Detail NR1 ELEC/INST RM/KL/CM
2026-05-23
LA3-VA1
Wahyu Adi Triono
Problem: Install and fabrication vessel air tank
Action:
Do fabrication vessel air tank at workshop  and install vessel tank of air and  s/v water drain at vessel air tank and pulling cable power from welding panel test function water drain result good ( RIZAL & ANDRI )

Status: done
Back to report list