAJAT, ADI )
|
|
2025-05-19
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
473-CC1
|
Cleaning Motor cooller Fan
|
Do cleaning motor area cooler from dirty of dust ( JAJAT, ADI, DADANG )
|
|
2025-05-19
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-FN1
|
Finishing area motor
|
Continue painting area TPM L63 FN1 ( DADANG )
|
|
2025-05-19
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Create Permit Replace Auto Balancer 443-FN1
|
Do create permit job replace AUTO Balancer ( ADI, EVE IQBAL )
|
|
2025-05-19
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-AC1
|
Issue there is jumper cable of roof switch
|
service stick of roof switch, remove jumper cable at I/O panel after normal condition ( RIZAL, ANDRI, EVE IQBAL )
|
|
2025-05-19
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-FA2
|
Observation data motor for base-frame-high shaft-diameter shaft
|
Do observation data base-frame-high shaft also diameter shaft, dismantle motor bring to work shop replace bearing motor 6217-C3 ( AGUS, FIRMAN, MUHAIMIN )
|
|
2025-05-16
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
413-3B1-&-3B2
|
Cross check level blending
|
Cross check indication level with production team compare with indication level at local result same ( RIZAL & ANDRI )
|
|
2025-05-16
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Observation Auto Balancer, Check coil winding
|
Do observation Auto Balancer. Check coil winding ( AGUS & FIRMAN & DADANG )
|
|
2025-05-16
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
TPM-L63-FN1 & L63 IP1
|
Completing data AM and data dash board and sign safety for CO2 systems.
|
Print out also laminating and install at dash board work shop for AM and for data TMP at dash board local and at tank of CO2 Systems for sign safety ( ADI & EVE IQBAL)
|
|
2025-05-16
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-FN1-&-L63-IP1
|
TPM area id CM and CO2 system
|
Clean up area motor use instrument air supply, also equipment cleaning for stair, plat form, cable tray. tank of CO2 system. Re painting yellow color for wall of foundation motor, grey for stair and iron around base foundation motor and fence of CO2 system ( JAJAT & AGUS & RIZAL & ADI & EVE IQBAL & FIRMAN & MUHAIMIN & ANDRI & AIMAN & DADANG )
|
|
2025-05-15
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-FA2
|
Issue high vibration and noise, add grease Mitigation WBI CBM Finding Add Greasing
|
Add grease motor 10 times-25 times & 30 times result not good still high vibration up 4 mm/s & noise up 2 gE ( MUHAIMIN & EVE IQBAL )
|
|
2025-05-15
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Completing check sheet PMR month of May
|
Completing data check sheet PMR analyser and PMR IR TAD-T scanner-CCTV-Camera Burner for 2nd weeks ( JAJAT & ADI )
|
|
2025-05-15
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Observation Auto Balancer
|
Do clean up AUTO Balancer at work shop ( AGUS & FIRMAN & MUHAIMIN )
|
|
2025-05-15
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-RM1
|
PMR Service Analyser Coal Mill NAR1
|
Clean up flange, sample line, dryer gas pump, filter sample line, diaphragm pump, filter balston, humidity sensor from dirty of coal. Check filter humidity sensor result still ok no need replace filter ( RIZAL & ANDRI )
|
|
2025-05-15
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3-&-ER4-
|
PMR Clean Up MCC ER All Area Kiln Nar1
|
Clean up MCC ER3 & ER4, filter cabinet, also electric room top and bottom from dirty of dust use brush and vacuum cleaner ( AIMAN )
|
|
2025-05-15
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
443-PH1-463-KL1-BURNER-FLOOR
|
PMR Service temperature IR TAD-CCTV-T scanner & pyrometer NAR1
|
Clean up lens of CCTV-IR TAD-T scanner-Camera burner from dirty of dust. Note value IR TAD show 946 degree celcius after clean up ( ADI & EVE IQBAL )
|
|
2025-05-15
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-LQ1-ROOM
|
Replace lighting lamp
|
Replace lighting lamp, test on result lamp on ( FIRMAN & DADANG )
|
|
2025-05-13
10 months ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
423-BF1-PDT-2001
|
Issue indication pressure low (1.4 mbar)
|
Cleaning Line ( east side Blocking), Done , result indication pressure 10,8 mbar ( AGUS & FIRMAN & MUHAIMIN & EVE IQBAL )
|
|
2025-05-14
