Detail NR1 ELEC/INST RM/KL/CM
2026-03-02
393-SC8
Wahyu Adi Triono
Problem: Prepare and install indication ampere
Action:
Do prepare CT at workshop 50/5A, and wiring cable for CT at workshop and install CT 50/5A at ER3 for 383  SC8 and wiring cable output at panel I/O at ER3 result indication ampere normal ( JAJAT % EDI & ADI & DADANG )

Status: done
Back to report list