L1C-TR1
Wahyu Adi TrionoProblem: Fabrication welding point area truck lift
Action:
Take cable no item 305122055 around 30 meter. Pulling cable power of welding panel at L1C BC1 room to top floor. Prepare pipe conduit around 5 meter and claim pipe at workshop bring to site ( EDI & RIZAL & ADI & ANDRI )
Status: done
Back to report list