W83-WF1-
Wahyu Adi TrionoProblem: Fabrication cable power and LCS
Action:
Pulling cable Control to IO -LCS (6P x 1,5 mmx 4), Pulling cable control Power, fabrication and install Control Panel, Prepare connecting Control Side and IO side , fabrication and install Ladder cable and LCS panel ( JAJAT & AGUS & EDI & ADI & MUHAIMIN & DADANG )
Status: done
Back to report list