All Electrical and Instruments Reports
Date Group Name Equipment Title Action
2026-10-12
2 hours ago
NR.EL-01 Wahyu Adi Triono 463-FX19-M1 Issue motor not working
Make rewiring cable male and female for cable 463 FX M19 test function motor result working normal note tidy up cable power of shell cooling tires ( AGUS & ADI )
2026-10-12
4 hours ago
NR.EL-01 Wahyu Adi Triono 443-Z4B-T1-&-443-PR1-T1 Repare sensor temperature Preheater + Clean UP TAD
Do repare sensor temperature 443 Z4B T1 found cable short at temperature transmitter service cable also cross check temperature compare reading local at CCR result different 5 degree celsius to 7 degree celsius. Clean up temperature IR TAD for flange probe ad lens of sensor result reading temperature normal ( RIZAL & ANDRI )
2026-10-12
6 hours ago
NR.EL-01 Wahyu Adi Triono L63-RM1-&-473-CC1-&-463-KL1 PMR critical motor CM & CC & KL
Clean up area motor and filter motor. Measure vibration-noise-temperature of FS and LS. Add grease motor 25 times and 30 times of FS and LS to make vibration below 4 mm/s and noise below 2 gE. Check at ER4 and ER5 for RPM-KW-Voltage-Ampere-Temperature and write at data check sheet ( MUHAIMIN & DADANG )
2026-10-12
6 hours ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-443-PH1 PMR critical motor RM & PH
Clean up area motor and filter motor. Measure vibration-noise-temperature of FS and LS. Add grease motor 15 times and 25 times of FS and LS to make vibration below 4 mm/s and noise below 2 gE. Check at ER4 and ER3 for RPM-KW-Voltage-Ampere-Temperature and write at data check sheet note fan of south side 443 FN1 not working make notification ( AGUS & ADI )
2026-10-09
3 days ago
NR.EL-01 Wahyu Adi Triono 463-2K1 Replace Breaker + Test Signal Upgrade IKGA+ activation signal pressure
Replace breaker and do test signal of upgrade analyzer 463 2K1 also activation signal pressure result good ( AGUS & MUHAIMIN & DADANG )
2026-10-09
3 days ago
NR.EL-01 Wahyu Adi Triono L63-RM1 PMR service analyzer
Do clean up flange probe-sample line-filter sample line-diaphragm pump-filter balston from dirty of dust coal use instrument air supply also water for filter sample line. Check humidity sensor and replace humidity result function humidity sensor good also filter humidity good condition ( RIZAL & ANDRI )
2026-10-09
3 days ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Report Completly PMR and WBI (Sep-Okt 2026), create SOT , TO October 2026
Do complete data check sheet PMR analyzer L63 2K1-L63 2k2-L63 2K3-483 2K1-463 2K1-443 2K1-423 2K1 for 1st week of October 2026; PMR critical motor area CM-CC-KL-RM-PH for 1st weeks of October 2026. Create SOT for October 2026 ( JAJAT & ADI & EDI )
2026-10-08
4 days ago
NR.EL-01 Wahyu Adi Triono 423-2K1 PMR service CEMS
Do clean up purge air unit and filter motor of dust hunter and flowsic.-swivel window T/R also R-flange with tube of T/R from dirty of dust use instrument air supply also equipment cleaning tools & R unit alignment T/r also R unit result ok-transducer probe A also transducer B from dirty of dust use instrument air supply also equipment cleaning tools-CEMS room also filter cabinet MCS 100 E-gas CEMS room from dirty of dust use equipment cleaning tools and instrument air supply ( RIZAL & ANDRI )
2026-10-08
4 days ago
NR.EL-01 Wahyu Adi Triono 443-EL1-&-WBI-SUMP-PUMP PMR Serv. Elevator PH NAR1 & WBI Sump pump El + activation temperature control 8th floor
Do WBI sump pump electrical at room L63 HS1-IDO tank-L1C BC1-L1BC4 test function sump pump result working normal note there is no permanent way for water sump pump room L63 HS1. Do PMR service 443 EL1-clean up room of elevator also outside room every floor from 1st to 8th floor-clean up top elevator room-service sensor 1sr floor to 8th floor. Activation temperature control of 8th floor elevator control test function result ok ( AGUS & ADI & MUHAIMIN & DADANG )
2026-10-07
5 days ago
NR.EL-01 Wahyu Adi Triono 463-2K1 Replace Breaker + Test Signal Upgrade IKGA
Do replace breaker and test signal of upgrade IKGA result normal working ( AGUS & MUHAIMIN )
2026-10-07
5 days ago
NR.EL-01 Wahyu Adi Triono L63-BF1 Issue compartment 6 & compartment 7 are not working
Service solenoid valve compartment 6 & compartment 7 from dirty of dust coal test function result normal working ( RIZAL & ANDRI )
2026-10-07
5 days ago
NR.EL-01 Wahyu Adi Triono 473-CC1 Prepare observation lighting lamp at street cooler
Do installing lighting lamp to street cooler at HRG room back side and IDO room west side also pulling cable power of lighting lamp test function result good ( JAJAT & EDI & ADI & DADANG )
2026-10-06
6 days ago
NR.EL-01 Wahyu Adi Triono 443-EL1 Repare partition lift control-install partition of door-cover of hole-install temperature sensor
Do install plywood board for cover wall elevator control at 8th floor and repainting grey color also cover hole at elevator control mote take 2 plywood board ( JAJAT & AGUS & EDI & RIZAL & ADI & IMAN & ANDRI & DADANG & MUHAIMIN )
2026-10-05
1 week ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Continue fabrication door of room control elevator
Do fabrication door of room control elevator at workshop ( ANDRI & DADANG )
2026-10-05
1 week ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-443-PH1 PMR service critical motor LSR RM-PH
Do clean up area motor and filter motor. Measure vibration-noise-temperature of FS and LS motor. Add grease motor for 15 times and 20 times for FS and LS motor make vibration below 4 mm/s and noise below 2 gE. Check at ER3 and ER4 for RPM-Voltage-Ampere-KW-Temperature put at data check sheet also clean up filter 363 FA2 note filter at west side 1 side bad condition ( EDI & ADI )
2026-10-05
1 week ago
NR.EL-01 Wahyu Adi Triono L63-RM1-&-473-CC1-&-463-KL1 PMR Service Crit Motor & LSR KL & Cooler
Do clean up area motor and filter motor. Measure vibration-noise-temperature of FS and LS motor. Add grease motor for 25 times and 30 times for FS and LS motor make vibration below 4 mm/s and noise below 2 gE. Check at ER4 and ER5 for RPM-Voltage-Ampere-KW-Temperature put at data check sheet ( AGUS & MUHAIMIN )
2026-10-05
1 week ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-2K1 PMR service analyzer & replace or repare support proximity of IKGA
Clean up flange probe-probe-filter sample line-sample line tube-diaphragm pump-filter balston from dirty of dust use instrument air supply and water. Check function for humidity sensor and filter humidity result function humidity sensor good and filter humidity fine. Repare support proximity of IKGA result good ( RIZAL & ANDRI & DADANG )
2026-10-02
1 week ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Complete report PMR and WBI September 2026
Do complete data check sheet PMR analyzer L63 2K1-L63 2K2-L63 2K3-483 2K1-463 2K1-443 2K1-423 2K1; PMR Temperature  IR TAD-T scanner-CCTV-Camera burner month august-september 2026 ( JAJAT & ADI )
2026-10-02
1 week ago
NR.EL-01 Wahyu Adi Triono 393-SCA-M1 Connect motor
Do connect motor 393 SCA M1 test function motor result good  ( JAJAT & AGUS & EDI & RIZAL & MUHAIMIN & ANDRI & DADANG )
2026-10-02
1 week ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Continue fabrication welding point
Fabrication welding point at workshop result ok ( AGUS & MUHAIMIN )
2026-10-01
1 week ago
NR.EL-01 Wahyu Adi Triono 423-FN1-&-393-SCA-M1 Issue temperature trafo high temperature & issue motor burn
Install indication ready for trafo also pulling cable to I/O panel test function result good ( JAJAT & RIZAL & EDI & ANDRI & MUHAIMIN& DADANG )
2026-10-02
1 week ago
NR.EL-01 Wahyu Adi Triono PT-PINCURAN-MAS Inspection electrical and welding tools
Do inspection electrical tools of PT PINCURAN MAS tagging equipment use yellow color note service portable map and extension cable because unsafe cable power also make note for cable extension that use at indoor area because no cover of male connector ( EDI & ADI )
2026-10-02
1 week ago
NR.EL-01 Wahyu Adi Triono 443-EL1 Continue fabrication door-prepare cover of wall-tidy up elevator control
Fabrication door also install cover of wall and di tidy up elevator control use brush and equipment cleaning tools ( JAJAT & AGUS & RIZAL &  ANDRI & MUHAIMIN & DADANG )
2026-09-30
1 week ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Continue fabrication panel welding point
Do fabrication of panel welding point at workshop result good ( AGUS & DADANG & EDI & ADI )
2026-09-30
1 week ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-2K1-&-443-PR1-T1 PMR service analyzer & service temperature IR TAD issue reading temperature low
Do clean up flange probe-probe-sample line-filter sample line-diaphragm pump-filter balston from dirty of dust use instrument air supply also water for filter sample line. Check function of humidity sensor and filter humidity result function humidity sensor good and filter humidity good condition. Clean up lens of camera and flange probe IR TAD result value temperature show around 960 degree celcius at CCR operator ( JAJAT & RIZAL & ANDRI )
2026-09-28
2 weeks ago
NR.EL-01 Wahyu Adi Triono L63-RM1-&-473-CC1-&-463-KL1 PMR Service Crit Motor & LSR KL & Cooler
Clean area motor and filter motor from dirty of dust use instrument air supply and rag. Measure vibration-noise of FS and LS add grease motor for 25 times and 30 times of FS and LS. Check at ER4 and ER5 for RPM-KW-Ampere-V input-I total put at data check sheet ( ANDRI & DADANG )
2026-09-28
2 weeks ago
NR.EL-01 Wahyu Adi Triono L63-LQ2-M1 Disconnect auto grease motor
Disconnect cable power auto grease of L63 LQ2. Also reconnect cable power after finish service replace pump  test function auto grease result ok ( EDI & ADI )
2026-09-28
2 weeks ago
NR.EL-01 Wahyu Adi Triono 443-PH1 Cyclone 4 cross check temperature gas and material
Do cross check temperature at exit gas and materials cyclone 4 result  CCR reading high than local adjust range temperature transmitter ( JAJAT & ANDRI & DADANG )
2026-09-28
2 weeks ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-443-PH1 PMR service critical motor LSR RM-PH
Clean area motor and filter motor from dirty of dust use instrument air supply and rag. Measure vibration-noise of FS and LS add grease motor for 20 times and 25 times of FS and LS. Check at ER3 and ER4 for RPM-KW-Ampere-V input-I total put at check sheet. Clean up filter motor 363 FA2 from dirty of dust use instrument air supply note filter motor at east side one side bad condition need replace new filter motor ( EDI & ADI )
2026-09-25
2 weeks ago
NR.EL-01 Wahyu Adi Triono BELT-FEED Close hole cable and ER VSD belt feed
Add seal foam of hole between cable and ER VSD also wall from rust and plat . Result hole already cover by seal foam and plat for wall ( AIMAN )
2026-09-25
2 weeks ago
NR.EL-01 Wahyu Adi Triono 423-FN1 Issue alarm Fan red cool on (Cleaning Filter)
Clean up filter from dirty of dust use hand blower. Reinstall filter result alarm fan disappear. Clean up filter panel VSD 363 FN1-363 FN2-443 FN1 from dirty of dust use hand blower ( AGUS & MUHAIMIN )
2026-09-25
2 weeks ago
NR.EL-01 Wahyu Adi Triono HRG-&-L1C-BC1-L1C-BC2-L1C-BC3-OF-M1 Install Lamp Filter WTP-HRG & observation installation Material Level at Truck Lift
Check at site, looking  location install lighting lamp. Prepare support of lighting lamp and cable power wiring existing lighting lamp . Install lighting lamp and cable power lighting lamp test function result good lighting lamp on. Do observation of installation material level at L1C BC1-L1C BC2-L1C BC3. Decided material level will install top of main hole check material coal. Prepare support of material level at work shop (JAJAT & EDI & ADI & ANDRI & DADANG )
2026-09-24
2 weeks ago
NR.EL-01 Wahyu Adi Triono 443-EL1 Prepare Replacement cable
Pulling cable power and relocation conduit from main hole to protect from positive hot gas. Also install LCS at north side from existing south side ( JAJAT & AGUS & EDI & ADI & ANDRI & ANDRI & DADANG & DAFI TRUBA )
2026-09-23
2 weeks ago
NR.EL-01 Wahyu Adi Triono CAMERA-BURNER Observation camera burner issue often retract
Dismantle camera burner found front lens cracked, bring down to work shop. Continue clean up all lens and part support of lens also card from dirty of dust and oil. Replace front of lens with spare unit. Reassembling camera. Install camera burner at site test function insert and retract camera result good ( AGUS & MUHAIMIN & ANDRI )
2026-09-23
2 weeks ago
NR.EL-01 Wahyu Adi Triono 423-2K1-&-483-RF2 Repare Auto Drain & pulling cable power Start / Stop
Check at location found AUTO Drain always energized, service per membrane from dirty of dust and reinstall test function result normal. Do pulling cable of 483 RF2 from LCS to panel I/O 4C1-2RB 31 ( EDI & ADI & DADANG )
2026-09-22
2 weeks ago
NR.EL-01 Wahyu Adi Triono 443-PH1-4.5-&-6-TH-FLOOR-&-L93-SC1-&-453-PF1-&-L63-BF1 Issue lighting lamp off and relocation lighting lamp of bridge issue hit from water
Do replace lighting lamp of 443 ph1 4.5 floor and 6th floor & L93 SC2-453 PF1-l63 BF1 of bridge also relocation lighting lamp  test function result lighting lamp on ( AGUS & MUHAIMIN & ANDRI & DADANG )
2026-09-21
2 weeks ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-443-PH1-&-L63-RM1-&-473-CC1-&-463-KL1 PMR service critical motor LSR CM - PH & PMR critical motor area kiln and cooler
Clean CB dan Add greasing area ( AGUS & EDI & ADI & MUHAIMIN & DADANG )
2026-09-21
3 weeks ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-2K1 PMR service analyzer
Clean  Filter  and  sample line ( AGUS & RIZAL & MUHAIMIN & ANDRI & DADANG )
2026-09-02
3 weeks ago
NR.EL-01 Wahyu Adi Triono 443-PH1-4.5-&-6-TH-FLOOR Check and replace lighting lamp reason blinking
Do replace lighting lamp at 4th and 6th floor reason blinking. Test function lighting lamp result good (AGUS & ANDRI & MUHAIMIN & DADANG )
2026-09-21
3 weeks ago
NR.EL-01 Wahyu Adi Triono 363-MD1 PMS 363 MD1, clean up filter 363 FA2-area motor -carbon brush room
Clean up filter 363 FA2-area motor main drive-carbon brush room from dirty of dust use instrument air supply. Measure long all carbon brush result replace carbon brush no 2 reason bad condition ( EDI & ADI )
2026-09-18
3 weeks ago
NR.EL-01 Wahyu Adi Triono 483-PW1 Calibration Tonase
Do calibration tonase of zero and span result good ( RIZAL & ANDRI & DADANG )
2026-09-18
3 weeks ago
NR.EL-01 Wahyu Adi Triono L63-RM1-&-443-WI-&-443-FN1 Tapping cable power & tidy up cable motor & tap power panel cooling motor
Do tapping cable power of L63 RM1 & Do tidy up cable motor of 443 WI result ok. Tap power 380 volt of panel cooling fan 443 FN1( AGUS & MUHAIMIN & KARDI CIVACON )
2026-09-18
3 weeks ago
NR.EL-01 Wahyu Adi Triono 463-KL1-T1 Replace thermocouple
Replace sensor thermocouple of 463 KL1 T1 result indication available at CCR operator ( RIZAL & ANDRI & DADANG )
2026-09-18
3 weeks ago
NR.EL-01 Wahyu Adi Triono 363-RM-&-FEED-BIN-&-483-FN1-M1 Clean up panel I/O - LCS motor & issue plat support vent fan add vibration. Eliminated plat sticking at platform
Do clean up LCS motor also control speed sensor and panel I/O area raw mill - feed bin from dirty of dust use wire brush - hand blower- rag. Do eliminated sticking plat at plat from of vent fan 483 FN1 M1 result ok ( EDI & ADI )
2026-09-18
3 weeks ago
NR.EL-01 Wahyu Adi Triono 333-WF2 Issue high noise motor
Check at site. Dismantle cover chain motor. Test running motor no load measure noise motor result  normal. Stop motor install back cover chain motor ( EDI & ADI & KARDI CIVACON )
2026-09-18
3 weeks ago
NR.EL-01 Wahyu Adi Triono 483-RF2 Issue over load and motor trip
Check at site measure resistance R-S-T found 2 cable over load. Check at terminal motor found 1 cable untighten. Do tighten cable and recover all cable use rubber isolation and cable isolation test function 483 RF2 with different speed  result normal. Check VSD of 483 RF2 test function  motor with different speed check ampere at display VSD result around 1.71 to 1.75 ampere ( JAJAT & EDI & ADI )
2026-09-17
3 weeks ago
NR.EL-01 Wahyu Adi Triono L63-RM1-T1 Issue error indication at CCR
Replace sensor of L63 RM1 T1 use spare unit result indication normal at CCR note welding support of sensor temperature reason bad condition ( RIZAL & ANDRI & DADANG )
2026-09-17
3 weeks ago
NR.EL-01 Wahyu Adi Triono L93-RF2-&-393-FA1 Install Motor & replace bearing motor issue high noise
Check at site found actual high noise note replace bearing motor. Dismantle motor bring to work shop continue replace bearing motor. Install motor at site test run local motor measure vibration and noise of FS and LS motor result vibration below 2 mm/s and noise motor below 1 gE. Bring spare motor to location but not install because mechanic will replace complete unit note put spare motor inside analyzer L63 2k2 ( AGUS & MUHAIMIN & KARDI CIVACON )
2026-09-17
3 weeks ago
NR.EL-01 Wahyu Adi Triono 413-3B1-&-413-3B2-&-443-PH1-&-463-KL1-&-473-CC1-&-L63-RM1 Clean up panel I/O
Do clean up panel I/O area east blending & west blending - pre heater 8th - 5th- 3rd floor from dirty of dust use rag and hand blower note clean up panel I/O 5th top side from hard dust need install cover for top panel I/O to protect from dust make panel available from long term use. Do clean up panel I/O are kiln-cooler from dirty of dust also coal use rag and hand blower ( EDI & ADI & IMAN & RISNA CIVACON )
2026-09-17
3 weeks ago
NR.EL-01 Wahyu Adi Triono ER3-&-ER4-&-ER5 Support black out process
Do support black out process result ok ( RIZAL & EDI & ADI & MUHAIMIN & ANDRI & DADANG & KARDI CIVACON & RISNA CIVACON )
2026-09-16
3 weeks ago
NR.EL-01 Wahyu Adi Triono 443-PH1 Continue modification air blaster of TAD + Trial
Install tank air blaster of temperature TAD test function result normal high pressure air and bring dwon existing tank of air blaster to workshop ( RIZAL & ANDRI )
2026-09-16
3 weeks ago
NR.EL-01 Wahyu Adi Triono 443-PH1-&-463-KL1-&-473-CC1 Check and repaire welding panel
Check panel welding 4W3-1NH found output 220 VAC 3 units bad condition replace 3 units with spare unit and panel welding 4W3-1NC found output 220 VAC 1 unit bad condition no cover available replace use spare unit result ok normal. Also panel welding at 8th floor 443 PH1 found 1 unit output 22o VAC bad condition no cover available replace use spare unit and wiring 2 units output 220 VAC result normal ( EDI & ADI )
2026-09-14
4 weeks ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-443-PH1 PMR critical motor RM & PH
Clean up area motor and filter motor. Measure vibration-noise-temperature of FS and LS motor. Add grease motor for 25 times and 90 times of FS and LS motor make vibration below 4 mm/s and noise below 2 gE. Check at ER3 and ER4 for KW-voltage-ampere-temperature motor and write at check sheet note noise 363 MD1 still up2 gE even add grease 1.5 bottle grease gun. Replace auto grease motor 363 MD1 at LS side issue empty grease motor ( AGUS & ADI )
2026-09-14
4 weeks ago
NR.EL-01 Wahyu Adi Triono L63-RM1-&-473-CC1-&-463-KL1 PMR Service Crit Motor & LSR KL & Cooler
Clean up area motor and filter motor. Measure vibration-noise-temperature of FS and LS motor. Add grease motor for 25 times and 30 times of FS and LS motor make vibration below 4 mm/s and noise below 2 gE. Check at ER4 and ER5 for KW-voltage-ampere-temperature motor and write at check sheet ( MUHAIMIN & DADANG )
