Detail NR ELECTRIC/INSTRUMENT SHIFT
2026-03-12
473-FA9
Wahyu Adi Triono
Problem: Issue value draft abnormal
Action:
 Replace pressure transmitter  and setting parameter 130 mmH2O result indication draft back to normal at CCR operator. Fabrication support of pressure transmitter. Note  Beck actuator function normal but at blade mechanical not response  (RIZAL & EVE CINDA & ANDRI )

Status: done
Back to report list