LA3-VA1
Wahyu Adi TrionoProblem: Install and fabrication vessel air tank
Action:
Do fabrication vessel air tank at workshop and install vessel tank of air and s/v water drain at vessel air tank and pulling cable power from welding panel test function water drain result good ( RIZAL & ANDRI )
Status: done
Back to report list