Detail NR1 ELEC/INST RM/KL/CM
2026-01-19
ER3-&-MAIN-GATE
Wahyu Adi Triono
Problem: Inspection electrical and welding tools of PT Civacon and PT RMP
Action:
Inspection electrical and welding tools of PT CIVACON at ER3. Repare extention cable because for ground cable connected failure for stop contact and welding machine because cable power is not safe at outside welding machine. Inspection electrical and welding tools of PT RMP at main gate. Tagging equipment with red color. Note there are some equipment electrical tools not safe because grounding cable failure ( EDI & ADI )

Status: done
Back to report list