2026-09-11
1 month ago
NR.EL-01 Wahyu Adi Triono 463-2K1 Tidy up cable at 463 2K1 + test signal+ prepare activation fan exchanger
Do PMR service: clean up probe flange-probe-filter sample line-sample line tube-diaphragm pump-filter balston form dirty of dust use instrument air supply also water. Pulling cable new fan exchanger also wiring cable power-prepare pipe for activation fan exchanger. Do pulling cable of compressor to panel I/O inside analyzer room. Do test signal result good ( JAJAT & AGUS & RIZAL & ADI & EVE INDY & ANDRI & MUHAIMIN & DADANG )
2026-09-11
1 month ago
NR.EL-01 Wahyu Adi Triono 473-SC1-&-473-SC2 Issue speed failure
473 SC1: check at site probe and propeller normal, also inspection wiring cable measure voltage result bad condition  from color black & white replace color chocolate & white result normal. 473 SC2 check at site found propeller detached. Ask stop motor from CCR and install propeller test function result speed failure normal when start motor from CCR ( JAJAT & RIZAL & ADI & ANDRI & EVE INDY & DADANG )
2026-09-11
1 month ago
NR.EL-01 Wahyu Adi Triono 423-2K1 CGA analyzer
Do calibration of zero and span gas some gas MCS 100E use span gas 3rd party result good drift below 2.5% ( JAJAT & RIZAL & EVE INDY )
2026-09-10
1 month ago
NR.EL-01 Wahyu Adi Triono 483-FN1-M1 Install Fan motor
Install fan 483 FN1 M1, test function measure ampere result 5.1 ampere also vibration FS and LS result  around 5.2 from setting maximum 7ampere mm/s to 25 mm/s-noise around 1.3 gE note because vibration high run  with 483 FN1 M2 ( MUHAIMIN & ANDRI & DADANG )
2026-09-10
1 month ago
NR.EL-01 Wahyu Adi Triono 423-2K1 CGA analyzer
Do calibration zero and span gas for MCS 100E together with 3rd party result good ( RIZAL & EVE INDY )
2026-09-10
1 month ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP-&-MAINGATE Create SOT -TO month of september 2026 & inspection electrical tool s of PT Tupsa
Do create reporting SOT of September 2026 for 4 reporting at SHE SIG & inspection electrical tools for GENSET 2 unit PT TUPSA tagging equipment with yellow color ( JAJAT & AGUS & ADI )
2026-09-09
1 month ago
NR.EL-01 Wahyu Adi Triono L63-RM1 PMR service analyzer
Clean up flange probe-sample line-filter sample line-diaphragm pump-filter balston from dirty of dust coal use instrument air supply also water. Check function humidity sensor and filter humidity result function humidity sensor normal and filter humidity good condition ( JAJAT & RIZAL & EVE INDY & ANDRI )
2026-09-09
1 month ago
NR.EL-01 Wahyu Adi Triono L93-SC2 Cover motor not tight
Check at location found part of cover motor broken, install cover motor use wire because nuts cover bad condition ( MUHAIMIN & ADI & DADANG )
2026-09-08
1 month ago
NR.EL-01 Wahyu Adi Triono 393-BF1-&-423-2K1 Issue purging abnormal & issue failure
Check at site found membrane bad condition replace big membrane 6 unit and small membrane 5 units test function bag filter result normal and do PMR service CEMS result analyzer back at good condition ( RIZAL & ANDRI )
2026-09-08
1 month ago
NR.EL-01 Wahyu Adi Triono L33-BC1-M1 Issue speed motion block at CCR & test function motion
Check at site and replace card miltronics of sensor motion setting same like existing do test function speed result good at CCR ( AGUS & MUHAIMIN & DADANG )
2026-09-08
1 month ago
NR.EL-01 Wahyu Adi Triono 443-PH1;-L63-RM1;-463-KL1 PMR IR TAD- T Scanner- CCTV - Camera Burner
Do clean up flange probe and lens of IR TAD-T scanner lens-CCTV lens-Pyrometer lens from dirty of dust use rag and equipment cleaning tools ( EDI & ADI & EVE INDY )
2026-09-07
1 month ago
NR.EL-01 Wahyu Adi Triono 363-RM1 Replace lighting lamp
Do replace lighting lamp at area 363 RM1 use spare lighting lamp 2 units test function result normal on ( MUHAIMIN & DADANG & ANDRI )
2026-09-07
1 month ago
NR.EL-01 Wahyu Adi Triono 443-PR1-T1 Issue temperature low
Pipe purging blocked, replace tube for purging test function result normal (Rizal & Andri)
2026-09-07
1 month ago
NR.EL-01 Wahyu Adi Triono 453-AE8-SV8 Issue open-close abnormal
Check at location found relay 24 VDC bad condition of coil, service coil replace 1 unit relay test function aeration normal note spare relay 24 VDC( RIZAL & ANDRI )
2026-09-07
1 month ago
NR.EL-01 Wahyu Adi Triono 483-FN1-M1 Issue motor loose bolt check abnormally
Check at location found 4 nuts untighten. Replace nuts motor with spare units note 2 nuts can not replace because part of drat nut left at flange motor ( EDI & ADI & EVE INDY )
2026-09-07
1 month ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-443-PH1 PMR service critical motor LSR RM-PH
Clean up area motor and filter motor. Measure vibration-noise of FS and LS add grease motor 25 times-30 times for FS and LS make vibration below 4 mm/s and noise below 2 gE. Check at ER4 and ER5 for KW-Voltage -Ampere-Temperature of motor fill in at check sheet motor note replace tank of AUTO grease motor 2 units ( JAJAT &MUHAIMIN )
2026-09-07
1 month ago
NR.EL-01 Wahyu Adi Triono 463-KL1-&-473-CC1 PMR Service Crit Motor & LSR KL & Cooler
Clean up area motor and filter motor. Measure vibration-noise of FS and LS add grease motor 25 times-30 times for FS and LS make vibration below 4 mm/s and noise below 2 gE. Check at ER4 and ER5 for KW-Voltage -Ampere-Temperature of motor fill in at check sheet motor ( AGUS & DADANG )
2026-09-04
1 month ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-2K1 Issue CO reading low cross check
Clean up filter sample line and do zero also span calibration for CO result normal and reading CO back to normal at CCR ( RIZAL & EVE INDY & ANDRI )
2026-09-03
1 month ago
NR.EL-01 Wahyu Adi Triono 463-KL1-&-473-CC1 WBI Weld & Panel Lighting area KILN also Cooler
Do WBI welding and lighting area kiln also cooler ( EDI & IMAN )
2026-09-03
1 month ago
NR.EL-01 Wahyu Adi Triono 483-AR1-SV13 Solenoid valve is not working
Do check at site found s/v bad condition, replace 4 s/v test function result working normal ( RIZAL & MUHAIMIN & EVE INDY & DADANG )
2026-09-02
1 month ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP List Motor down at OH 2027 (included Bearing)
Do make list of motor down at OH 2027 included bearing  ( AGUS & JAJAT )
2026-09-02
1 month ago
NR.EL-01 Wahyu Adi Triono L63-RM1 PMR service analyzer
Clean up flange probe-sample line tube-sample filter-diaphragm pump-filter balston from dirty of dust coal use instrument air supply and equipment cleaning tools. Test function humidity sensor and check filter humidity result function sensor humidity normal and filter good condition ( RIZAL & ANDRI )
2026-09-02
1 month ago
NR.EL-01 Wahyu Adi Triono BELT-FEED Repare Area Belt Feed-RM Recaptacle Short
Check at location found receptacle trip at panel lighting lamp. Do elimination 2 receptacle at north side and south side do rewiring cable for lighting lamp test function result normal ( EDI & ADI & EVE INDY & DADANG )
2026-09-01
1 month ago
NR.EL-01 Wahyu Adi Triono L63-FN1 Issue KW is not value ( issue transducer )
Check at ER4 and do reset power of KW metering result indication KW normal at CCR ( AGUS & EDI & DADANG )
2026-09-01
1 month ago
NR.EL-01 Wahyu Adi Triono 333-WF1 Issue speed monitor bad indication
Check at location found belt roller crooked make good position of belt roller and install speed monitor result indication normal at CCR operator ( JAJAT & RIZAL & ANDRI & EVE INDY & UNJ AZRIEL )
2026-09-01
1 month ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-2K1 PMR service analyzer
Clean flange probe-probe-sample line filter-sample line line tube-diaphragm pump-filter balston from dirty of dust use instrument air supply. Test function humidity sensor and check filter humidity result function humidity sensor normal and filter humidity good condition note replace filter humidity at 443 2K1 with spare filter. Do test gas CO at 463 2K1 reason reading often -0.001 to 0.002 result reading CO 1.1 PPM ( RIZAL & ADI & EVE INDY & ANDRI & UNJ AZRIEL )
2026-08-31
1 month ago
NR.EL-01 Wahyu Adi Triono L1C-BC2 Test function BD
Do test function BD of L1C BC2 result normal  ( EDI & EVE INDY & ANDRI )
2026-08-31
1 month ago
NR.EL-01 Wahyu Adi Triono 463-KL1-&-473-CC1 PMR Service Critical Motor & LSR KL & Cooler
Clean up area motor and filter motor. Measure vibration-noise of FS and LS. Check ampere-KW-voltage-temperature at ER4 & ER5 put in check sheet form ( AGUS & DADANG )
2026-08-31
1 month ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Support TPM activity
Do support TPM activity ( RIZAL & AZRIEL UNJ & EVE INDY )
2026-08-31
1 month ago
NR.EL-01 Wahyu Adi Triono ER4 Fabrication piping of water and air ( support AC rubicon ER4 )
Do fabrication piping of water and air for support  AC Rubicon ER4 (EDI & DADANG & ANDRI )
2026-08-28
1 month ago
NR.EL-01 Wahyu Adi Triono 333-WF1 Install and fabrication fan ccoller
Replace Tesys LUB12 also jumper contact relay test function fan cooling motor working normal and check vibration motor result still good ( AGUS & ADI & ANDRI )
2026-08-28
1 month ago
NR.EL-01 Wahyu Adi Triono 363-MD1-&-363-FN1-&-363-FN2 PMS-clean up carbon brush room
Do clean up carbon brush room of 363 MD1-363 FN1-363 FN1 from dirty of dust use instrument air supply also clean up filter 363 FA2. Measure long of all carbon brush result still up to minimum ( EDI & DADANG )
2026-08-27
1 month ago
NR.EL-01 Wahyu Adi Triono ER4 Repare lock ER4
Do repare of ER4 use welding machine ( ADI & ANDRI )
2026-08-27
1 month ago
NR.EL-01 Wahyu Adi Triono 333-WF1-&-393-BE2-&-FEED-BIN Recalibration if possible & check speed failure & install lighting lamp
Do calibration zero and span result zero before 0 t/h zero after 0 t/h- span before 155 t/h span after 161 t/h-Replace speed sensor, result indication normal at CCR-Do install lighting lamp test function result  lighting lamp on ( JAJAT & RIZAL & UNJ AZRIEL & ANDRI )
2026-08-27
1 month ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Install heater spare motor 363 FN2-463 MD1-363 MD1 and clean up use blower
Open cover cable heater motor, rewiring cable heater 363 FN1-363 FN2-463 MD1. Tidy up recondition motor put at north side and spare motor at south side ( AGUS & ADI & DADANG )
2026-08-26
1 month ago
NR.EL-01 Wahyu Adi Triono L63-RM1 PMR service analyzer
Clean up flange probe-sample line tube-filter sample line-diaphragm pump-filter balston from dirty of coal dust use instrument air supply. Check function humidity sensor and filter humidity result function humidity sensor normal and filter humidity good condition ( RIZAL & ANDRI )
2026-08-25
1 month ago
NR.N2-OH Wahyu Adi Triono 444-PH1 Support feeding process at Nr2
Check value pressure at 444 PI 13A at 7th floor use manual manometer show pressure 131 to 150 mmH2O compare with CCR reading 660 mmH2O check range existing -4 to 0 mmH2Ot change range to 0-600 mmH2O result reading local same with CCR. Check reading temperature 444 PH1 T3 reading minus at CCR check connection cable and do recorrect wiring cable result temperature good. 444 GT4 materials don't flow to sirculation try change open and close gate result still same and use instrument air supply to make materials go to sirculation point result good ( JAJAT & EDI & ADI & MUSLIH SHIFT & RIZKY SHIFT & RIZKY FAUZI & SUPRIYADI & DADANG & IMAN )
2026-08-25
1 month ago
NR.SHIFT Wahyu Adi Triono YM-CEMS Support Hannes and Adrianus
Do support YM CEMS with Mr. Hannes and Mr. .Adrianus. Clean up Flowsic 100 complete unit also filter purge air unit. Bring down Dust Hunter T100 check zero adjust result value zero without materials 1.2 mg/m3 recheck function of swivel windows result replace swivel windows with spare units install back Dust Hunter at stack result value dust 4 until 5 mg/m3 ( RIZAL & ANDRI & HANNES KISS & ADRIANUS KISS )
2026-08-24
1 month ago
NR.EL-01 Wahyu Adi Triono HRG-ROOM- Issue dirty area inside and outside
Do clean up area HRG inside and outside also filter panel  from dirty of dust use instrument air supply ( JAJAT & UNJ AZRIEL )
2026-08-24
1 month ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-2K1 PMR service analyzer
Clean up flange probe-probe-filter sample line-sample line tube-diaphragm pump-filter balston from dirty of dust use instrument air supply. Check function of humidity sensor and filter humidity result function humidity sensor normal and filter humidity good condition ( RIZAL & ANDRI  )
2026-08-24
1 month ago
NR.EL-01 Wahyu Adi Triono L63-RM1-&-473-CC1-&-463-KL1 PMR Service Crit Motor & LSR KL & Cooler
Cleaning area and filter motor from dirty of dust use instrument air supply and equipment cleaning tools. Measure vibration-noise of FS and LS motor also add grease motor for 25 times and 30 times of FS and LS. Check at ER4 and ER5 for ampere motor-voltage motor-RPM-KW write at check sheet motor ( MUHAIMIN & DADANG )
2026-08-24
1 month ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-443-PH1 PMR service critical motor LSR RM-CM
Cleaning area and filter motor from dirty of dust use instrument air supply and equipment cleaning tools. Measure vibration-noise of FS and LS motor also add grease motor for 25 times and 40 times of FS and LS. Check at ER3 and ER4 for ampere motor-voltage motor-RPM-KW write at check sheet motor ( EDI & ADI )
2026-08-22
1 month ago
NR.N2-OH Wahyu Adi Triono 494-PN1 Install sling TLS for north and south side
Do install sling cable of TLS at south and north side also support of sling cable. Do test function TLS result good ( IRMIS & ADI & MUHAIMIN & ANDRI & DADANG )
2026-08-21
1 month ago
NR.N2-OH Wahyu Adi Triono HYDRAULIC-ROOM-NR2 Continue Installation Sensor Temp + Hum
Do installation sensor temperature and humidity at room hydraulic Nr2 also wiring cable at I/O panel ( AGUS & MUHAIMIN & DADANG )
2026-08-21
1 month ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Position motor from BOVERI
Achieve motor 463 MD1 from BOVERI put motor behind workshop ( AGUS & MUHAIMIN & DADANG )
2026-08-21
1 month ago
NR.EL-01 Wahyu Adi Triono MAIN-GATE-ACCES-CONTROL Check tools jack hamer of PT Indoporlen 4 units
Do inspection electrical tools of PT INDOPORLEN for jack hammer 4 units test run tools result ok note equipment tagging blue color ( EDI & ADI )
2026-08-20
1 month ago
NR.N2-OH Wahyu Adi Triono L64-SC1 Install signal indication ampere motor for VSD L64 SC1 at ER5 Nr2
Prepare cable for signal indication output ampere motor of VSD L64 SC1 continue wiring cable at I/O panel ER5 Nr2 ( ZAHRA & ADI )
2026-08-20
1 month ago
NR.EL-01 Wahyu Adi Triono 443-W1-M1&-443-WI1-M1 Issue motor high load. Prepare motor spare
Check name plate motor of 443 WI1 M1 and 443 WI1 M3 and cross check spare motor at warehouse result find motor 2P 45 KW do test run megger motor result good no load measure ampere R-S-T get value 10 until 12 ampere and put motor spare 443 WI M3 behind workshop electric 1 ( EDI & ADI & JAJAT )
2026-08-19
1 month ago
NR.N2-OH yulandiandi L94-SC2 Motor L94-SC2 Mati Ready
Check local, Replace Probe test blm bisa pulse, Replace Amplifier test bisa pulse. Test Run L94-SC2 Sudah tidak mati Ready lagi/ normal
( Melky, Yulandi, Kardi )
2026-08-19
1 month ago
NR.N2-OH yulandiandi L94-SC2 Motor L94-SC2 Mati Ready
Check local, Replace Probe test masih blm pulse, Ganti Amplifier test langsung dengan motor L94-SC2 Kondisi bisa pulse/ok
2026-08-19
1 month ago
NR.N2-OH Wahyu Adi Triono L94-SC5 Issue often trip if on start from CCR
Replace probe and pre amplifier at local test function result normal ( TITOK & FAHRI & EVE TEGAR & EVE ZAHRA & KARDI CIVACON & ADI )
2026-08-19
1 month ago
NR.N2-OH Wahyu Adi Triono 394-CV2-CV3-CV4-CV5 Install sensor motion
Install support and sensor motion at 394 CV2-CV3-CV4-CV5 ( EVE SUPRIYADI & KARDI CIVACON & ADI )
2026-08-18
1 month ago
NR.N2-OH Wahyu Adi Triono WORK-SHOP-RMK-NR2-&-L64-RM1 Install motor 454 PF2 and bearing motor at workshop
Install motor at 454 PF2 and bearing motor 434 BL2 at workshop electric Nr2 with do heater bearing 6213 before install  at motor ( HARYANTO & EDI & ADI )
2026-08-18
1 month ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Create SOT July-August 2026
Create SOT document for month august for all member at electric RMK Nr1 ( JAJAT & ADI )
2026-08-15
1 month ago
NR.N2-OH Wahyu Adi Triono 474--FA8-M1 Issue motor unbalance information CBM Najib
Clean up area panel cable motor-connector cable-winding cable from dirty of dust use hand blower and liquid dust degreaser also clean up area motor from dirty of dust. Test run without load result good ( HARYANTO & ADI & @ CIVACON EMPLOYEE )
2026-08-14
1 month ago
NR.N2-OH Sadi Bin Rowi L34-BC2 OCR masih type TOR
Replace OCR, ganti dgn EOCR+ instal CT... Test trip Done
2026-08-14
1 month ago
NR.N2-OH Sadi Bin Rowi L34-BC1 OCR masih type TOR
Replace OCR, ganti dengan EOCR + instal CT..test trip..Done 
2026-08-14
1 month ago
NR.N2-OH Wahyu Adi Triono ER3-VSD-ROOM Clean up VSD panel 364 FN2-364 FN3 and inverter also filter panel-bus bar from dirty of dust use hand blower and thinner
Do clean up panel VSD of 364 FN2 & FN3 also filter cabinet-bus bar-cable power supply from dirty of dust use hand blower and thinner also equipment cleaning tools ( ADI & EVE ELGI & KARDI CIVACON & RAHMAT CIVACON  & EKO & MARDIYANTO )
2026-08-14
1 month ago
NR.N2-OH Sadi Bin Rowi L64-SX1 OCR respons too late, the seting Dtime isnt effect
Replace OCR + Replace R1
2026-08-13
1 month ago
NR.N2-OH Sadi Bin Rowi L94-RF1 OCR not respons
Replace EOCR dan test trip ok
2026-08-13
1 month ago
NR.N2-OH Wahyu Adi Triono ER9 Clean up VSD panel and inverter also filter panel-bus bar from dirty of dust use hand blower and thinner
Do clean bus bar-capacitor inverter-filter panel use hand blower and thinner. Measure value of capacitor write top of capacitor. Reinstall filter panel of VSD ( EKO JUAN & MARDIYANTO & ADI & EVE ELGI & KARDI CIVACON & 2 CIVACON EMPLOYEE )
2026-08-13
1 month ago
NR.EL-04 yulandiandi 59B-RF2 Wending motor kebakar
Replace motor & EOCR
2026-08-12
1 month ago
NR.N2-OH Yurizal Rachman 473-CR1 Instal Level Material
Instal level material,trashing kabel
2026-08-12
1 month ago
NR.N2-OH Wahyu Adi Triono BURNER-FLOOR Inspection electrical and welding tools of PT RMP
Do inspection electrical tools of PT RMP for panel power supply AC tagging equipment use blue color ( ADI & EVE ELGI )
2026-08-12
1 month ago
NR.N2-OH Sadi Bin Rowi 494-FN4 OCR absolute/TOR
Replace TOR dengan EOCR
2026-08-12
1 month ago
NR.N2-OH Sadi Bin Rowi 474-CV4.-M01 EOCR not responsif by manual test
Replace EOCR, seting ampere sesuai dgn existing dan test manual trip ok.. Done
2026-08-12
1 month ago
NR.N2-OH Wahyu Adi Triono 364-RM1-474-CC1-444-PH1-L64-RM1 Calibration pressure transmitter of zero and span
Do  calibration pressure transmitter area PH 5 units note replace pressure transmitter of 444 FN2 P2 from VEGA to Yokogawa because when give pressure at H or L always drop to zero  do test zero and span result normal. Complete data check sheet calibration pressure transmitter for 12/8/2026 ( ADI & EVE ELGI & EVE INDY & EVE TEGAR )
2026-08-12
2 months ago
NR.EL-04 yulandiandi 535-BF1 Control purgingnya mati
Check cable power input 110V...cable netral 110V Conectionnya kendor.