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-RM1-&-L63-RM1
|
PMR Service Critical Motor & LSR RM & CM1
|
Clean up area motor and filter motor. Measure vibration-noise-temperature FS and LS. Add grease 15 times-20 times & 30 times for FS & LS. Write ampere and voltage motor at ER3 & ER4 for actual motor ( MUHAIMIN & EVE IQBAL )
|
|
2025-05-14
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
483-BL9-& 483 BL2 & L63 MD1
|
Mitigation WBI CBM Finding Add Greasing
|
Add grease around 10 times until 25 times until vibration below 4 mm/s motor issue high vibration ( MUHAIMIN & EVE IQBAL )
|
|
2025-05-14
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CCR
|
Finishing / Instalation support server rack mounts
|
Installing rack mount server at CCR ( DADANG & FIRMAN )
|
|
2025-05-14
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Observation Auto Balancer
|
Clean up AUTO Balancer at work shop (AGUS & FRIMAN )
|
|
2025-05-14
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Do Form /Calibration Speed /Critical Motor Cooller
|
Make form calibration speed and damper at work shop continue print out. Completing data check sheet form calibration speed and damper for year 2025 ( JAJAT & ADI )
|
|
2025-05-14
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
L63-SR1.P2
|
Issue indication pressure low at CCR, Relocation pressure Transmiter (Replace Pressure Transmiter)
|
Replace pressure transmitter and relocation pressure transmitter result indication pressure normal at CCR ( RIZAL & ANDRI & EVE ANDRE )
|
|
2025-05-13
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
423-BF1.-T1-AND-T2
|
Cross Check temperature T1 & T2
|
Cross check indication temperature T1 & T2 compare with CCR reading result ok ( AGUS & FIRMAN & MUHAIMIN )
|
|
2025-05-13
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CCR
|
Observation support server rack mounts
|
Make support server rack mounts at work shop ( ANDRI & DADANG )
|
|
2025-05-13
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
463-KL1-&-473-CC1
|
PMR Service Crit Motor & LSR KL & Cooler
|
Clean area motor and filter motor. Measure vibration-noise-temperature FS and LS. Add grease 10 times for FS and LS and write data ampere-voltage actual motor at ER5 & ER4. Replace AUTO grease motor at 473 FA3 ( MUHAIMIN & ADI & EVE IQBAL )
|
|
2025-05-13
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
363-LQ1.T2
|
Issue value often error make raw mill off
|
Replace sensor temperature with spare unit becuase suspected original sensor temperature not long enough, result different temperature only 8 degree celcius ( AGUS & FIRMAN )
|
|
2025-05-13
10 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER3
|
PMR Service Clean up MCC ER3 NAR1
|
Clean up MCC of ER3, filter cabinet also electric room top and bottom from dirty of dust use brush and vacuum cleaner ( AIMAN )
|
|
2025-05-09
11 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
ER5-&-ER6
|
PMR Clean Up MCC ER All Area Kiln Nar1
|
Clean up MCC ER 5 top also bottom floor & ER6, filter cabinet from dirty of dust use brush and vacuum cleaner ( AIMAN )
|
|
2025-05-09
11 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
CCR
|
New Operator NAR 2 ( Install lamp Server , Install Power , dismantling Power +Install LAN)
|
Install lamp server and power of lamp server, dismantling power and installation LAN cable ( AGUS & FIRMAN & DADANG & MUHAIMIN & JAJAT & RIZAL & ADI & ANDRI & EVE IQBAL )
|
|
2025-05-09
11 months ago
|
NR.SHIFT
|
Wahyu Adi Triono
|
463-2K1
|
Connect cable job final task EVE + Activation Emergency retract (simulation dan test)
|
Connect cable for final task and activation emergency retract ( do simulation and test result ok ) ( EVE RIQBAL & RIZAL & ANDRI )
|
|
2025-05-09
11 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
WORK-SHOP
|
Tidy Up data vs realisation ( API Audit)
|
Completing check sheet PMR and WBI for 2025 until May 2nd weeks, also take sign for every form. Replace data 423 2K1 PMR service because wrong form refill check sheet and take sign. Print out original form for PMR analyzer and WBI hoist crane ( JAJAT & ADI )
|
|
2025-05-09
11 months ago
|
NR.EL-01
|
Wahyu Adi Triono
|
493-AC2
|
Check indication R1
|
Do cross check signal R1 from local to CCR result ok ( MUHAIMIN )
|