Detail NR1 ELEC/INST RM/KL/CM
2026-04-10
ER6
Wahyu Adi Triono
Problem: Fabrication cable ladder and cover tunnel ER6
Action:
Do  continue fabrication cable ladder of ER6 and cover tunnel. Install cable ladder and cover tunnel at ER6 ( MUHAIMIN & ANDRI & DADANG )

Status: done
Back to report list