2026-08-11
2 months ago
NR.EL-04 yulandiandi 51B-CM7 Selector switch tidak bisa posisi Remote & Local
Replace selector switch
2026-08-11
2 months ago
NR.EL-04 yulandiandi 535-BF1 Control BF mati
Check power control purging ada yg shot
2026-08-11
2 months ago
NR.EL-04 yulandiandi 546-RM1.M1 Ada suara noist di bearing Motor yang LS
Check yg noist bearing motor yang LS dengan cara di discouple, hasilnya tidak ada noist.
CBM Alignment ulang motor 546-RM1.M1
2026-08-11
2 months ago
NR.N2-OH Sadi Bin Rowi ER5-NR2 Protection loss over current
Test trip EOCR dan List data set EOCR all equipment
2026-08-11
2 months ago
NR.N2-OH Sadi Bin Rowi 444-PU1.-M2 TOR tidak bisa di test trip
Replace TOR dengan EOCR+CT ratio 400/5
2026-08-11
2 months ago
NR.N2-OH Wahyu Adi Triono 364-RM1-474-CC1-444-PH1-L64-RM1 Calibration pressure transmitter area RM-PH-CM-CC
Do calibration pressure transmitter Honeywell 3 units but can not detected name of unit base on instruction Mr.Titok install back pressure transmitter at site no need replace new spare. Complete data check sheet calibration pressure transmitter since 4/8/26 to 10/8/26 ( ADI & EVE TEGAR & EVE INDY & EVE ELGI & UNJ AZRIEL )
2026-08-11
2 months ago
NR.N2-OH hamdani 444PU1M2 Tor absolute
Ganti tor ke eocr
2026-08-10
2 months ago
NR.N2-OH hamdani ER3-NAR2 364 gd 1 ocr absolute/ tor
Ganti tor dengan eocr
2026-08-10
2 months ago
NR.N2-OH Sadi Bin Rowi R4 Abnormal EOCR
Cek seting EOCR all equipment and test trip EOCR
2026-08-10
2 months ago
NR.N2-OH Sadi Bin Rowi 394-CV1 Relay R1 ga mau energize pada saat di test
Replace relay R1 dgn yg baru, test.. Ok
2026-08-10
2 months ago
NR.N2-OH Sadi Bin Rowi 364-GD1.-M1 OCR absolut, tidak ada fasilitas test... Old type
Replace TOR dengan EOCR... Test position trip dan seting trip sesuai sebelumnya 
2026-08-10
2 months ago
NR.N2-OH Wahyu Adi Triono 364-RM1-474-CC1-444-PH1-L64-RM1 Calibration pressure transmitter area PH-RM-CC-CM
Calibration pressure transmitter area PH-CC-RM for zero and span get 20 units note replace pressure transmitter from VEGA of 364 BF1 F1 use Yokogawa test zero and span result good ( ADI & EVE TEGAR & UNJ AZRIEL & EVE ELGI & EVE INDY )
2026-08-10
2 months ago
NR.N2-OH Yurizal Rachman 474-FN2 Service damper
Check,service dan setting damper fan R
2026-08-10
2 months ago
NR.N2-OH Yurizal Rachman 474-T1 Thermocouple rusak
Replace thermocouple exit cooler,inlet ep cooler
2026-08-10
2 months ago
NR.N2-OH Yurizal Rachman 474-VA1 Valve rusak
Replace valve kinetrol untuk flushing gun
2026-08-08
2 months ago
NR.N2-OH Yurizal Rachman ER2 Blackout
Suport black out activitg,clean up switch gear and mcc,meger buabar dan trafo
2026-08-07
2 months ago
NR.N2-OH Yurizal Rachman 474-FA Lepas Thermocouple
Lepas thermocouple undergrate
2026-08-07
2 months ago
NR.N2-OH Yurizal Rachman 474-FA Repair tubing
Repair tubing yg rusak,rojok lubang draft flow fan cooler area
2026-08-09
2 months ago
NR.N2-OH Muhaimin 394-BE1 Support OH Nar2.
Tap power untuk control drive portable alat gulung belt dan pulling cable output drive ke motor serta test running.
2026-08-09
2 months ago
NR.N2-OH Muhaimin 484-BL2,L34-BC1,L34-BC2 Rekondisi Motor OH Nar 2
Instal dan connect motor setelah rekondisi dari vendor Rems.
2026-08-08
2 months ago
NR.N2-OH Muhaimin NAR-2-ER5 Balckout Nar 2 pergantian VCB.
Jumper outgoing kubikel W1E ke kubikel EP cable 6 x 240 mm.
2026-08-07
2 months ago
NR.N2-OH Muhaimin 334-BC1 Cable output LCS kurang panjang
Ganti cable dan pasang grounding motor.
2026-08-07
2 months ago
NR.N2-OH Muhaimin 484-BL2 Base motor 484 BL2 baut slek.
Ganti baut base motor 484 BL2 dan modifikasi base.
2026-08-09
2 months ago
NR.N2-OH yulandiandi 394-BE2.M2,474-GD1MO2 Proteksi masih menggunakan TOR
Penggantian proteksi dari TOR ke EOCR
2026-08-08
2 months ago
NR.N2-OH yulandiandi 474-GD1.MO1 Proteksi masih menggunakan Sistem TOR
Penggantian dari Proteksi TOR ke EOCR
2026-08-08
2 months ago
NR.N2-OH yulandiandi 565-MD1,565-RM1,566-MD1,566-RM1 VCB kondisi kotor/berdebu
Service VCB & Blow out
2026-08-08
2 months ago
NR.N2-OH Wahyu Adi Triono 364-RM1-474-CC1-444-PH1-L64-RM1 Calibration pressure transmitter zero and span area RM-Cooler-PH-CM
Do calibration zero and span for pressure transmitter area raw mill-cooler-preheater-coal mill totals 6 units ( EVE TEGAR & ADI )
2026-08-08
2 months ago
NR.N2-OH yulandiandi TR-071,TR-072,TR-073,TR-074,565-1T1,566-1T1 Trafo dalam kondisi kotor
Blow out trafo & penegecekan baut conection
2026-08-08
2 months ago
NR.N2-OH Hendro Supramono BATTERY-CHARGER-MSS-N2 Baterry Charger 110VDC failure
Perbaikan penggantian kabel battery yang short.
Service dan cleanup periodik.
2026-08-08
2 months ago
NR.N2-OH Wahyu Adi Triono MAIN-GATE-ACCES-CONTROL Inspection electrical and welding tools of Quadro
Do inspection electrical and welding tools of Quadro. Tagging electrical tools use blue color note extention cable 2 units no cover female connection ask quadro replace with cover for all female connection (  ADI & TRUBA ILHAM )
2026-08-08
2 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1-&-473-CC1 PMR Service Crit Motor & LSR KL & Cooler
Clean up area motor and filter motor. Measure vibration-noise-temperature of FS and LS motor. Add grease motor for LS and FS 25 times and 30  times . Check at ER5 and ER4 for data KW-Ampere-Voltage-Temperature and fill in at data check sheet ( AGUS & MUHAIMIN )
2026-08-08
2 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-443-PH1 PMR Service Critical Motor & LSR RM&CM1
Clean up area motor and filter motor. Measure vibration-noise-temperature of FS and LS motor. Add grease motor for LS and FS 15 times and 20  times note 363 MD1-363 FN1-363 FN2 off condition. Check at ER3 and ER4 for data KW-Ampere-Voltage-Temperature and fill in at data check sheet ( EDI & DADANG )
2026-08-08
2 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-2K1 PMR service analyzer
Clean up flange probe-probe-filter sample line-sample line tube-diaphragm pump-filter balston from dirty of dust use instrument air supply. Check function humidity sensor and filter humidity result function humidity sensor normal and filter good condition ( RIZAL & ANDRI )
2026-08-08
2 months ago
NR.N2-OH Wahyu Adi Triono ER2-&-ER3-&-ER4-&-ER5 Support black out process OH NR2
Do support black out process at ER2-ER5-ER4-ER3. Clean up trafo-MCC-MSS -I/O panel from dirty of dust use equipment cleaning and hand blower also do vacuum electric room. Do megger cable R-S-T to ground fill in at check sheet of data ER2 ( JAJAT & AGUS & RIZAL & ADI & ANDRI & AIMAN & DADANG )
2026-08-07
2 months ago
NR.N2-OH Hendro Supramono BATTERY-CHARGER-ER3-N2 Cooling Fan sudah lifetime, Battery sudah drop dan service tahunan
Penggantian Cooling Fan 3 EA, Penggantian Battery 18 EA 12V 120Ah, Service 
2026-08-07
2 months ago
NR.N2-OH yulandiandi 364-PU1.MO1,364-PU1.MO2,364-SJ1.MO1,364-LQ2.MO6,364-LQ2.MO7 Proteksi masih menggunakan TOR
Penggantian proteksi TOR ke EOCR
2026-08-07
2 months ago
NR.N2-OH Wahyu Adi Triono 364-RM1-474-CC1-444-PH1 Calibration pressure transmitter zero and span area RM-Cooler-PH
Do calibration zero and span for pressure transmitter area raw mill-cooler-preheater-coal mill totals 10 units note replace 1 unit  pressure transmitter 364 BF1 P1 range 0-150 mmH2O calibration result good because existing pressure transmitter check span output drop to 7 mA ( ADI & EVE TEGAR & UNJ AZRIEL )
2026-08-06
2 months ago
NR.N2-OH yulandiandi 364-LQ2.MO2 Masih menggunakan proteksi TOR
Penggantian proteksi dari TOR ke EOCR
2026-08-06
2 months ago
NR.N2-OH yulandiandi 364-LQ2.MO1 Proteksi masih menggunakan TOR
Penggantian dari TOR ke EOCR
2026-08-06
2 months ago
NR.N2-OH Muhaimin 364-LQ1,394-FA6,434-FA1,L94-SC3,L94-SC6,L94-FN2 Rekondisi motor Oh Nar2
Support OH Nar2 disconncet dan bongkar motor 364-LQ1,394-FA6,434-FA1,L94-SC3,L94-SC6,L94-FN2 untuk rekondisi keluar ke PT Rems dan Tridaya.
2026-08-05
2 months ago
NR.N2-OH Muhaimin L94-RF1,L94-RF2,484-FN4 Rekondisi motor OH Nar 2
Support OH Nar 2 Disconnect dan bongkar motor L94 RF1,RF2, 484 FN4 rekondisi motor ke luar PT Rems dan Tridaya.
2026-08-06
2 months ago
NR.N2-OH Wahyu Adi Triono 364-RM1-474-CC1-444-PH1-L64-RM1 Calibration pressure transmitter area PH-RM-CC-CM
Do calibration zero and span for pressure transmitter area raw mill-cooler-preheater-coal mill totals 10 units ( ADI & EVE TEGAR & UNJ AZRIEL )
2026-08-06
2 months ago
NR.N2-OH Yurizal Rachman 474-FAE Service dan repair
Check,service repair ganti card,repaire blade dan setting
2026-08-05
2 months ago
NR.N2-OH Yurizal Rachman 474-FA Check dan service damper
Check open close damper dari ccr
2026-08-05
2 months ago
NR.N2-OH Yurizal Rachman 484-FN2,FN3 Check damper
Check open close damper
2026-08-05
2 months ago
NR.N2-OH Hendro Supramono BATTERY-CHARGER-ER5 Fan Cooling sudah kurang lifetime dan service tahunan
penggantian Cooling Fan sebanyak 3 EA dan service tahunan
2026-08-05
2 months ago
NR.N2-OH Hendro Supramono UPS-ER5 Cooling Fan sudah lifetime dan service tahunan
Service tahunan, ganti fan 3EA
2026-08-05
2 months ago
NR.N2-OH yulandiandi 3C2-2RA.20 Panel I/O & Panel ATS kondisi kotor/berdebu
Blow out & ganti lampu tl yg mati di dalam panel I/O
2026-08-05
2 months ago
NR.N2-OH yulandiandi 364-RM1.C1 Check toleransi capasitor
Hasil pengukuran capasitor :
( Y1+PH )               ( Y2+PH )               ( Y1+Y2 )
  42,87uF                  42,94uF                 21,47uF
  42,42uF                  39,68uF                 20,51uF
  42,90uF                  39,50uF                 20,60uF
2026-08-05
2 months ago
NR.N2-OH Naufal ER3 Pengecekan EOCR
Pengecekan respon trip dari EOCR
2026-08-05
2 months ago
NR.N2-OH Naufal 334-LQ.M01 Proteksi masih menggunakan TOR
penggantian proteksi menjadi EOCR 
2026-08-05
2 months ago
NR.N2-OH Wahyu Adi Triono 364-RM1-474-CC1-444-PH1 Calibration pressure transmitter area PH-RM-CC
Do calibration zero and span for pressure transmitter area raw mill-cooler-preheater totals 15 units ( ADI & EVE TEGAR & UNJ AZRIEL )
2026-08-04
2 months ago
NR.N2-OH Muhaimin 484-BL2,454-BL4 Rekondisi Motor OH Nar 2
Disconnect dan lepas motor 484 BL2,454 BL4 untuk rekondisi keluar ke PT Rems.
2026-08-04
2 months ago
NR.N2-OH Muhaimin 474-CV1,CV2,CV3,CV4 Rekondisi motor
Disconnect dan lepas motor 474 CV1,CV2,CV3,CV4 untuk rekondisi keluar ke PT Tridaya.
2026-08-04
2 months ago
NR.N2-OH yulandiandi ER04A Area mcc dan all panel tubical 380V kondisi kotor
Blow out panel tubical 380V dan vacum lantai mcc ER04A
2026-08-04
2 months ago
NR.N2-OH Naufal ER4A Pengecekan Proteksi EOCR
Pengecekan respon proteksi EOCR serta pengecekan equipment yang masih menggunakan TOR sebagai berikut:
474-GD1.M2
Set : 5A

434-BL7
Set : 60 A

444-PU1.M2
Set : 115 A

474-GD1.M01
Set :3.5

414-BL5 
Set : 20A

4D4-BL1.M01
Set : 275 A

454-WS1.C1
Set : 60 A

2026-08-04
2 months ago
NR.N2-OH yulandiandi ER-4A Lampu indikasi panel tubical 434-BL2.MO1rusak
Replace lampu indikasi yg baru
2026-08-04
2 months ago
NR.N2-OH Yurizal Rachman 474-GQ Lepas pressure transmitter
Lepas pressure transmitter area great cooler
2026-08-04
2 months ago
NR.N2-OH Yurizal Rachman 474-FA Lepas pressure transmitter
Lepas pressure transmitter fan cooler all
2026-08-04
2 months ago
NR.N2-OH Wahyu Adi Triono WORK-SHOP-ELECTRIC-NR2 Calibration pressure transmitter area RM
Do calibration zero and span for pressure transmitter area raw mill 4 units ( ADI & EVE TEGAR & UNJ AZRIEL )
2026-08-03
2 months ago
NR.N2-OH Yurizal Rachman 494-BF3- Service
Repair diafragm bocor,replace solenoid rusak,clean up panel purging
2026-08-04
2 months ago
NR.N2-OH Hendro Supramono 424-EP1 Service Transformer tahunan
Survey oleh Trafindo persiapan service, ganti oli, bushing dan seal termasuk purifying.
2026-07-29
2 months ago
NR.N2-OH Hendro Supramono BATTERY-UPS-CCRN2 battery sudah tua
rencana penggantian batere tipe basah dengan batere tipe kering bersamaan service OHN2-2026 bulan Agustus.

