433-FM2
Wahyu Adi TrionoProblem: Repare or fabrication way of load cell
Action:
Check at location found cable load cell out position not neat. Dismantle cable load cell, install conduit cable tighten use cable tie and protect hole use silicone ( RIZAL & ED I& ADI & EVE FADHILAH )
Status: done
Back to report list