Detail NR1 ELEC/INST RM/KL/CM
2026-03-12
363-MD1
Wahyu Adi Triono
Problem: Continue Power point at 363-MD1 ( Pulling cable and fabrication cable route )
Action:
Install pipe 2 inch for cable route from h-beam raw mill. Puling cable from welding cyclone raw mill to location power point at 363 MD1 also connected cable ( EDI & ADI & DADANG )

Status: done