2026-08-03
2 months ago
NR.EL-01 Wahyu Adi Triono 483-PF1-&-453-PF1 Adjust CF
Do adjusted CF ( RIZAL & ANDRI )
2026-08-03
2 months ago
NR.N2-OH Wahyu Adi Triono PY-ADZALAMA Inspection electrical and welding tools
Do inspection electrical and welding tools of PT Adzalama tagging equipment bule color note repare brook machine because grounded cable not connected properly. Rejected 2 extention cable because no cover at male connector ( ADI & WILDAN CIVA & MUSLIH SMI )
2026-08-03
2 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Complete data of AUDIT API
Do  complete data AUDIT API ( JAJAT & ADI & UNJ AZRIEL )
2026-07-31
2 months ago
NR.EL-01 Wahyu Adi Triono 423-2K1 PMR service CEMS
Dust hunter: clean up purge air unit-filter motor flange with tube-swivel window T/R & R -alignment T/R  & R result ok. Flowsic: clean up purge air unit-filter motor-transduce A & B. CEMS room: clean area CEMS room-filter cabinet MCS 100E-CEMS gas room from dirty of dust use instrument air supply ( RIZAL & ANDRI )
2026-07-31
2 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1 Continue project upgrade analyzer
Do continue project upgrade 463 2K1 and test signal result ok ( AGUS & DADANG )
2026-07-31
2 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1-&-L1C-TR1-&-L1C-TL1 WBI CM-L!C TR1-L3C RE1-BC coal transport
Do WBI area CM-truck lift-tripper-bc transport coal. Add grease for L1C BC4-L1C BC5-483 BL2 around 15 times-20 times-30 times for FS and LS. Test function sump pump L1C BC1 & L1C BC4 result normal-water spray  L1C BC5 & L1C BC6 & L1C BC7 & L63 HS1 result function normal ( EDI & ADI & UNJ AZRIEL )
2026-07-30
2 months ago
NR.EL-01 Wahyu Adi Triono 463-KL1 Repare + Install repare Blower Sheel Kiln
Install motor blower shell kiln 4 units- install cable motor blower shell kiln; install propeller motor blower. Do test function blower shell kiln result function normal. Bring down 1 motor shell kiln to workshop for rewinding ( JAJAT & AGUS & RIZAL & ADI & EDI & MUHAIMIN & ANDRI & DADANG & TRUBA TEAM & UNJ AZRIEL ) 
2026-07-29
2 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1 PMR service analyzer
 Clean up flange probe-probe-sample line tube-filter sample line-diaphragm pump-filter balston from dirty of dust coal use instrument air supply and water supply. Check function humidity sensor and filter humidity result function humidity sensor normal and filter good condition note replace gas cooler at L63 2K3 because bad condition replace use spare unit ( RIZAL & ANDRI )
2026-07-29
2 months ago
NR.EL-01 Wahyu Adi Triono 393-3B1-CLINKER-SILO PMR Motor Area Clinker
 Clean up motor area clinker silo from dirty of dust clinker use equipment cleaning tools. Measure vibration-noise and add grease motor 25 times for FS and LS ( DADANG & AIMAN )
2026-07-29
2 months ago
NR.EL-01 Wahyu Adi Triono -WORK-SHOP Upgrade analyzer ( activation power + testing signal )
Continue  activity wiring LCS and IO ( AGUS & MUHAIMIN )
2026-07-29
2 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP-PPUP Inspection electrical and welding tools of PPUP
Check inspection electrical and welding tools of PPUP. Do repare some tools and tagging equipment use blue color ( EDI & UNJ AZRIEL )
2026-07-28
2 months ago
NR.EL-01 Wahyu Adi Triono 483-PF1 Issue different reading
Adjust CF , reduce around  - 4 t/h ( RIZAL & JAJAT )
2026-07-28
2 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1 Upgrade analizer (Pulling cable 10 mm) estimation120 m ) fabrication- wiring termination cable 120 m )
Pulling cable   4 x 10 mm x 120 m -Done ( AGUS & RIZAL & MUHAIMIN & DADANG )
2026-07-27
2 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-2K1 PMR service analyzer
Clean up flange probe-probe-sample filter-sample line tube-diaphragm pump-filter balston from dirty of dust use instrument air supply. Check function humidity sensor and filter humidity result function humidity sensor good and filter humidity good ( RIZAL & ANDRI )
2026-07-27
2 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1-&-473-CC1-&-463-KL1 PMR critical motor CM & CC & KL
Clean up area motor-filter motor from dirty of dust use instrument air supply. Measure vibration-noise motor of FS and LS add grease motor 25 times for FS and LS. Check at ER4 and ER5 for RPM-Voltage-KW-Ampere-Temperature fill in at check sheet motor note replace AUTO grease tank at L63 MD1-L63 FN1 for FS and LS with spare unit ( MUHAIMIN & DADANG )
2026-07-27
2 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-443-PH1 PMR critical motor RM & PH
Clean up area motor-filter motor from dirty of dust use instrument air supply. Measure vibration-noise motor of FS and LS add grease motor 15 times for FS and LS. Check at ER3 and ER4 for RPM-Voltage-KW-Ampere-Temperature fill in at check sheet motor ( EDI & ADI & UNJ AZRIEL )
2026-07-24
2 months ago
NR.EL-01 Wahyu Adi Triono ER5 TPM Continue ER 5 bottom
Do TPM activity at ER5 bottom floor. Clean up room ER5 from dirty of dust use equipment cleaning tools ( JAJAT & AGUS & EDI & RIZAL & ADI & MUHAIMIN & ANDRI &  AIMAN & DADANG & UNJ AZRIEL )
2026-07-24
2 months ago
NR.EL-01 Wahyu Adi Triono BC-COAL-TRANSPORT Repare-activation water spray at L1C BC7, BC6, BC5
Check at location, L1C BC7: found power s/v off and valve water spray off. Do turn on power s/v and valve water spray  also adjust stick water spray result function water spray normal, L1C BC6 found valve water spray off action valve water off action on valve water and adjust stick water spray result function water spray normal. L1C BC5  found valve water spray off action open valve water spray function water spray normal ( EDI & ADI & DADANG )
2026-07-23
2 months ago
NR.EL-01 Wahyu Adi Triono 443-WI1-M3 Issue over load and motor trip, motor normal function
Check use megger of R-S-T to ground result 0.4 ohm note inside motor moist hit water from 443 WI1 M2. Install heater lamp at motor 443 WI1 M3 around 10 minutes reconnect cable R-S-T and do megger result 2 mega ohm. Test function motor 443 WI1 M3 result ampere meter 13-14 ( JAJAT & EDI & ADI & UNJ AZRIEL & DADANG )
2026-07-23
2 months ago
NR.EL-01 Wahyu Adi Triono 363-MD1-&-363-FN1-&-363-FN2 Observation noise motor
Check noise motor 363 MD1 of FS and LS  result LS around 2,4 gE add grease motor 15 times-FS noise  9.85 gE; 363FN1 noise LS and FS around 1.5 gE add grease motor 15 times; 363 FN2 noise motor LS 2,4 gE add grease motor  15 times-FS noise around 2.3 gE add grease motor 15 times ( CBM NAJIB & ADI & UNJ AZRIEL )
2026-07-23
2 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1 PMR service analyzer
Clean up flange probe-sample line tube-filter sample line-diaphragm pump-filter baslton from dirty of coal use instrument air supply and equipment cleaning tools. Check function humidity sensor and filter humidity result function humidity sensor normal and filter humidity good  ( RIZAL & ANDRI )
2026-07-22
2 months ago
NR.EL-01 Wahyu Adi Triono 423-FN1 Replace AUTO grease tank issue low level
Replace 3 unit AUTO grease tank because existing low level with spare unit ( EDI & ADI )
2026-07-22
2 months ago
NR.EL-01 Wahyu Adi Triono 443-2K2 Cleaning_ Service Filter
PMR service analyzer such as clean up flange probe-sample line tube-filter sample line-diaphragm pump-filter balston from dirty of dust use equipment cleaning tools and instrument air supply. Check function humidity sensor and filter humidity result function humidity sensor normal and filter humidity good ( RIZAL & ANDRI )
2026-07-22
2 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Support Team Safety for Tools Inspection
Do support team safety and student university at job training for inspection electrical and welding tools ( EDI & ADI & SAFETY JOKO & STUDENT  UNIVERSITY JOB TRAINING )
2026-07-22
2 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-L63-RM1 Add grease motor of 363 FN1-363 FN2-363 MD1-L63 MD1-483 BL5-483 BL9 issue noise motor high
Check actual noise  with CBM Mr. Najib at 363 FN2-363 FN1 of FS & LS result noise FN2 FS 2.42 gE-LS 1.81 gE-FN1 noise FS 0.85 gE-LS 0.94 gE add grease for FS 15 times of FS and LS at FN2-add grease 15 times for FS and LS at FN1; 363 MD1 check noise motor at  FS result 0.35 gE LS 2.4 gE add grease 15 times; check noise motor at L63 MD1 FS and LS add grease motor 20 times at LS and 15 times at FS; add grease motor 10 times at 483 BL5 for FS and LS; add grease motor 10 times for FS and LS at 483 BL9 ( EDI & ADI & NAJIB CBM )
2026-07-22
2 months ago
NR.EL-01 Wahyu Adi Triono IDO-TANK-&-L1C-BC1-&-L1C-BC4 WBI Elect & Ins & Check I/O CM,Sump T&T
Do WBI Elect & Ins & Check I/O CM, Sump T&T. Test function sump pump and clean up motor sump pump result function good and area motor clean note at area sump pump L1C BC4  dirty of coal need clean up ( EDI & ADI )
2026-07-21
2 months ago
NR.EL-01 Wahyu Adi Triono 423-2K1 PMR service CEMS
Clean up purge air unit motor and filter motor from dust use instrument air supply. Dust hunter: clean up flange with tube-swivel window T/R-R unit-alignment result normal function. Flowsic 100: clean up transducer A & B also flange from dirty of dust use equipment cleaning tools and instrument air supply. CEMS room: clean up CEMS room analyzer-filter cabinet 0f MCS 100E-CEMS gas room from dirty of dust use equipment cleaning tools and instrument air supply ( RIZAL & UNJ AZRIEL & ANDRI )
2026-07-21
2 months ago
NR.EL-01 Wahyu Adi Triono 363-FN1-&-363-FN2-&-L1C-TL1 Greasing motor noise 2.6 gE-2.9 gE. Vibrator not tight
Check actual noise with CBM team Mr. Najib found 363 FN2 for LS and FS below 2 gE but 363 FN1 for FS noise 2.5 gE add grease 15 times measure noise result 0.85 gE and for LS noise below 1 gE. Check noise at 363 MD1 for FS below 1 gE but LS 2.4 gE add grease 15 times measure noise 1.5 gE Check at location found support vibrator broken at round bar. Repare round bar by mechanic team result function vibrator normal ( EDI & ADI & DADANG & CBM NAJIB )
. 
2026-07-20
2 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1 Continue project upgrade analyzer
Do continue project upgrade 463 2K1 and install 3 LCS with canopy ( AGUS & MUHAIMIN )
2026-07-20
2 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-FN1-&-HYDRAULIC-ROOM Continue project upgrade 463 2K1- issue lighting lamp off Replace or install lighting lamp
Do continue project upgrade 463 2K1. Replace and install lighting lamp at 443 FN1 also hydraulic room test function lighting lamp result lighting lamp normal on ( RIZAL & UNJ AZRIEL & ANDRI & DADANG )
2026-07-20
2 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1-&-473-CC1 PMR Service Crit Motor & LSR KL & Cooler
Clean up area motor and filter motor. Measure vibration-noise of FS and LS, add grease motor 25 times- 30 times for FS and LS make vibration below 4 mm/s and noise below 2 gE. Check at ER5 and ER4 for RPM-KW-Voltage-Ampere-Temperature and fill in at check sheet ( MUHAIMIN & AGUS )
2026-07-20
2 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-443-PH1 PMR service critical motor LSR RM-CM
Clean up area motor and filter motor. Measure vibration-noise of FS and LS, add grease motor 15 times for FS and LS make vibration below 4 mm/s and noise below 2 gE. Check at ER3 and ER4 for RPM-KW-Voltage-Ampere-Temperature and fill in at check sheet ( EDI & ADI )
2026-07-17
2 months ago
NR.EL-01 Wahyu Adi Triono 443-PH1 Module no 4 DI station 74 Preheater Error
 Replace module and check power 24 VDC result normal indication at panel I/O also CCR ( JAJAT & MUAIMIN )
2026-07-17
2 months ago
NR.EL-01 Wahyu Adi Triono 433-BE1-&-433-SG8 Issue appear indication D4 & Issue stop kiln indication DO close still open
 Check limit switch and repare incline plat of 433 BE1 result normal indication.  Check limit switch and cylinder also indication open-close at CCR result in accordance ( AGUS & MUHAIMIN )
2026-07-17
2 months ago
NR.EL-01 Wahyu Adi Triono 463-MD1-&-473-FN7 Check or replace CB
Clean up carbon brush room from dirty of dust use instrument air supply. Check and replace carbon brush area 463 MD1 and 473  FN7 result 1 CB area 463 MD1 with spare unit because bad condition ( EDI & DADANG )
2026-07-17
2 months ago
NR.EL-01 Wahyu Adi Triono 453-PF1 Calibration zero and span ( reset all CF )
Do calibration dynamic zero and span for 453 PF1 result good ( RIZAL & UNJ AZRIEL & ANDRI )
2026-07-17
2 months ago
NR.EL-01 Wahyu Adi Triono 413-3B1-&-3B2 Clean up panel I/O
Clean up panel I/O of  413 3B1-413 3B1-panel  power supply-panel solenoid valve from dirty of dust use hand blower also equipment cleaning tools ( ADI & JAJAT )
2026-07-16
2 months ago
NR.EL-01 Wahyu Adi Triono 423-2K1 PMR service CEMS
Clean up area motor purge air unit and filter purge air unit-flange with tube of Dust Hunter-swivel window of Dust Hunter-alignment Dust Hunter result good-transducer A & B of Flowsic 100-CEMS room-CEMS gas room-filter cabinet MCS 100 E from dirty of dust use instrument air supply and equipment cleaning tools ( RIZAL & ANDRI )
2026-07-16
2 months ago
NR.EL-01 Wahyu Adi Triono L1C-TR1 issue cable drum frequently slip down
Clean up are cable drum and adjustment sensor result ok ( AGUS & MUHAIMIN & DADANG )
2026-07-16
2 months ago
NR.EL-01 Wahyu Adi Triono L63-BF1 Replace lighting lamp 1 each area L63 BF1
Replace 1 lighting lamp test function result good ( MUHAIMIN & DADANG )
2026-07-16
2 months ago
NR.EL-01 Wahyu Adi Triono PLANT-BUILDING-WORKSHOP Inspection electrical and welding tools Civil building
Do inspection electrical  and welding tools of plant building, tagging equipment blue color note repare some extention cable and portable lamp because cable ground not connected ( EDI & ADI & UNJ AZIEL )
2026-07-15
2 months ago
NR.EL-01 Wahyu Adi Triono L63-BF1 Replace lighting lamp 2 unit issue lighting lamp off
Replace 2 unit lighting lamp at L63 BF1 test function result lighting lamp on ( AGUS & MUHAIMIN & ANDRI & DADANG )
2026-07-14
2 months ago
NR.EL-01 Wahyu Adi Triono PANEL-INPUT-OUTPUT Station NL1 Node 2 error
 Data line broken because trouble at switch gear solved ( JAJAT & AGUS )
2026-07-14
2 months ago
NR.EL-01 Wahyu Adi Triono 443-CT1-&-463-2K1 Solenoid Valve Water no 19 , Issue Leaked
Replace membrane solenoid valve of water test function result  gun no 19 of water no leakage ( MUHAIMIN & ANDRI )
2026-07-14
2 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-443-PH1 PMR service critical motor LSR RM-CM
Clean area motor and filter motor also clean filter motor of 363 FA2 from dirty of dust use instrument air supply. Measure vibration-noise-temperature of FS and LS add grease motor 20 times and 25 times of FS and LS. Check KW-Ampere-Voltage-Temperature motor at ER3 and ER4 also fill in at check sheet ( AGUS & DADANG )
2026-07-14
2 months ago
NR.EL-01 Wahyu Adi Triono ROOM-VSD-WF-AND-AC Check cooling area VSD WF and AC
Check function cooling fan of area WF and AC result normal function. Clean up area room VSD area WF and AC note equipment tools are not available need make available make easy to clean up area vSD WF and AC ( ADI & AIMAN )
2026-07-13
2 months ago
NR.EL-01 Wahyu Adi Triono 473-FA6 Issue reading of N1 vibration low
Do replace sensor vibration and tighten sensor vibration result reading vibration 1.2 mm/s ( MUHAIMIN & UNJ AZRIEL & DADANG )
2026-07-13
2 months ago
NR.EL-01 Wahyu Adi Triono STATION-22 Pulling profibus cable station 22 to IKGA
Pulling cable profibus from IKGA to station 22 ( MUHAIMIN & ANDRI & DADANG & ADI )
2026-07-13
2 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1-&-473-CC1-&-463-KL1 PMR Service Crit Motor & LSR KL & Cooler & CM
Clean up area motor and filter motor. Measure vibration-noise-temperature of  FS and LS motor also add grease motor 25 times and 30 times. Check at ER4 and ER5 for RPM-Voltage-Ampere-KW-Temperature of motor and fill in at check sheet ( MUHAIMIN & UNJ AZRIEL & DADANG )
2026-07-13
2 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-2K1 PMR service analyzer
Clean up flange probe-probe-sample filter-tube sample line-diaphragm pump-filer balston from dirty of dust use equipment cleaning tools. Check function humidity sensor and filter humidity result function humidity sensor normal and filter good condition ( ADI & ANDRI )
2026-07-10
3 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Continue create station 23 analyzer. Fabrication structure control and station 423 2K1
Do fabrication structure control and station 423 2K1 result ok ( AGUS & MUHAIMIN & UNJ AZRIEL )
2026-07-10
3 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1 PMR service analyzer
Clean up flange probe-filter sample line-sample line-diaphragm pump-filter balston from dirty of dust coal. Check function humidity sensor and filter humidity result function humidity sensor normal and filter good condition ( RIZAL & EVE INDY &ANDRI )
2026-07-10
3 months ago
NR.EL-01 Wahyu Adi Triono 4D3-LA1 Install motor
nstall motor and rectifier test function result normal ampere motor 2.3 DC to 2.5 DC ( EDI & ADI & EVE ABY & EVE ELGI & DADANG )
2026-07-09
3 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Check test final wiring project 463 2K1-re installation wiring + Install
Testing  Wiring by life line + Install Fan  Blower ( AGUS & MUHAIMIN )
2026-07-09
3 months ago
NR.EL-01 Wahyu Adi Triono ER3-&-ER4-&-ER5-&-ER6 Inspection electrical room thermograph
Do inspection thermograph electric room 3-4-5-6 ( EDI & DADANG )
2026-07-09
3 months ago
NR.EL-01 Wahyu Adi Triono 423-2K1 PMR service CEMS
Clean up filter purge air unit-swivel window T/R and R of dust hunter-Flange with tube from dirty dust: clean up transducer A and B flowsic 100 from dirty dust. Clean up CEMS room-filter cabinet MCS 100E-CEMS gas room from dirty of dust use instrument air supply (RIZAL & ANDRI )
2026-07-09
3 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP-PINCURAN-MAS Inspection electrical tools
Do inspection electrical tools of PT Pincuran Mas. Tagging equipment with blue color. Repairing the cable ground of portable lamp 2 units, note : 1 extention cable not safe because 2 cover missing ( ADI & EVE ABY & EVE INDY )
2026-07-08
3 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Continue Project 463-2K1 Re-installation -wiring + Prepare New Station
Re installation and wiring also testing  result ok. Prepare of new station 60% ( AGUS & MUHAIMIN )
2026-07-08
3 months ago
NR.EL-01 Wahyu Adi Triono 463-KL1-&-443-PH1 PMR service analyzer
Do clean up flange probe-probe-filter sample line-sample line-diaphragm pump-filter balston from dirty of dust use instrument air supply. Check function humidity sensor and filter humidity result function humidity sensor good and filter humidity normal also dry ( RIZAL & EVE ABY & EVE INDY & CIVACON EMPLOYEE )
2026-07-08
3 months ago
NR.EL-01 Wahyu Adi Triono 443-PH1-&-463-KL1-&-BURNER-FLOOR PMR Service burner pyrometer-IR TAD temperature-T scanner-CCTV
