Detail NR1 ELEC/INST RM/KL/CM
2025-11-20
L1C-TL1
Wahyu Adi Triono
Problem: Trucklift PM ( repair support for LCS BC1-3, observation safety device BD-ML, relocation cable BD of tripper )
Action:
Repaire Rel LCS BC1-3, Dismantling  unuse cable, install and fabrication new lighting lamp, repaire / replace solenoid water L1-BC5. repaire  pull core at TR1, observation installation LAN at L1C TL1 ( JAJAT & AGUS & RIZAL & EDI &  ANDRI & MUHAIMIN & DADANG )

Status: done
Back to report list