Detail NR1 ELEC/INST RM/KL/CM
2025-08-27
ER6
Wahyu Adi Triono
Problem: Continue Project L1C-TR1
Action:
Do wiring cable I/O at ER6, check signal from local to I/O result ok ( JAJAT, EDI, RIZAL, ADI, MUHAIMIN, ANDRI, DADANG )

Status: done
Back to report list