Do clean up flange probe also lens Temperature IR TAD result  temperature 920 degree celcius-clean up lens of T scanner found before dirty of dust-clean up CCTV such as lens also camera unit form dirty of dust use equipment cleaning tools-clean up camera burner such as probe of camera, panel instrument air, panel control PLC, dryer oil and water from dirty of dust use hand blower and equipment cleaning tools note lens of t scanner east side cracked advice need to replace with spare unit ( ADI & EVE ELGI )
2026-07-07
3 months ago
NR.EL-01 Wahyu Adi Triono 423-2K1 Issue O2 high indication
Check at site do test gas of O2 result normal .Do monitoring O2 reading ( RIZAL & EVE INDY & ANDRI )
2026-07-07
3 months ago
NR.EL-01 Wahyu Adi Triono LA3-VA2 Prepare-install-fabrication replacement proportional valve
Replace Proportional Valve, test Normal ( RIZAL & EVE ABY & EVE INDY & ANDRI )
2026-07-07
3 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Complete form WBI and PMR month June 2026 + Create SOT for all team
Complete data check sheet PMR analyzer L63 2K1-L63 2K2-L63 2K3-483 2K1-463 2K1-443 2K1-423 2K1; PMR Hoist-Crane-PMR IR TAD-T Scanner-CCTV-Camera Burner-WBI electrical & instrumentation bottom blending_kiln_cooler_clinker silo-WBI electrical & instrumentation top blending_CT_PH_klin for month March to June 2026. Make SOT for month of July  2026 ( JAJAT & ADI & EVE ELGI )
2026-07-07
3 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Inspection electrical tools of PT Pincuran Mas
Do inspection electrical tools of PT Pincuran Mas. Tagging tools use blue color note 1 extention cable not safe because not full fill safety requirement SBI ( JAJAT &  ADI )
2026-07-07
3 months ago
NR.EL-01 Wahyu Adi Triono 4D3-LA1 Info control trafo failure and issue motor burned
Check voltage at transformer result value below. Replace transformer and do megger test result good. Install new transformer and do monitoring ( EDI & EVE ELGI & DADANG )
2026-07-06
3 months ago
NR.EL-01 Wahyu Adi Triono 423-BF1 Calibration and install pressure transmitter PDT 2001-2002
Do calibration zero and span for 423 PDT 2001 and 423 PDT 2002  with range pressure transmitter 0-20 mbar result drift good. Install pressure transmitter at site and check reading pressure result normal indication ( RIZAL & ADI & EVE ELGI & EVE INDY & ANDRI )
2026-07-06
3 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1-&-473-CC1 PMR Service Crit Motor & LSR KL & Cooler
Clean up area motor and filter motor from dirty of dust use instrument air Measure vibration-noise-temperature of FS and LS add grease motor for FS and LS 30 times and 25 times make vibration below 4 mm/s and noise below 2 gE. Check at ER5 and ER4 for data RPM-Voltage-Ampere-KW-Temperature motor and fill in at check sheet ( MUHAIMIN & DADANG )
2026-07-06
3 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-443-PH1 PMR service critical motor LSR RM-CM
Clean up area motor and filter motor from dirty of dust use instrument air Measure vibration-noise-temperature of FS and LS add grease motor for FS and LS 20 times and 25 times make vibrationbelow 4 mm/s and noise below 2 gE. Check at ER3 and ER4 for data RPM-Voltage-Ampere-KW-Temperature motor and fill in at check sheet. Also cleanup 363 FA2 of filter motor from dirty of dust use instrument air supply   ( EDI )
2026-07-06
3 months ago
NR.EL-01 Wahyu Adi Triono 423-BF1 Calibration and install pressure transmitter PDT 2001-2002 and install unit at site
Do calibration zero and span for 423 PDT 2001 and 423 PDT 2002  with range pressure transmitter 0-20 mbar result drift good. Install pressure transmitter at site and check reading pressure result normal indication ( RIZAL & ADI & EVE INDY & EVE ELGI & ANDRI )
2026-07-03
3 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1 PMR service analyzer
Clean up flange probe-sample line- filter sample line - diaphragm pump - filter balston from dirty of coal. Check function humidity sensor and filter humidity result function humidity sensor good and filter humidity normal condition ( EDI & DADANG )
2026-07-03
3 months ago
NR.EL-01 Wahyu Adi Triono 423-BF1 Calibration pressure transmitter and install calibration pressure
Do make addressing-unit-range of pressure transmitter. Calibration zero and span result good. Install pressure transmitter at site and cross check reading pressure at CCR result normal reading ( RIZAL & ADI & ANDRI & EVE ABY & EVE ELGI & AZRIEL UNJ )
2026-07-02
3 months ago
NR.EL-01 Wahyu Adi Triono L63-483-BL5-483-BL9-&-443-WP1-443-WP2MD1- Add grease motor. Check motor condition & test run
Add greasing motor for LS and FS for L63 MD1-483 BL5-483 BL9. Measure vibration-noise make below 4 mm/s and below 2 gE. Do check motor condition for 443 WP1 & 443 WP2 also test run ( EDI & DADANG )
2026-07-02
3 months ago
NR.EL-01 Wahyu Adi Triono 443-PH1-&-463-KL1- Inspection electrical and welding tools of PT Truba Jaga Cita
Do inspection electrical and welding tools of PT Truba Jaga Cita at 8th 443 Ph1 and 463 KL1 bottom floor tagging tools use blue color ( ADI & EVE ABY & EVE ELGI )
2026-07-01
3 months ago
NR.EL-01 Wahyu Adi Triono L1C-TL1 Install and fabrication box terminal pf L1C BC2 - cleaning control also RADIO LINK L1C TR1
Released Old Box + Install -reconnection   New Box Released old box and install new box also do reconnection ( JAJAT & EDI & DADANG & AIMAN )
2026-07-01
3 months ago
NR.EL-01 Wahyu Adi Triono 423-2K1-&-333-WF3 Install Fidor + Testing Sample & Issue Rate WF --0 t/h
Install + Calibration ---Done, result function FIDOR normal  Replace load cell - monitor note WF not calibration issue  material full( RIZAL & ANDRI & EVE ABY & EVE ELGI )
2026-06-30
3 months ago
NR.EL-01 Wahyu Adi Triono TRUBA-JAGA-CITA; Inspection electrical and welding tools
Do inspection electrical and welding tools of PT Truba Jaga Cita, note repare connection extention cable 2 units. Tagging tools with bule color ( ADI & EVE ELGI )
2026-06-30
3 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-2K1 PMR service analyzer
Clean up flange probe-probe-filter sample-sample line-diaphragm pump-filter balston from dirty of dust use instrument air supply. Check function humidity sensor and filter humidity result function humidity sensor normal and filter good condition ( RIZAL & EVE ABY & EVE ELGI & ANDRI )
2026-06-30
3 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1 Pulling cable from new I/O panel to room analyser
Do pulling cable from new panel I/O to 463 2K1 room of 6 cable and put at cable tray ( JAJAT & EDI & ADI & DADANG & 2 CIVACON )
2026-06-29
3 months ago
NR.EL-01 Wahyu Adi Triono 423-2K1 Issue reading O2 high
Check at site O2 reading high.. do calibration zero and span O2 run MCS100E reading O2 still high. Try disconnect FIDOR and also run MCS 100E reading O2 7-8%. Suspected s/v for zero gas FIDOR bad condition or dirty service s/v of zero gas FIDOR and install at site. Run MCS 100E result O2 reading still high. Not connected sample line FIDOR reading O2 7% note instrument air must be oil and water free suspected filter instrument air replace with spare unit ( RIZAL & EVE ABY & ANDRI )
2026-06-29
3 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-443-PH1 PMR service critical motor LSR RM-CM
Clean up area motor and filter motor. Measure vibration-noise-temperature FS and LS motor continue add grease motor 20 times and 15 times for FS and LS make vibration below 4 mm/s-noise below 2 gE also 363 FA2 at 363 MD1 filter motor. Check at ER3 and ER4 for RPM-Voltage-Ampere-Temperature motor and fill in at check sheet form ( EDI & ADI )
2026-06-29
3 months ago
NR.EL-01 Wahyu Adi Triono CM-&-KILN-&-CC1 PMR Service Crit Motor & LSR KL & Cooler
Clean up area motor and filter motor. Measure vibration-noise-temperature FS and LS motor continue add grease motor 25 times and 30 times for FS and LS make vibration below  4 mm/s-noise below 2 gE. Check at ER4 and ER5 for RPM-Voltage-Ampere-Temperature motor and fill in at check sheet form ( MUHAIMIN & DADANG )
2026-06-26
3 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Make notification for WBI Elect & Inst Feed bin-RM-CT-Dust Transport-BF
Do make notification for job WBI Elect & Inst  Feed bin-RM-CT-Dust Transport-BF ( ADI & EVE ELGI )
2026-06-26
3 months ago
NR.EL-01 Wahyu Adi Triono 363-MD1 Blower Cooling MC burn
Replace -Test Blower  ( AGUS & MUHAIMIN & DADANG )
2026-06-26
3 months ago
NR.EL-01 Wahyu Adi Triono L1C-TR1 PMR service analyzer
Clean up flange probe-sample line-filter sample line-diaphragm pump-filter balston from dirty of coal use instrument air supply and equipment cleaning tools. Check function humidity sensor and filter humidity result function humidity sensor good and filter humidity normal ( RIZAL & EVE ABY & ANDRI )
2026-06-26
3 months ago
NR.EL-01 Wahyu Adi Triono BLENDING-&-COAL-MILL-&-IDO-BIN WBI Elec & Ins & Check I/O & S Pump Bl-,C (Area Kiln
Do WBI Elec & Ins & Check I/O & S Pump Bl,-C  (Area Kiln ). Test sump pump L1C BC4 note area very dirty of coal dust need clean-L1C BC1 note area sump pump much dirty of coal need clean up-IDO bin-L63 HS1 result good function. Clean up I/O panel area clinker silo at bottom floor-area cooler-area kiln from dirty of dust use equipment cleaning tools (EDI & ADI )
2026-06-25
3 months ago
NR.SHIFT Wahyu Adi Triono 363-BE1-M1 Install transducer Amp
Replace transducer ampere at 363 BE1, do test function result ok ( EDI & MUHAIMIN & DADANG )
2026-06-25
3 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP-&-463-2K1 Prepare + Redrawing 463-2K1 Upgrade
Prepare upgrade 463 2K1 and redrawing at computer  ( AGUS & MUHAIMIN & DADANG & EDI )
2026-06-25
3 months ago
NR.EL-01 Wahyu Adi Triono 423-2K1 Issue O2 drift 16%
Do calibration zero and span for O2 result drift below 1% good ( RIZAL & EVE ABY & EVE ELGI & ANDRI )
2026-06-25
3 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Support TPM Document
Do make report of TPM for AM month June 2026 and safety finding 3 file continue print out and install at dash board TPM work shop ( RIZAL & ADI )
2026-06-24
3 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Prepare + Redrawing 463-2K1 Upgrade
Do redrawing upgrade 463 2K1 ( JAJAT & AGUS )
2026-06-24
3 months ago
NR.EL-01 Wahyu Adi Triono L3C-RE1 Install Power Point
Install power point at L3C RE1 continue painting support and canopy with grey color ( EDI & ADI & EVE ELGI )
2026-06-24
3 months ago
NR.EL-01 Wahyu Adi Triono 443-2K2-&-443-FN1-P1 Cleaning Sample Line and Filter sample line & issue draft low indication
Do cleaning sample line tube and filter sample line from dirty of dust use instrument air supply and equipment cleaning tools. Check at site found power common contact lose for 110 VAC  take power 110 VAC from 443 2K2 note  contact relay for purging result function purging normal ( MUHAIMIN & ANDRI & EVE ABY )
2026-06-23
3 months ago
NR.EL-01 Wahyu Adi Triono 333-BC1-&-363-SR1 Add grease motor issue high vibration and noise
Add grease motor of FS and LS measure vibration-noise for FS and LS result vibration below 4 mm/s and noise below 2 gE ( JAJAT & EDI )
2026-06-23
3 months ago
NR.EL-01 Wahyu Adi Triono L63-WF1 Issue contractor trip failure often exist
Check at site and do replace address for RUN result ok ( AGUS & JAJAT & MUHAIMIN )
2026-06-23
3 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1 Repare and fabrication travelling probe
Do fabrication of travelling probe continue install at site test function probe retract-inset result good ( RIZAL & DADANG )
2026-06-23
3 months ago
NR.EL-01 Wahyu Adi Triono 423-BF1-T3 Issue indication more high
Cross check indication temperature compare with CCR reading different do adjustment range at local make same with local value ( RIZAL & DADANG )
2026-06-22
3 months ago
NR.EL-01 Wahyu Adi Triono 413-BE1 Issue nut untighten
Do tighten nut of 413 BE1 result ok ( RIZAL & MUHAIMIN )
2026-06-22
3 months ago
NR.EL-01 Wahyu Adi Triono L63-WF1 Issue Trip Failure + hot are motor
 Tightening terminal-fabrication blower of cooling motor and install at site ( RIZAL & MUHAIMIN )
2026-06-22
3 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1-&-473-CC1-&-463-KL1-&-473-CC1 PMR Service Crit Motor & LSR KL & Cooler + Issue 473-FAA Issue Noise + Add greasing 473-FA4-5-6
Cleaning area motor and filter motor. Measure vibration-noise-temperature of FS and LS motor. Add grease motor 25 times-30 times of FS and LS. Check at ER5 and ER4 for RPM-Voltage-Ampere-kW-Temperature motor fill in at check sheet form. Add grease motor for FS and LS for 473 FAA measure noise motor below 2 gE also add grease motor for 473 FA4-FA5-FA6 for FS and LS measure vibration-noise of FS and LS result vibration below 4 mm/s and noise below 2 gE ( AGUS & DADANG )
2026-06-22
3 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-443-PH1&-393-RF4-&-393-SC3 PMR Service Critical Motor & LSR RM&CM1, Issue lighting lamp for 333 BC1 and bel feed separated-Cover Motor un connected-Speed Switch Failure
Cleaning area motor and filter motor. Measure vibration-noise-temperature of FS and LS motor. Add grease motor 15 times-20 times of FS and LS. Check at ER3 and ER4 for RPM-Voltage-Ampere-kW-Temperature motor fill in at check sheet form. Do separated power lighting lamp for 333 BC1 and bel feed test function result normal-Install cover motor for 393 RF4 result function normal- Do adjust position of probe speed sensor result normal error speed failure off( EDI & ADI )
2026-06-19
3 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Test run motor no load
Do test run no load of motor result normal ( AGUS & RIZAL & MUHAIMIN & ANDRI )
2026-06-19
3 months ago
NR.EL-01 Wahyu Adi Triono ER3 Connect cable DO from ABB to Yokogawa FABA
Check at ER3, continuity cable and wiring cable of DO at relay at panel I/O test function result ok ( JAJAT & EDI & FIRMAN & DADANG & ADI )
2026-06-19
3 months ago
NR.EL-01 Wahyu Adi Triono 483-BL9-M1 Issue overload
Check at site found finger bar burned, replace cable and pulling cable continue connected cable and terminated ( JAJAT & AGUS & EDI & RIZAL & ADI & ANDRI & MUHAIMIN & DADANG )
2026-06-19
3 months ago
NR.EL-01 Wahyu Adi Triono 443-2K2 Pulling cable of heater & modification contact
Do pulling cable power of heater  and modification contact heater at 443 2K2 result function normal ( AGUS & MUHAIMIN & DADANG )
2026-06-19
3 months ago
NR.EL-01 Wahyu Adi Triono BURNER-FLOOR Camera Kiln Abnormal View
Do dismantle camera kiln and clean up lens. Reinstall camera kiln result picture available at operator CCR ( JAJAT & RIZAL & ANDRI )
2026-06-18
3 months ago
NR.EL-01 Wahyu Adi Triono 483-BL9 Issue Hot Point
Install  Blower , Monitor  Max 80 Deg celcius - Monitor ( AGUS & MUHAIMIN )
2026-06-18
3 months ago
NR.EL-01 Wahyu Adi Triono 443-PH1-&-BURNER-FLOOR-&-463-KL1 PMR CCTV-IR TAD-T Scanner-Camera Burner
Do PMR CCTV-IR TAD-T scanner-camera burner. Clean up CCTV camera glasses- IR TAD probe glasses- T scanner camera glasses and camera burner probe also glasses from dirty of dust process use equipment cleaning tools and instrument air supply ( AGUS & MUHAIMIN )
2026-06-19
3 months ago
NR.EL-01 Wahyu Adi Triono 423-EP1-&-443-PH1-&-463-KL1 WBI Elec & Ins & Check I/O GCT, EP,PH&KL
Do WBI Elec & Ins & Check I/O GCT, EP,PH&KL. Measure vibration-noise motor and fill at check sheet high vibration motor up to 4 mm/s ( EDI & ADI )
2026-06-18
3 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-423-BF1-FFED-BIN WBI Electric & Ins & Check I/O Feed Bin
Do WBI Electric & Ins & Check I/O Feed Bin. Clean up area 423 BF1 room from dirty of dust use instrument air supply. Measure vibration-noise motor area 393 FA4-443 WP4,5,6-443 FN1-363 FN1-363 FN2-333 AC1& 333 SX1-333 AC2 & 333 SX2-333 WF1 to WF4-333 BC1-363 SR1-363 CV1 & CV2-363  LQ1 M1 & M2 note area motor dirty of dust  need clean up some motor vibration and noise high ( up to 4 mm/s-up to 2 gE ) ( ADI & DADANG )
2026-06-17
3 months ago
NR.EL-01 Wahyu Adi Triono 443-EL1-&-SUMP-PUMP PMR Elevator & WBI sump pump
Clean up elevator room door and top side-VSD room 8th floor  from dirty of dust use hand blower test function elevator form 8th to 1st floor result normal. Check function of sump pump at L63 HS1-IDO tank-L1C BC1-L1C BC4 note: L63 HS1 need install pipe conduit cable of cable power sump pump- IDO tank need clean up sump pump and install flow siwtch-L1C BC1 & L1C BC4 need clean up area from dirty of wet dust coal make performance sump pump good ( AGUS & ADI )
2026-06-17
3 months ago
NR.EL-02 Wahyu Adi Triono 463-2K1-&-333-WF4 Observation installation Circulation Valve LA3-VA4. & issue cooling fan of iron sand
Prepare material of installation circulation valve LA3 VA4 and install at site result ok Do replace cooling fan of iron sand test function motor  result good ( MUHAIMIN & DADANG & AIMAN )
2026-06-17
3 months ago
NR.EL-01 Wahyu Adi Triono 423-2K1 PMR service CEMS
Clean up purge air unit motor and filter motor. Dust Hunter: clean up flange with tube-swivel window-aligmment TR & R unit. Flowsic 100: transducer A & B. MCS 100 E: filter cabinet. FIDOR: filter cabinet. CEMS room & gas CEMS room: clean area from dirty of dusy use instrument air supply ( RIZAL & ANDRI )
2026-06-15
3 months ago
NR.EL-01 Wahyu Adi Triono BURNER-FLOOR Camera Kiln , IP No respond
Replace connector LAN for camera test function IP result normal and view camera available at computer CCR ( RIZAL & ANDRI )
2026-06-15
3 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-2K1 PMR service analyzer
Clean up flange probe-probe-filter sample line-sample line tube-diaphragm pump-filter balston from dirty of dust use instrument air supply. Check function humidity sensor and filter humidity result function humidity sensor normal and filter good condition ( RIZAL & ANDRI )
2026-06-15
3 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1-&-473-CC1 PMR Service Crit Motor & LSR KL & Cooler
Clean area motor and filter motor. Measure vibration-noise-temperature FS and LS motor add grease motor 25 times and 20 times for FS also LS. Check RPM-Voltage-Ampere-Temperature motor at ER5 and ER4 fill in at check sheet form ( EDI & DADANG )
2026-06-15
3 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-L63-CM1-463-KL1-473-CC1 PMR service critical motor LSR RM-CM
Clean area motor and filter motor. Measure vibration-noise-temperature FS and LS motor add grease motor 16 times and 15 times for FS also LS. Check RPM-Voltage-Ampere-Temperature motor at ER3 and ER4 fill ini at check sheet form ( EDI & ADI )
2026-06-12
4 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1 Reactivation automatic filling water
Do make reactivation for automatic filling water test function result normal also clean up filter motor compressor and filter sample line from dirty of dust use instrument air supply ( JAJAT & RIZAL & MUHAIMIN & ANDRI )
2026-06-12
4 months ago
NR.EL-01 Wahyu Adi Triono 443-PH1 Cross Check Lamp Area PH 2 and 3 floor
Replace cable power lighting lamp at 2nd floor at north side and replace lighting lamp  test function lighting lamp result normal  ( EDI & ADI & DADANG )
2026-06-11
4 months ago
