Detail NR1 ELEC/INST RM/KL/CM
2026-07-03
423-BF1
Wahyu Adi Triono
Problem: Calibration pressure transmitter and install calibration pressure
Action:
Do make addressing-unit-range of pressure transmitter. Calibration zero and span result good. Install pressure transmitter at site and cross check reading pressure at CCR result normal reading ( RIZAL & ADI & ANDRI & EVE ABY & EVE ELGI & AZRIEL UNJ )

Status: done
Back to report list