Detail NR1 ELEC/INST RM/KL/CM
2025-09-29
463-KL1-AND-BURNER-FLOOR
Wahyu Adi Triono
Problem: Continue relocation welding point and prepare cable connection burner point and Kiln
Action:
 Pulling cable and make connection at end side point ( MUHAIMIN & ANDRI & DADANG )

Status: done
Back to report list