NR.EL-01 Wahyu Adi Triono 443-WB2-M1 Issue unbalance ampere motor
Check at site found cable motor is not tighten, make tighten cable motor result ampere motor balance note install SOP check problem at motor ( JAJAT & MUHAIMIN & EVE FARAH )
2026-06-12
4 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Completely electrical Drawing 443-2K2
Do make drawing for electrical at 443 2K2 ( AGUS )
2026-06-11
4 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1 issue leakage O2
Check at site 443 2K1 found there is leakage tube at diaphragm pump to humidity sensor use silicone and isolation electrical to cover leakage of tube ( RIZAL & ANDRI )
2026-06-11
4 months ago
NR.EL-01 Wahyu Adi Triono FEED-BIN Issue level Tonnage Limestone Sensor error (Load Cell)
Do tighten cable power and output at sensor result indication normal ( JAJAT & MUHAIMIN & EVE FARAH )
2026-06-10
4 months ago
NR.EL-01 Wahyu Adi Triono 483-BU1&-363-HS2 Relocation sensor flow to calciner. Stop Local
Relocation flow sensor for Reference calibration. Repare Cable , Done ( EDI & DADANG )
2026-06-10
4 months ago
NR.EL-01 Wahyu Adi Triono L1C-TR1 Modification roof SW L1 BC4, repare all safety device-test safety device
Modification roof SW at L1C BC4 also repare all safety device area L1C BC1 to L1C BC7 and test function safety device result normal (JAJAT & AGUS & EDI & RIZAL & MUHAIMIN & ANDRI & DADANG )
2026-06-10
4 months ago
NR.EL-01 Wahyu Adi Triono 443-2K2 Activation lamp for collective fault
Do activation lamp  lamp of collective fault  ( MUHAIIN & ANDRI )
2026-06-09
4 months ago
NR.EL-01 Wahyu Adi Triono 443-2K2 Continue electrical drawing and test signal
Do drawing electrical continue test signal result normal ( AGUS & MUHAIMIN )
2026-06-09
4 months ago
NR.EL-01 Wahyu Adi Triono L3C-TR1 PMR Inspection Motor Area Tripper ( L1C_BC1 to BC7 ) and TLS
Do PMR motor area tripper for L1C BC1-L1C BC2-L1C BC3-L1C BC4-L1C BC5-L1C BC6-L1C BC7 and check TLS note cable gland for probe speed sensor at L1C BC1 & L1C BC3 not connected  action reconnected cable gland result ok-rope of TLS L1C BC4 east side not connected action reconnected rope of TLS-rope TLS north side L1C BC5 not connected action reconnected rope. Also check function of sump pump at L1C BC1 and L1C BC4 result function good ( EDI & ADI )
2026-06-08
4 months ago
NR.EL-01 Wahyu Adi Triono 483-FA2 Check vibration-noise of FS and LS
Measure vibration-noise FS and LS result vibration below 4 mm/s-noise below 2 gE add grease motor 10 times for FS and LS motor ( EDI & ADI & DADANG )
2026-06-08
4 months ago
NR.EL-01 Wahyu Adi Triono 443-2K2 Make programe off delay at LOGO around 2s for input 1-2-3
Do make program for off delay 2 second at LOGO for input 1-2-3 ( RIZAL & EVE ILHAM & UNJ AZRIEL )
2026-06-08
4 months ago
NR.EL-01 Wahyu Adi Triono 443-2K2 activation proximity level sensor signal N-M input to LOGO 110 VAC for output DC and labelling push button signal reset at 443 2K2-C1-ACK
Do activation proximity level sensor og signal N-M and labelling push button signal 443 2k2-C1-ACK result  ok ( MUHAIMIN & ANDRI )
2026-06-08
4 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP 443 2K2 re electric drawing upload to server manual book server
Redrawing of electrical for 443 2K2 and upload to server manual book ( AGUS )
2026-06-08
4 months ago
NR.EL-01 Wahyu Adi Triono 463-KL1- Support feed on for KILN
Do support feeding of 463 KL1 ( AGUS & RIZAL & EDI & ADI & MUHAIMIN & ANDRI & DADANG & EVE ILHAM &UNJ AZRIEL )
2026-06-08
4 months ago
NR.EL-01 Wahyu Adi Triono ROOM-DIESEL-PUMP Issue lighting lamp off
Check at location found cable phase and neutral joint, make different connection for cable phase and neutral, test function lighting lamp result normal lighting lamp on note replace MCB 10A ( EDI & ADI & DADANG )
2026-06-08
4 months ago
NR.EL-01 Wahyu Adi Triono 363-MD1-&-363-FA2 clean up CB room-filter motor 363 FA2-measure all CB replace if needed
Clean up 363 FA2 area motor and filter motor-area 363 MD1 and CB room from dirty of dust use instrument air supply and equipment cleaning tools. Measure long CB1 47.57-CB2 41.56-CB3 47.82-CB4 39.11-CB5 42.84-CB6 48.13-CB7 40.63-CB8 37.68-CB9 47.24-CB10 41.34-CB11  42.02-CB12 40.28 ( EDI & ADI & DADANG )
2026-06-07
4 months ago
NR.EL-01 Wahyu Adi Triono 423-BF1-&-L63-HS1-&-443-2K2-&-483-PF1-&-453-PF1 Issue zero value is big around 2.2 mbar. Recalibration for zero adjust-issue sump pump area many water or sump pump not working-rewiring cable for reset continue test function reset and alarm humidity-calibration zero and span
Check indication pressure of 423 BF1 PDT 2002 value 2.2 to 2.3 mbar same with CCR operator. Bring down pressure transmitter do zero adjustment result indication become 0.0 mbar output 4.00 mA. Install pressure transmitter at site result indication  0.1 mbar compare CCR around 0.2 mbar-Check at location area sump pump at L63 HS1 found there is no water and sump pump working normal-Do rewiring cable for reset at 443 2K2 continue test function result good also test function for alarm humidity result good-Do calibration zero at 483 PF1 with running blower and calibration zero-span for 453 PF1 with running blower result calibration good ( JAJAT & EDI & ADI & DADANG )
2026-06-07
4 months ago
NR.EL-01 Wahyu Adi Triono 423-BF1-PDT-2002-&-L63-HS1 Issue zero value is big around 2.2 mbar. Recalibration for zero adjust. Sump pump area many water or sump pump not working
Check indication pressure of 423 BF1 PDT 2002 value 2.2 to 2.3 mbar same with CCR operator. Bring down pressure transmitter do zero adjustment result indication become 0.0 mbar output 4.00 mA. Install pressure transmitter at site result indication  0.1 mbar compare CCR around 0.2 mbar. Check at location area sump pump at L63 HS1 found there is no water and sump pump working normal ( EDI & ADI & DADANG )
2026-06-04
4 months ago
NR.EL-01 Wahyu Adi Triono L63-SX1 Repare coupling Motor
Do dismantle motor L63 SX1 bring to workshop repare by mechanic team replace coupling motor ( JAJAT & ADI & MUHAIMIN & DADANG ) 
2026-06-04
4 months ago
NR.EL-01 Wahyu Adi Triono L63-3B1 Issue indication often not accurate
Replace radar sensor  ( RIZAL & ANDRI )
2026-06-03
4 months ago
NR.EL-01 Wahyu Adi Triono 423-BF1-&-443-2K1 Service JB 19 no 6 issue leakage & check addresing from CCR and create alarm to CCR
Make normal of JB 19 no 6 and monitoring. Input addresing new indicator of 443 2K1 and create program ( AGUS & MUHAIMIN & UNJ AZRIEL & DADANG & EVE  ILHAM )
2026-06-03
4 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1 PMR service analyzer
Clean up flange probe-sample line tube-filter sample line-diaphragm pump-filter balston from dirty of coal process. Check function humidity sensor and filter humidity result function humidity normal and filter humidity good condition ( RIZAL & ANDRI )
2026-06-03
4 months ago
NR.EL-01 Wahyu Adi Triono 483-BL5-&-483-BL9 Add grease motor
Do add greasing motor for FS and LS around 10 times and 20 times measure vibration-noise FS & LS: 483 BL9 2.6 mm/s-4.3 mm/s; 1.4 gE-5.02 gE ( EDI & ADI & EVE FARAH )
2026-06-02
4 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Make notification for job rewinding motor shell of kiln
Do make notification for job rewinding motor shell kiln: 463 FX5B-463 FX6-463 FX8-463 FX10 save at computer ( ADI & MUHAIMIN )
2026-06-02
4 months ago
NR.EL-01 Wahyu Adi Triono BURNER-FLOOR Reposition camera for view of fire
Do reposition camera burner for view fire result view fire available at computer operator ( RIZAL & MUHAIMIN & UNJ AZRIEL & ANDRI )
2026-06-02
4 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1-&-473-CC1-&-463-KL1 PMR Critical Motor Area KL + CM + CC
Clean up area motor and filter motor. Measure vibration-noise-temperature FS and LS motor. Add grease motor for 15 times-20 times for FS and LS motor. Check RPM-Voltage-Ampere motor-Temperature motor at ER4-ER5 write at form check sheet ( AGUS & DADANG )
2026-06-02
4 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-443-PH1 PMR Critical Motor Area RM
Clean up area motor and filter motor. Measure vibration-noise-temperature FS and LS motor. Add grease motor for 15 times-10 times for FS and LS motor. Check RPM-Voltage-Ampere motor-Temperature motor at ER3-ER4  write at form check sheet. Clean up area carbon brush room and filter 363 FA2 from dirty of dust use instrument air supply ( EDI & ADI )
2026-05-29
4 months ago
NR.EL-01 Wahyu Adi Triono 463-KL1 Check motor shell cooling fan
Check at site for 463 FX 5B-463 FX6-463 FX8-463 FX10 result motor burned because short ground. Replace breaker result normal ( RIZAL & MUHAIMIN )
2026-05-29
4 months ago
NR.EL-01 Wahyu Adi Triono 443-FN1 Install cable power for Power Point
Install conduit pipe of cable power, pulling cable power from welding panel inside water pump room to power point. Do wiring cable power ( AGUS & MUHAIMIN & DADANG )
2026-05-29
4 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP TPM Assessment & Report
Complete data for assessment report and print out install at TPM board at workshop ( RIZAL )
2026-05-29
4 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1 Check indication temperature roller of west side
Check at site for RTD roller coal mill measure resistance result 183 ohm. Rewiring cable RTD at cross check indication at CCR result around 83 degree celcius ( EDI & ADI & UNJ AZRIEL )
2026-05-28
4 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-443-PH1-&-L63-RM1 Install AUTO grease pump
Install AUTO Grease motor at 363 FN1-363 FN2-423 FN1-443 FN1-L63 MD1-L63 FN1 ( AGUS & DADANG )
2026-05-28
4 months ago
NR.EL-01 Wahyu Adi Triono 393-FA5 Replace bearing motor issue high noise
Check at site found bearing motor bad condition, replace motor with spare unit check ampere motor result 10 to 11 ampere ( EDI & MUHAIMIN & ANDRI )
2026-05-28
4 months ago
NR.EL-01 Wahyu Adi Triono IDO-TANK-&-L1C-BC1-&-L1C-BC4 WBI Elect & Ins & Check I/O CM,Sump T&T
Do clean up area sump from grass-leaf-coal use equipment cleaning tools. Test function sump pump local mode result sump pump work good water come out from tank sump pump Note grass at IDO tank already not tidy, need to tidy up grass  ( ADI & UNJ AZRIEL & EVE ILHAM & EVE FARAH )
2026-05-26
4 months ago
NR.EL-01 Wahyu Adi Triono 393-BE1 Issue speed failure at CCR operator
Check at site found probe speed sensor failure, replace probe speed use spare unit result speed indication normal ( JAJAT & MUHAIMIN & DADANG )
2026-05-26
4 months ago
NR.EL-01 Wahyu Adi Triono 443-PH1 Cross Check temperature Cyclone 4 north and south (Gas Material)
Cross check indication temperature at cyclone north and south for gas material compare with CCR. Adjust range at local same with indication at local ( RIZAL & ANDRI )
2026-05-26
4 months ago
NR.EL-01 Wahyu Adi Triono 333-MS1 Optional installation MS
Check actual motor at warehouses find 1 motor but different shaft motor. Continue check at FM warehouses find motor 22 KW and shaft motor 50.1 mm. Dismantle cover motor4 KW at workshop result all bearing failure and bad condition ( EDI & ADI )
2026-05-25
4 months ago
NR.EL-01 Wahyu Adi Triono 443-PH1-&-463-2K1 Certification Flow Diesel Calciner & Travelling probe not smooth
Do certification diesel oil at calciner. Repare support travelling probe test function insert and  retract probe result normal  ( RIZAL & UNJ AZRIEL & EVE AJI & ANDRI )
2026-05-25
4 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Prepare AUTO Grease tank
Do prepare Auto Grease tank at workshop ( AGUS & JAJAT )
2026-05-25
4 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1-&-473-CC1-&-463-KL1 PMR Critical Motor Area KL + CM
Clean up area motor and filter motor. Measure vibration-noise-temperature of FS and LS. Add grease motor for 25 times and 30 times for FS and LS motor. Check at ER4 and ER5 for RPM-Voltage-Ampere-Temperature for L63 MD1-L63 FN1-473 FN7-463 MD1  write at check sheet form ( MUHAIMIN & DADANG )
2026-05-25
4 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-443-PH1 PMR Critical Motor Area RM
Clean up area motor and filter motor. Measure vibration-noise-temperature of FS and LS. Add grease motor for 15 times and 10 times for FS and LS motor. Check at ER3 and ER4 for RPM-Voltage-Ampere-Temperature for 423 FN1-363 FN1-363 FN2-363 MD1-443 FN1 write at chek sheet form Note area 363 MD1 inside CB room very dirty of dust. Advice clean up employee not  use high pressure near filter 363 FA2 will make easy dirty of dust ( EDI & ADI )
2026-05-22
4 months ago
NR.EL-01 Wahyu Adi Triono 483-FA2 Recondition motor
Replace bearing motor, install at location test run motor measure vibration and noise of LS & FS motor result vibration below 4 mm/s and noise below 2 gE ( EDI & JAJAT & MUHAIMIN & DADANG )
2026-05-23
4 months ago
NR.EL-01 Wahyu Adi Triono 483-FA2 High vibration and noise motor
Measure vibration-noise-temperature result vibration 5.33 mm/s-noise 5.14 gE-temperature 45 degree celcius ( MUHAIMIN & DADANG )
2026-05-23
4 months ago
NR.EL-01 Wahyu Adi Triono 363-CV2 Issue speed failure
Check at location found  speed sensor bad condition, replace speed sensor with spare unit rewiring cable test run363 CV2 result normal ( AGUS & EDI & ADI & IMAN )
2026-05-23
4 months ago
NR.EL-01 Wahyu Adi Triono LA3-VA1 Install and fabrication vessel air tank
Do fabrication vessel air tank at workshop  and install vessel tank of air and  s/v water drain at vessel air tank and pulling cable power from welding panel test function water drain result good ( RIZAL & ANDRI )
2026-05-23
4 months ago
NR.EL-01 Wahyu Adi Triono L1C-BC4 Pulling cable powerpoint from L1C BC4 to L1C BC5. Install power point
Take cable power for power point at feed bin bring to location. Install power point panel at L1C BC4 and pulling cable power of power point from welding panel of L1C bC5 to panel power point continue termination at panel note prepare water for make safe area of welding power point ( JAJAT & AGUS & EDI & ADI & MUHAIMIN & DADANG & IMAN )
2026-05-22
4 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1 Support sample Line broken
Do repare support sample line test function insert and retract of probe result good  ( RIZAL & DADANG )
2026-05-21
4 months ago
NR.EL-01 Wahyu Adi Triono 483-FA2-M1 Ddismantle motor issue vibration motor high
Do dismantle motor at 483 FA2 M1  bring to workshop. Replace  bearing 4 each install motor at site  ( EDI & DADANG )
2026-05-21
4 months ago
NR.EL-01 Wahyu Adi Triono 453-PF1 Adjusment CF to 3 t/h Decrease
Do adjust CF at  maximal  note if still needed request adjust do calibration zero and span 453 PF1 ( RIZAL & UNJ AZRIEL )
2026-05-21
4 months ago
NR.EL-01 Wahyu Adi Triono WP3-WF1 Install lighting lamp
Install lighting lamp at WP3 WF1 test function lighting lamp result ok ( EDI & DADANG )
2026-05-20
4 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1-&-443-CT1 PMR service analyzer & issue high temperature
Clean up flange probe-sample line-filter sample line-diaphragm pump-filter balston from dirty of coal. Check humidity sensor and sensor humidity result function humidity sensor normal and filter good condition.  Cross check temperature result indication normal note still looking for of phenomenon build material ( RIZAL & ANDRI & UNJ AZRIEL & EVE ILHAM & EVE FARAH )
2026-05-19
4 months ago
NR.EL-01 Wahyu Adi Triono 423-BF1 Issue JB03 No 9 abnormal
Check at site. Do make all at normal position solenoid valve result function normal ( MUHAIMIN & DADANG )
2026-05-19
4 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-2K1-&-463-KR2-T2 PMR service analyzer Cross check or replace
Clean up flange probe- probe-filter sample line-sample line-diaphragm pump-filter balston from dirty of dust use instrument air supply. Check humidity sensor and filter humidity result function humidity sensor normal and filter good condition. Replace sensor RTD at 463 KR2 T2 result normal check indication at CCR reading normal( RIZAL & UNJ AZRIEL & ANDRI )
2026-05-19
4 months ago
NR.EL-01 Wahyu Adi Triono 493-AC2-&-493-AC3 Check AUTO Grease motor and replace if needed
Check Auto Grease motor 493 AC2 and 493 AC3 found low level at tank Auto Grease. Replace Auto grease with spare unit test function result normal. Note environment at 493 AC4 is not good condition and safety because many clinker at floor cover until junction box and cable power. Need action to clean up environment at 493 AC4 ( EDI & ADI )
2026-05-18
4 months ago
NR.EL-01 Wahyu Adi Triono 363-BE1-M2 Install motor
Install +Connected   Motor , test no load , Commissioning result normal ( MUHAIMIN & ANDRI & DADANG )
2026-05-18
4 months ago
NR.SHIFT Wahyu Adi Triono 423-2K1 PMR service CEMS and issue flame off at FIDOR
Check connection tube of  Hydrogren reset power result flame on. Clean up purge air unit motor and filter purge air unit  of Dust Hunter and Flowsic 100, clean up swivel windows T/R and R dust hunter-flange with tube-alignment dust hunter. Clean up transducer A & transducer B of flowsic, clean up up CEMS room and gas bottle-filter cabinet MCS 100 E from dirty of dust use equipment cleaning tools and instrument air supply (RIZAL & UNJ ASRIEL & EVE FARAH & ANDRI )
2026-05-18
4 months ago
NR.EL-01 Wahyu Adi Triono CAMERA-BURNER Issue Abnormal
Retighten connection of inside camera kiln and outside camera kiln. Insert camera kiln result normal ( MUHAIMIN & DADANG )
2026-05-18
4 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1-&-473-CC1 PMR Service Crit Motor & LSR KL & Cooler
Clean up area motor and filter motor, Measure vibration-noise-temperature of FS and LS motor. Add grease motor for 15 times-25 times for FS and LS motor. Also replace battery for AUTO grease motor at 473 FA2-473 FA3-473 FA9-473 FAA-483 FA2 and replace tube of AUTO grease motor at 473 FA6 found tube leakage. Also check 483 BL1-483 BL2-453 BL6-483 BL7 add grease motor for 15 times for FS and LS ( AGUS & ADI & EVE ILHAM )
2026-05-11
5 months ago
NR.EL-01 Wahyu Adi Triono BIN-SHALE Calibration bin shale
Do calibration bin shale result good ( EDI & MUHAIMIN & DADANG & TRUBA CEPI )
2026-05-11
5 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Complete data calibration RTD area RM-CC-Kiln-CM
Complete data check sheet calibration RTD area RM-CC-KL-CM of OH 2026, scan file save at computer and send to Mr.Jajat ( JAJAT & ADI )
2026-05-11
5 months ago
NR.EL-01 Wahyu Adi Triono 333-MS1 Issue motor abnormal function
Check at site, found motor bad condition.  Dismantle motor bring to work shop. Do clean up motor from dirty of dust and grease also oil ( AGUS & MUHAIMIN )
2026-05-11
5 months ago
NR.EL-01 Wahyu Adi Triono 443-PH1-&-393-RF6 Install sensor temperature at location. Issue oil come inside motor
Install sensor temperature at location cross check indication result normal indication. Dismantle cove motor and drain oil  from motor. Reinstall cover motor test run 393 RF6 result  function normal no oil come inside motor ( EDI & ADI & TRUBA CEPI )
2026-05-11
5 months ago
