Detail NR1 ELEC/INST RM/KL/CM
2025-10-27
463-2K1
Wahyu Adi Triono
Problem: fabrication and installation rel also rooler
Action:
Fabrication for installation rel rooler 463 2K1Installation at local, test run insert probe and retract probe flange result normall ( JAJAT, AGUS, RIZAL, ANDRI, DADANG, MUHAIMIN )

Status: done
Back to report list