Detail NR1 ELEC/INST RM/KL/CM
2026-05-26
443-PH1
Wahyu Adi Triono
Problem: Cross Check temperature Cyclone 4 north and south (Gas Material)
Action:
Cross check indication temperature at cyclone north and south for gas material compare with CCR. Adjust range at local same with indication at local ( RIZAL & ANDRI )

Status: done
Back to report list