NR.EL-01 Wahyu Adi Triono 443-PH1&-393-RF6 Install sensor temperature at location. Issue oil come inside motor at 393 RF6
Install sensor temperature at location cross check indication result normal indication. Dismantle cove motor and drain oil  from motor. Reinstall cover motor test run 393 RF6 result  function normal no oil come inside motor ( EDI & ADI & TRUBA CEPI )
2026-05-10
5 months ago
NR.EL-01 Wahyu Adi Triono 393-BE1---473-FA6--473-FA7 Connected cable motor
Connected cable motor for 393 BE1 - 473 FA6 - 473 FA7 ( MUHAIMIN & CIVACON EMPLOYEE )
2026-05-10
5 months ago
NR.EL-01 Wahyu Adi Triono CCR-&-443-CT1 Cleaning all PC unit operator and replace s/v gun no 14 of air issue air leakage, check function gun 4 for water not function
Cleaning  PC of operator from dirty of dust use hand blower and vacuum cleaner. Replace S/V for air at gun no 14 issue leakage found existing  S/V membrane not available test function result ok no leakage air. Pulling cable at gun no4 for water because found voltage drop below 220 VAC ( JAJAT & EDI & ADI & TRUBA SUSILO )
2026-05-10
5 months ago
NR.EL-01 Wahyu Adi Triono 473-CC1 Pulling cable RTD of 473 FA5-473 FA3-473 FA6
Pulling cable RTD for 473 FA3- 473 FA5 and 473 FA6 check indication at CCR result good ( YOGA & DADANG & TRUBA NANANG )
2026-05-10
5 months ago
NR.EL-01 Wahyu Adi Triono 443-CX1 Pulling cable indication ( 120 m ) issue pressure low indication and activation I/O
Pulling cable result indication activation I/O result pressure normal indication ( RIZKY & CIVA IRMIS & CIVACON EMPLOYEE )
2026-05-10
5 months ago
NR.EL-01 Wahyu Adi Triono 453-PF1 Mechanical reposition slide gate make normal indication. Cleaning ventury cooler
Reposition slide gate and cleaning ventury cooler ( FAHRI & EVE SUPRIYADI & CIVACON EMPLOYEE )
2026-05-09
5 months ago
NR.EL-01 Wahyu Adi Triono ER5 Replace ampere meter - prepare replace battery of ER5 and connection cable
Replace ampere meter and battery at ER5  test function result good ( AGUS & FIRMAN & AIMAN )
2026-05-09
5 months ago
NR.EL-01 Wahyu Adi Triono 423-VA2 continue fabrication and test gate - ML
Fabrication of 423 VA2 and install at site test function gate - ML result ok ( RIZKY & CIVACON EMPLOYEE )
2026-05-09
5 months ago
NR.EL-01 Wahyu Adi Triono 473-CC1 Prepare pulling cable and re-installation cable RTD
Replace cable at 473 FA3 and reinstall sensor RTD at motor result indication normal ( YOGA & DADANG & TRUBA NANANG )
2026-05-09
5 months ago
NR.EL-01 Wahyu Adi Triono 473-HC1-&-443-FN1-&-473-FA6 Issue motor trip - connected sensor motor
Test  run 473  HC result ok. Connected sensor motor 443 FN1-473 FA6 test run no load 443 FN1 measure vibration and noise LS 7 FS result vibration below 4 mm/s and noise below 2 gE ( HARYANTO & MHAIMIN & CIVACON EMPLOYEE )
2026-05-09
5 months ago
NR.EL-01 Wahyu Adi Triono 473-CC1-&-463-KL1-&-L63-RM1 Calibration temperature RTD
Do calibration temperature RTD area Cooler-Kiln-Coal Mill ( EDI & ADI & TRUBA SUSILO )
2026-05-09
5 months ago
NR.EL-01 Wahyu Adi Triono ER3-&-ER4-&-ER5 Black out support process
Do support  black out process at ER3-ER4-ER5 ( JAJAT & AGUS & EDI &  RIZAL & ADI & MUHAIMIN & ANDRI & DADANG & FIRMAN & AIMAN )
2026-05-08
5 months ago
NR.EL-01 Wahyu Adi Triono RM-CC-CM Calibration temperature RTD area RM-Cooler-CM
Do calibration RTD area RM for 363 FN1-363 FN2; area Cooler: 473 FA1-473 FA2-473 FA-473 FA5-473 FA6-473 FA7-473 FA8 ( EDI & ADI & EVE AJI & UNJ ASRIEL )
2026-05-07
5 months ago
NR.EL-01 Wahyu Adi Triono 443-PH1-&-L63-RM1 Install motor and connect cable- alignment motor
Install service motor, alignment motor and connect cable motor ( AGUS & MUHAIMIN & EDI & CIVACON EMPLOYEE 7 PEOPLE & EVE SONY & TRUBA SUSILO & TRUBA NANANG )
2026-05-07
5 months ago
NR.EL-01 Wahyu Adi Triono WEST-AND-EAST-BLENDING Replace terminal unit at panel I/O
Do replace TU 17 units at east blending and 5 units at west blending. Clean up area panel I/O use hand blower from dirty of dust ( JAJAT & PENY & ADI & EVE SONIY & FIRMAN &  CIVA HERMAN )
2026-05-06
5 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Complete data calibration pressure transmitter OH Nr1
Do complete data check sheet calibration pressure transmitter  OH Nr1 and continue scan file send to Mr. Jajat ( JAJAT & ADI )
2026-05-06
5 months ago
NR.EL-01 Wahyu Adi Triono 473-FN7-&-MAIN-GATE-ACCESS-CONTROL Rrecheck connection cable power motor and add silicone for outside panel cable motor & Inspection electrical and welding tools
Recheck connection cable power at 473 FN7 and clean up area motor add silicone at panel cable motor. Inspection electrical and welding tools of PT Jantan Setia Sakti and PT Bintang Eka Sakti note 1 welding machine rejected because ground cable not connected. Tagging equipment with green color ( EDI & TRUBA SUSILO & TRUBA NANANG )
2026-05-04
5 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Calibration pressure transmitter area RM-CM-PH-CC for zero and span
Calibration pressure transmitter area cooler for zero and span ( ADI & EVE SUPRIYADI & EVE ZAHRA )
2026-05-04
5 months ago
NR.EL-01 Wahyu Adi Triono MAIN-GATE-ACCES-CONTROL-&-WORK-SHOP Inspection electrical and welding tools
Inspection electrical tools of Mechanic 1-Pincuran Mas-Plant Building tagging equipment with green color ( EDI & TRUBA SUSILO & TRUBA NANANG )
2026-05-03
5 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Calibration pressure transmitter for zero and span area Cooler
Calibration pressure transmitter for zero and span area Cooler-CM for 7 units note replace 2 transmitter because output mA not stable and output pressure not stable also replace resistance 200 ohm found bad condition ( ADI & EVE SUPRIYADI )
2026-05-03
5 months ago
NR.EL-01 Wahyu Adi Triono ER3-&-ER4 Support black out process. Measure MV-clean up VCB-VCS-DS. Regreasing VCB-VCS-DS
Support black out process at ER3 and ER4. Clean up trafo-VCB-VCS and DS from dirty of dust use hand blower and vacuum machine. Measure MV  at trafo ( JAJAT & AGUS & EDI & RIZAL & ADI & MUHAIMIN & ANDRI & DADANG & TRUBA SUSILO & TRUBA NANANG )
2026-05-01
5 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Calibration pressure transmitter area PH-RM-CC-CM
Calibration pressure transmitter for zero and span area cooler and pre heater Note: replace 1 pressure transmitter with spare unit because leakage pressure indication and output mA too big ( ADI & EVE SUPRIYADI & EVE ZAHRA )
2026-05-01
5 months ago
NR.EL-01 Wahyu Adi Triono MAIN-GATE-ACCES-CONTROL Inspection electrical and welding tools for contractor
Inspection electrical and welding tools of PT MBL - PT Truba Jaga Cita - PT Indoporlen Tagging equipment with green color ( JAJAT & ADI )
2026-04-29
5 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Calibration pressure transmitter area Cooler - Pre heater - Coal mill for zero and span process
Calibration pressure transmitter area cooler-pre heater- coal mill total 14 units for zero and span ( ADI & EVE AJI & EVE SUPRIYADI & EVE ZAHRA & UNJ ASRIEL )
2026-04-29
5 months ago
NR.EL-01 Wahyu Adi Triono MAIN-GATE-ACCES-CONTROL Inspection electrical and welding tools
Inspection electrical and welding tools of PT Quadro tagging equipment with green color ( EDI & TRUBA SUSILO & TRUBA NANANG )
2026-04-28
5 months ago
NR.EL-01 Wahyu Adi Triono MAIN-GATE-ACCES-CONTROL Inspection electrical and welding tools
Inspection electrical and welding tools of PT Quadro-PT MBL- PT BMC note repare cable connection vacuum pump because existing joint cable to single cable. Tagging equipment with green color ( EDI & ADI & TRUBA SUSILO & TRUBA NANANG )
2026-04-27
5 months ago
NR.EL-01 Wahyu Adi Triono MAIN-GATE-ACCES-CONTROL Inspection electrical and welding tools
Inspection electrical and welding tools of PT MBL- PT RMP note 1 cutting machine rejected because breaker not install and ground cable is not connected- PT Jantan Setia Sakti note 1 grinding machine rejected because start-stop is not function. All equipment tagging green color ( EDI & ADI & TRUBA SUSILO & TRUBA NANANG )
2026-04-26
5 months ago
NR.EL-01 Wahyu Adi Triono MAIN-GATE-ACCES-CONTROL--&-473-CC1 Inspection electrical and welding tools
Do inspection electrical and welding tools PT MBL-ADZALAMA-RMP_INDOPORLEN tagging green color note 2 cutting machine  RMP rejected because ground cable are not connected,  1 extention cable MBL rejected because  not full fill safety requirement SBI ( ADI 7 TRUBA SUSILO & TRUBA NANANG
2026-04-24
5 months ago
NR.EL-01 Wahyu Adi Triono TENT-OH Install lighting lamp
Do install 1 lighting lamp test function lighting lamp result normal ( RIZAL & ANDRI )
2026-04-24
5 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1 Issue O2 Abnormal. Replace O2 sensor
Replace O2 sensor test function sensor O2 with calibration zero and span result normal ( RIZAL & ANDRI )
2026-04-24
5 months ago
NR.EL-01 Wahyu Adi Triono 443-WP5-M1 Issue high noise replace bearing
Dismantle motor from site bring to work shop. Do replace bearing motor and installation motor at site ( AGUS & MUHAIMIN & DADANG )
2026-04-24
5 months ago
NR.EL-01 Wahyu Adi Triono MAIN-GATE-AND-WORK-SHOP Inspection electrical and welding tools
Do inspection electrical and welding tools of PT Jantan Setia Sakti tagging equipment green color. Inspection electrical and welding tools of Electrical Nr1 tagging equipment green color note repare 1 extention cable because ground cable is not connected ( ADI & TRUBA SUSILO & TRUBA NANANG )
2026-04-23
5 months ago
NR.EL-01 Wahyu Adi Triono 443-WP5-M1 Issue high noise up 2 gE
Discouple motor test run no load result high noise up 2 gE note need replace bearing motor ( JAJAT & AGUS & MUHAIMIN )
2026-04-23
5 months ago
NR.EL-01 Wahyu Adi Triono TENT-OH Install lighting lamp
Do Install lighting lamp tend OH  test function result lighting lamp on ( AGUS & MUHAIMIN & RIZAL & ANDRI & DADANG & EVE AJI )
2026-04-23
5 months ago
NR.EL-01 Wahyu Adi Triono SUPRA-&-TRUBA-JAGA-CITA Inspection electrical and welding tools
Inspection electrical tools of PT Supra and tagging equipment with green color. Inspection welding tools of PT Truba Jaga Cita for 21 units tagging green color. Inspection electrical and welding tools of Electrical 1 tagging green color ( EDI & ADI & TRUBA SUSILO 7 TRUBA NANANG )
2026-04-22
5 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Completly data TPM ER3
Do complete data TPM ER3 safe at computer and print out ( JAJAT & RIZAL )
2026-04-22
5 months ago
NR.EL-01 Wahyu Adi Triono 443-PH1-&-473-CC1 Repare-Replace lighting lamp
Fabrication and install new lighting lamp area 443 PH1 & 473 CC1   test function lighting lamp result good ( AGUS & MUHAIMIN & DADANG )
2026-04-22
5 months ago
NR.EL-01 Wahyu Adi Triono AFR-WORK-SHOP-&-TPE Inspection electrical and welding tools
Inspection electrical and welding tools of AFR work shop tagging green color. Inspection electrical tools of Total Prime Engineering note repare ground cable at extention cable because cable is not connected tagging equipment green color ( ADI & TRUBA SUSILO & TRUBA NANANG )
2026-04-21
5 months ago
NR.EL-01 Wahyu Adi Triono 443-PH1-&-L63-RM1 Repare-Replace Lamp
Fabrication and install new lighting lamp area PH and CM  test function lighting lamp result good ( AGUS & MUHAIMIN & DADANG )
2026-04-21
5 months ago
NR.EL-01 Wahyu Adi Triono FLOW-METER-DIESEL Support Calibration Flow meter diesel
Do support calibration for flow meter diesel result normal ( RIZAL & ANDRI & AIMAN )
2026-04-21
5 months ago
NR.EL-01 Wahyu Adi Triono INSPECTION-ELECTRICAL-AND-WELDING-TOOLS Mechanic 2 & Truba Jaga Cita & CBM
Inspection electrical and welding tools of mechanic II. Tagging green color note: repare connection cable at extention cable and welding cable. 1 portable lamp and 1 welding machine are not full fill safety requirement of plant. Inspection welding tool of PT Truba Jaga Cita tagging green color. Inspection electrical and welding tools of CBM note repare portable lamp ground cable connection and  cover of lamp tagging green color ( EDI & ADI & TRUBA SUSILO & TRUBA NANAG )
2026-04-20
5 months ago
NR.EL-01 Wahyu Adi Triono PYROMETER Issue often retract
Replace filter result monitoring still not good performance camera still stuck ( RIZAL & EVE AJI & ANDRI )
2026-04-20
5 months ago
NR.EL-01 Wahyu Adi Triono MAIN-GATE-ACCES-CONTROL-&-NECHANIC-2 Inspection electrical and welding tools
Check inspection tools of MEGA VOLT PERKASA, tagging with green color. Mechanic work shop Nr2 inspection electrical tools and welding tools tagging green color, note repare female connector of welding machine and cable welding minus and cable welding plus (continue) ( EDI & ADI & TRUBA ANIS & TRUBA AZIZ )
2026-04-20
5 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-2K1 PMR service analyzer
Clean up flange probe-probe-filter sample line-sample line-diaphragm pump-filter balston from dirty of dust use instrument air supply. Check function of humidity sensor and filter humidity result function humidity sensor normal and filter humidity good condition ( RIZAL & EVE AJI & ANDRI )
2026-04-20
5 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1-&-473-CC1 PMR Service Crit Motor & LSR KL & Cooler
Clean up area motor and filter motor from dirty of dust use instrument air supply. Measure vibration-noise-temperature of FS and LS also add grease motor of FS and LS for 25 times-30 times. Write KW-Voltage-Ampere-Temperature of motor at ER5 & ER4. Add grease for 333 BC1 issue high vibration up 4 mm/s and high noise up 2 gE ( MUHAIMIN & DADANG )
2026-04-20
5 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-443-PH1 PMR Service Critical Motor & LSR RM&CM1
Clean up area motor and filter motor from dirty of dust use instrument air supply. Also clean up filter 363 FA2 M1 from dirty of dust use instrument air supply. Measure vibration-noise-temperature of FS and LS also add grease motor of FS and LS for 15 times-25 times-30 times. Write KW-Voltage-Ampere-Temperature of motor at ER3 & ER4 ( EDI & ADI )
2026-04-17
5 months ago
NR.EL-01 Wahyu Adi Triono WF-LIMESTONE-&-W83-WF1 Activation power point front & Pulling cable power +Tagging Labeling
Do activation power point near WF limestone. Pulling cable power and continue tagging labelling of W83 WF1 ( AGUS & MUHAIMIN & DADANG )
2026-04-17
5 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1 PMR service analyzer
Clean up flange probe-sample line-filter sample line-diaphragm pump-filter balston from dirty of dust coal use instrument air supply. Check function of humidity sensor and filter humidity result function humidity sensor normal and filter good condition ( RIZAL & ANDRI )
2026-04-17
5 months ago
NR.EL-01 Wahyu Adi Triono 493-AC1 Repare slink position
Go to site found there is no slink available at site. Install slink spare together with nut  test  function slink result normal ( EDI & ADI )
2026-04-17
5 months ago
NR.EL-01 Wahyu Adi Triono ER5 Ware house ER5 cleaning area inside room
Clean up area ware house of ER5 use vacuum cleaner and equipment cleaning tools ( JAJAT & AIMAN )
2026-04-17
5 months ago
NR.EL-01 Wahyu Adi Triono ER3 GEMBA TPM ER3
Do clean up area inside ER3 at bottom side use equipment cleaning tools. also  clean stair beside ER3. Move ex MCS 100E to ER3 top floor ( JAJAT & AGUS & EDI & RIZAL & ADI & ANDRI & MUHAIMIN & DADANG )
2026-04-16
5 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Activation power point front of WF Limestone
Prepare power point ( RIZAL & EVE AJI & ANDRI )
2026-04-17
5 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Continue fabrication and prepare welding point out position L1C RE1
Prepare  welding point ( AGUS & MUHAIMIN )
2026-04-16
5 months ago
NR.EL-01 Wahyu Adi Triono 423-2K1 PMR service CEMS
Do clean up purge air unit motor and filter purge air unit-flange with tube of dust hunter-swivel window T/R + R unit-alignment dust hunter-transducer A+B flowsic 100+CEMS room-CEMS gas room-filter cabinet MCS 100E from dirty of dust use instrument air supply ( RIZAL & EVE AJI & ANDRI )
2026-04-16
5 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP-PPUP Inspection electrical and welding tools
Do inspection electrical and welding tools of PPUP work shop. Tagging equipment with green color ( EDI & DADANG )
2026-04-15
5 months ago
NR.EL-01 Wahyu Adi Triono L1C-RE1 Fabrication + prepare welding point outside
Fabrication panel of welding outside L1C RE1, install at location ( AGUS & MUHAIMIN & DADANG )
2026-04-15
5 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Report PMR and WBI
Complete data check sheet for PMR analyzer L63 2K1-L63 2K2-L63 @K3-483 2K1-463 2K1-443 2K1-423 2K1-PMR CCTV-Temperature IR TAD-T scanner-Camera Burner-PMR critical motor 363 RM1-443 Ph1-L63 RM1-473 CC1-463 KL1, WBI Elec & Inst Top Blending-CT-PH-KL, WBI Elec & Inst Feed Bin-RM-CT-Dust Transport-BF, WBI Elect & Inst CM-Truck Lift-BC Transport-Reclaimer Coal for month of April 2026 ( ADI )
2026-04-15
5 months ago
NR.EL-01 Wahyu Adi Triono 443-CT1-&-WINCI-IDO Check SV abnormal no 4 & 14 & issue failure
Replace S/V no 4 & 14 test function S/V normal. Check at location of motor result bad condition. Note replace motor with spare unit ( RIZAL & ANDRI )
2026-04-14
5 months ago
NR.EL-01 Wahyu Adi Triono 443-2K1 Issue low flow indication
Filter Sika Saturated, replace part  (Monitor ) Oke ( FIRMAN & RIZAL & DADANG )
2026-04-14
5 months ago
NR.EL-01 Wahyu Adi Triono 443-CT1 Issue Kiln Down from Temp High
Power  Bank 3 trip, check Solenoid VK  (No 16) short, Replace Part test from DO Jump (Normal) , Mitigasi 1 fuse - 1 solenoid (JAJAT & RIZAL )
2026-04-14
5 months ago
NR.EL-01 Wahyu Adi Triono 363-MD1 Support Motor recondition 363 MD1
 Support take and mobilization and document recondition motor 2400 KW to REMS ( AGUS & ANDRI & AIMAN )
2026-04-14
5 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-2K1 PMR service analyzer
Clean up flange probe-filter sample line-sample line-diaphragm pump-filter balston from dirty of dust use instrument air supply. Check function humidity sensor and filter humidity result function humidity sensor normal and filter good condition ( RIZAL & DADANG )
2026-04-14
5 months ago
NR.EL-01 Wahyu Adi Triono W83-WF1- Fabrication cable power and LCS
Pulling  cable  Control to  IO -LCS (6P x 1,5 mmx 4), Pulling cable control Power,  fabrication and install Control Panel, Prepare connecting  Control Side and IO side , fabrication and install  Ladder cable and LCS panel ( JAJAT & AGUS & EDI & ADI & MUHAIMIN & DADANG )
2026-04-13
5 months ago
NR.EL-01 Wahyu Adi Triono L1C-TR1 Repare Breake Motor ( Dismalting, fabrication, Setting )
Dismalting nut broken, Replace part  broken, setting gap,commisioning  (Normal) ( EDI & MUHAIMIN & ANDRI & DADANG )
2026-04-13
5 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-443-PH1,L63-RM1,473-CC1 PMR service critical motor LSR RM-CM & PMR Service Crit Motor & LSR KL & Cooler
Cleaning  Motor , cek Vibrasi/Temp   Motor Fill in Greate tube 363-FN1 /FN2.  Cleaning  Motor , cek Vibrasi/Temp   Motor ( AGUS & RIZAL & EVE AJI )
2026-04-10
6 months ago
NR.EL-01 Wahyu Adi Triono ER6 Fabrication cable ladder and cover tunnel ER6
Do  continue fabrication cable ladder of ER6 and cover tunnel. Install cable ladder and cover tunnel at ER6 ( MUHAIMIN & ANDRI & DADANG )
2026-04-10
6 months ago
NR.EL-01 Wahyu Adi Triono 453-PW2-&-4D3-SC4 Issue temperature Motor alarm & fabrication cover motor also install at site
Check at location there is no voltage 220 VAC, make jumper resistor for no 13-14, Note replace relay K-7 contact temperature  for 13-14 to make function normal. Painting cover motor with yellow color continue install for cover motor 4D3 SC4 at location ( JAJAT & RIZAL & EDI & ADI & AIMAN )
2026-04-09
6 months ago
NR.EL-01 Wahyu Adi Triono CKD-MOTOR Painting Area CKD Motor
Do painting area motor at CKD with yellow color ( JAJAT & AIMAN )
2026-04-09
6 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1 PMR service analyzer
Clean up flange probe-sample line-filter sample-diaphragm pump-filter balston from dirty of dust process use instrument air supply. Check function of humidity sensor and filter humidity result function humidity sensor normal and filter humidity good condition ( RIZAL & EVE AJI )
2026-04-09
6 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP-&-443-FN1 Continue Wiring control W83-WF1 & install panel power point
Do wiring control panel W83 WF1 and make hole for exhaust fan panel. Install panel of power point at 443 FN1 ( AGUS & MUHAIMIN )
2026-04-09
6 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Report PMR and WBI 30 Maret- 9 April 2026 (Re-Check)
Do complete data check sheet WBI grounding-arrester also make folder for WBI Electrical and Instrumentation Check I/O Sump pump Blending-Cooler-Coal Mill-Kiln ( JAJAT & ADI )
2026-04-08
6 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Report PMR and WBI 30 March - 8 April 2026
Do conplete data check sheet PMR analyzer-PMR hoist crane-PMR IR TAD-T scanner-CCTV-Camera burner-PMR critical motor Note make check sheet folder for WBI Elec & Inst & Check I/O & S. Pump Blending-Cooler-CM-Kiln also print out data check sheet ( JAJAT & ADI )
2026-04-06
6 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Prepare Wiring control FABA
Do wiring control WF of FABA ( AGUS & MUHAIMIN )
2026-04-07
6 months ago
NR.EL-01 Wahyu Adi Triono 483-BL1 Issue LS vibration 11 mm/s continue replace bearing and install motor
Replace bearing motor with use heater bearing. Install motor at site. Test function motor , measure vibration and noise motor result  vibration below 4 mm/s and noise below 2 gE ( AGUS & MUHAIMIN & ANDRI & DADANG & JAJAT & RIZAL )
2026-04-07
6 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-2K1 PMR service analyzer
Clean up flange probe-probe-filter sample line-sample line-diaphragm pump-filter balston from dirty of dust process use instrument air supply. Check function humidity sensor and filter humidity result function humidity normal and filer humidity good condition ( RIZAL )
2026-04-07
6 months ago
NR.EL-01 Wahyu Adi Triono TRUBA-JAGA-CITA; Inspection electrical and welding tools
Do inspection electrical and welding tools of PT Truba Jaga Cita tagging with green color. Note 3 extention cable are rejected because not  full fill requirement safety of plant total equipment electrical 18 units and welding 5 units ( EDI & ADI )
2026-04-06
6 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-443-PH1 PMR Service Crit Motor & LSR KL & Cooler
Clean up area motor and filter motor. Measure vibration-noise-temperature of FS and LS motor. Add grease for 20 times AND 25  times for FS and LS. Write KW-Ampere-Voltage at ER3 put at form check sheet ( MUHAIMIN & DADANG & EVE AJI )
2026-04-06
6 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1-&-473-CC1 PMR service critical motor LSR RM-CM
Clean up area motor and filter motor. Measure vibration-noise-temperature FS and LS motor. Write KW-Voltage-Ampere at ER4 & ER5 put at form check sheet. Add grease 25 times and 30 times for FS and LS ( AGUS & ANDRI )
2026-04-06
6 months ago
NR.EL-01 Wahyu Adi Triono PT-PINCURAN-MAS Inspection Tools Pincuran Mas
Check electrical tool of PT Pincuran Mas tagging with green color. Note repare connection extention cable and portable lamp ( EDI & ADI )
2026-04-03
6 months ago
NR.EL-01 Wahyu Adi Triono WF-FABA Support upgrade WF FABA
Relocation 2 panel I/O  station 21 & 31 from south side to north side of 333 WF5 also move power lighting lamp to  panel I/O west side of 333 WF5. Pulling cable for power VS and power control. Prepare control and test partial like function speed and LC ( JAJAT & AGUS & EDI & RIZAL & ADI & MUHAIMIN & ANDRI & AIMAN )
2026-04-02
6 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1 PMR service analyzer
Clean flange probe-sample line-filter sample line-diaphragm pump-filter balston from dirty of coal . Check function humidity sensor and filter humidity result function humidity sensor normal and filter good condition ( RIZAL & EVE CINDA & ANDRI )
2026-04-02
6 months ago
NR.EL-01 Wahyu Adi Triono ER6 Cleaning ER6 and MCC panel
DO clean up ER room and MCC panel also filter panel form dirty of dust use equipment cleaning tools. Also do vacuum room use vacuum cleaner also mop room ( AIMAN )
2026-04-02
6 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Continue Prepare Upgrade fabrication Control WF FABA & Report Bearing Support recondition motor
Prepare upgrade control WF FABA Do make report upgrade recondition motor( AGUS & MUHAIMIN )
2026-04-02
6 months ago
NR.EL-01 Wahyu Adi Triono CIVIL-BUILDING-WORKSHOP Check Tool Civil Building
Inspection electrical tools of Civil Building. Do repare connection portable lamp 2 each test run nomai, repare 1 each extention cable test run normal Note total equipment 25  tools tagging with green color ( EDI & ADI )
2026-04-01
6 months ago
NR.EL-01 Wahyu Adi Triono CKD Fabrication cover motor for area CKD - Continue Painting Yellow
Do repainting  7 cover yellow color  motor at CKD area ( ANDRI )
2026-04-01
6 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Continue Prepare Upgrade fabrication Control WF FABA
Do fabrication panel for upgrade WF of  FABA ( AGUS & MUHAIMIN )
2026-04-01
6 months ago
NR.EL-01 Wahyu Adi Triono L1C-BC4 Issue sump pump abnormal condition
Replace sump pump motor with spare unit, test function result sump pump still working abnormal suspected many coal inside water ( EDI & ADI )
2026-04-01
6 months ago
NR.EL-01 Wahyu Adi Triono L1C-BC4 Issue sump pump abnormal condition
Replace sump pump motor with spare unit, test function result sump pump still working abnormal suspected many coal inside water ( EDI & ADI )
2026-04-01
6 months ago
NR.EL-01 Wahyu Adi Triono ER4 Clean up ER and MCC panel
Clean up area Electric Room 4 bottom and top also MCC  panel and filter panel from dirty of dust use equipment cleaning tools and vacuum cleaner. Continue mop floor electric room top and bottom (AIMAN )
2026-04-01
6 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Complete form recondition motor by SBI and vendor and bearing support
Do complete data form of recondition motor from SBI and vendor and write bearing support of motor ( MUHAIMIN )
2026-04-01
6 months ago
NR.EL-01 Wahyu Adi Triono L1C-TR1-&-L3C-RE1 Clean Up Panel Control L1C-TR1, Radio Link, L3C-RE1
Do clean up panel control L1C  TR1- Radio Link and  L3C RE1 from dirty of dust coal use instrument air supply also clean up safety device-lighting lamp-LCS motor-panel welding from dirty of coal dust ( JAJAT & EDI & ADI )
2026-04-01
6 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1 PMR service analyzer
Clean up flange probe-sample line tube-filter sample line-diaphragm pump-filter balston from dirty of coal use instrument air supply. Check function of humidity sensor and check filter humidity result function humidity sensor normal and filter humidity good condition ( RIZAL & ANDRI )
2026-03-31
6 months ago
NR.EL-01 Wahyu Adi Triono 363-MD1 Issue Temp Winding T6 high > 128 Deg
Install blower, Cleaning  Filter 363 FA2 (Monitor temperature T6 = 114 deg) ( MUHAIMIN & ANDRI )
2026-03-31
6 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Prepare and fabrication control FABA ( info control at Mr.Yunus )
Take control at Mr.Yunus bring to workshop. Prepare control FABA at workshop ( AGUS & MUHAIMIN )
2026-03-31
6 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-2K1 PMR service analyzer
Clean up flange probe-probe-filter sample-sample line-diaphragm pump-filter balston from dirty of dust. Check function humidity sensor and filter humidity result function humidity normal and filter good condition ( RIZAL & ANDRI )
2026-03-31
6 months ago
NR.EL-01 Wahyu Adi Triono 413-3B1-&-3B2-&-473-CC1-&-463-KL1 WBI Elec & Ins & Check I/O & S Pump Blending, Cooler Area Kiln
Do WBI Elec & Ins & Check I/O & S Pump Bl,C Area Kiln. Do test function sump at IDO tank result function normal-L1C BC4 result can not start from LCS because manual function do clean up motor sump pump at workshop found much dirty of coal test function motor sump pump result normal take screning motor sump pump install at motor continue install location test function normal function-L1C BC1 result functon normal. Clean I/O panel area cooler and blending west and east-kiln from dirty of dust use equipment cleaning tools ( EDI & ADI )
2026-03-30
6 months ago
NR.EL-01 Wahyu Adi Triono WF-FABA Observation power for weigh feeder
Power VSD 333 WF5 take from W83 RF3 and for WP3 RF3 take from distribution power ( JAJAT & AGUS & MUHAIMIN )
2026-03-30
6 months ago
NR.EL-01 Wahyu Adi Triono 463-KL1 T Scanner Abnormal
 Check at local found stick limit switch broken, replace stick result monitor T scanner normal ( RIZAL & ANDRI )
2026-03-30
6 months ago
NR.EL-01 Wahyu Adi Triono 463-FXB-M1 Issue Stop Local
Check LCS result normal, check I/o module result abnormal, change address signal S test start result function motor normal ( JAJAT & MUHAIMIN & ADI )
2026-03-30
6 months ago
NR.EL-01 Wahyu Adi Triono CKD-MOTOR Fabrication cover motor for area CKD
Go to location measure motor at CKD for make cover motor. Do fabrication cover motor area CKD at workshop. Install 4 cover motor at site of CKD ( ANDRI & WIKAN )
2026-03-30
6 months ago
NR.EL-01 Wahyu Adi Triono 423-2K1 PMR service CEMS
Clean up purge air motor and filter motor-swivel windows T/R, R unit  also flange with tube of Dust Hunter also alignment Dust Hunter-transducer A & B of Flowsic-CEMS room-filter cabinet MCS 100 E-CEMS gas room from dirty of dust use instrument air supply. Replace H2 bottle for FIDOR continue calibration zero and span result normal ( RIZAL & EVE CINDA )
2026-03-30
6 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1-&-473-CC1 PMR Service Crit Motor & LSR KL & Cooler
Clean up area motor and filter motor from dirty of dust use instrument air supply. Measure vibration-noise-temperature FS and LS motor also grease motor for 20 times - 25 times for FS and LS motor. Write ampere-KW-voltage-temperature motor at ER4 & ER5 continue write at check sheet ( AGUS & MUHAIMIN )
2026-03-30
6 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-443-PH1 PMR service critical motor LSR RM-CM
Clean up area motor, filter motor from dirty of dust use instrument air supply. Measure vibration-noise-temperature of FS and LS motor. Add grease motor for 15 times and 20 times for FS and LS motor, Write ampere-KW-temperature-voltage motor at ER3 and ER4 continue write at check sheet note Carbon Brush no8 at 363 MD1 -1 need to replace with spare unit ( EDI & ADI )
2026-03-27
6 months ago
NR.EL-01 Wahyu Adi Triono ER5-&-423-2K1 Clean up ER5 and Cleaning Area Cems ( Report ALL ER period 26 Febuary and 27 March 2026)
Clean up ER5 top and bottom  made report Feb-March 2026 also do clean up 423 2K1 room analyzer ( AIMAN )
2026-03-27
6 months ago
NR.EL-01 Wahyu Adi Triono 493-3B1 Cleaning and Greasing Motor Area Clinker Silo
Cleaning Motor  493-AC1, AC2 ,AC3 also add grease motor ( ANDRI & DADANG )
2026-03-27
6 months ago
NR.EL-01 Wahyu Adi Triono 443-EL1 Issue door of elevator 5th abnormal
Cleaning All Door elevator test function elevator result normal note AC control elevator failure and push button inside elevator bad condition ( AGUS &  MUHAIMIN )
2026-03-27
6 months ago
NR.EL-01 Wahyu Adi Triono HRG Y43-1G1 Increase Setpoint to 75 %
Set HRG to 75% do monitor result normal function ( JAJAT )
2026-03-27
6 months ago
NR.EL-01 Wahyu Adi Triono FEED-BIN Observation relocation station area WF ( project upgrade WF FABA)
Do observation relocation station of area WF, check cable needed approximately cable needed enough if station move to 333 WF1. Also check cable at warehouse for 4 x 25 mm result cable are not available ( JAJAT & EDI & ADI )
2026-03-26
6 months ago
NR.SHIFT Wahyu Adi Triono HRG Y43-1G1 ( HRG Purifier (ELGA 2) , Issue Abnormal Level
Cleaning Sensor Level,   set to overflow do monitor setting 75% ( ADI & MUHAIMIN & ANDRI )
2026-03-26
6 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Prepare panel power point
Do prepare panel power point at work shop for 2 panel including wiring inside panel ( AGUS & DADANG )
2026-03-26
6 months ago
NR.EL-01 Wahyu Adi Triono 473-FA1 Issue grease outside tank
Check at location found tank grease bad condition make grease motor outside tank, replace tank of grease pump result grease motor function normal ( EDI & DADANG )
2026-03-26
6 months ago
NR.EL-01 Wahyu Adi Triono L63-2K1&-L63-2K2-&-L63-2K3-&-483-2K1-&-463-2K1-&-443-2K1 PMR service analyzer
Do clean up flange probe-sample line-filter sample line-diaphragm pump-filter balston-check function humidity sensor and filter humidity from dirty of coal result function humidity sensor normal and filter good condition note replace filter sample line for L63 2K2 with spare unit. Clean up flange probe-probe-filter sample line-sample line tube-diaphragm pump-filter balston from dirty of dust also check function of humidity sensor and filter humidity result function sensor humidity normal and filter humidity normal ( AGUS & MUHAIMIN & ANDRI )
2026-03-26
6 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-463-KL1-&-L63-RM1 WBI Switchgear, Cap & Trafo RM, KL & CM1
Do WBI WBI Switchgear, Capacitor & Trafo RM, KL & CM1, write result at form ( EDI & DADANG )
2026-03-26
6 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Complete data check sheet for WBI Elec & Ins & Check I/O GCT, EP,PH&KL (Report 24-3-26) & PMR CCTV, IR TAD & Kiln Scanner NAR1 (Report 23-3-26)
Do complete data check sheet for WBI Elec & Ins & Check I/O GCT, EP,PH&KL and PMR CCTV, IR TAD & Kiln Scanner NAR1 for date 23/3/26 and 24/3/26 at form also make report of SOT of march month  ( ADI & JAJAT )
2026-03-17
6 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Prepare fabrication support portable power point
Do fabrication support of panel power point at workshop ( ADI & ANDRI & DADANG )
2026-03-16
6 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-L63-RM1-&-463-KL1-&-473-CC1 PMR Service Critical Motor & LSR RM&CM1
Do clean up area motor and filter motor. Measure vibration & noise motor of FS and LS. Add grease 25 times-30 times- 15 times for FS and LS ( RIZAL & DADANG )
2026-03-16
6 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Report PMR /WBI periode 9- 13 March 2026
Do complete data check sheet PMR analyzer L63 2K1-:63 2K2-L63 2K3-483 2K1-463 2K1-443 2K1-423 2K1, PMR IR TAD-CCTV-T Scanner-Pyrometer, Critical motor 363 MD1-363 FN1-363 FN2-423 FN1-443 FN1-L63 MD1-L63 FN1-473 FN7-463 MD1-WBI Top blending-CT-PH-Kiln WBI Bottom Blending-Kiln-Cooler-Clinker Silo WBI CM-Truck Lift-Tripper-Reclaimer Coal and print out data check sheet 9 to 12 copies ( ADI )
2026-03-13
6 months ago
NR.EL-01 Wahyu Adi Triono MULTICYCLONE-RAW-MILL Panel welding multicyclone raw mill tapping power
Do make hole of power cable panel welding continue connected at panel welding, test output result ok ( AGUS & DADANG )
2026-03-13
6 months ago
NR.EL-01 Wahyu Adi Triono 363-MD1 Continue Power point at 363-MD1 ( Tapping Power )
Do connect cable power point of 363 MD1 at panel welding bottom cyclone raw mill test on measure output result normal ( EDI & ADI )
2026-03-13
6 months ago
NR.EL-01 Wahyu Adi Triono 363-FA2-&-363--MD1 clean up CB room and check all CB of long carbon brush and clean up 363 FA2 filter motor
Clean  up area motor 363 MD1 and carbon brush room from dirty of dust also clean 363 FA2 filter motor from dirty of dust use instrument air supply. Check long carbon brush found no 8 is to short replace carbon brush no 8 with spare unit ( EDI & ADI )
2026-03-13
6 months ago
NR.EL-01 Wahyu Adi Triono HRG-&-T-SCANNER-&-463-2K1 Y43-1G1 Prepare Running + Prepare Install-Cleaning ELGA unit (Continue)- Issue T scanner abnormal - Cooling system failure
 Replace fuse-install filter and UV lamp. Do replace-modification LS, result T scanner result view T scanner at operator normal. Replace RTD, tidy up cable result cooling system normal at analyzer 463 2K1  ( RIZAL & ANDRI )
2026-03-12
7 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Continue Prepare Upgrade Control
Do finishing wiring panel of upgrade control also put name of indication at front of panel ( AGUS & MUHAIMIN )
2026-03-12
7 months ago
NR.EL-01 Wahyu Adi Triono 363-MD1 Continue Power point at 363-MD1 ( Pulling cable and fabrication cable route )
Install pipe 2 inch for cable route from h-beam raw mill. Puling cable from welding cyclone raw mill to location power point at 363 MD1 also connected cable ( EDI & ADI & DADANG )
2026-03-12
7 months ago
NR.SHIFT Wahyu Adi Triono 473-FA9 Issue value draft abnormal
 Replace pressure transmitter  and setting parameter 130 mmH2O result indication draft back to normal at CCR operator. Fabrication support of pressure transmitter. Note  Beck actuator function normal but at blade mechanical not response  (RIZAL & EVE CINDA & ANDRI )
2026-03-11
7 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Continue Prepare Upgrade Control 443 2K1
Continue wiring cable inside panel  of upgrade panel 443 2K1 ( AGUS & MUHAIMIN )
2026-03-10
7 months ago
NR.EL-01 Wahyu Adi Triono 483-3B1 Issue signal proximity often bad. Replace proximity of gate bin
Do replace proximity for gate because existing signal error at CCR operator result after function normal ( RIZAL & ANDRI )
2026-03-11
7 months ago
NR.EL-01 Wahyu Adi Triono 443-2K1 Continue upgrade control
Continue wiring cable inside panel and install panel upgrade inside analyzer 443 2K1 room ( AGUS & MUHAIMIN )
2026-03-11
7 months ago
NR.EL-01 Wahyu Adi Triono 443-2K1 Cleaning and painting room of analyzer
Do clean up analyzer 443 2K1, and repainting floor with green color and door with yellow color ( JAJAT & AIMAN )
2026-03-11
7 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1 PMR service analyzer
Do clean up filter sample-flange probe-sample line-diaphragm pump-balston filter from dirty of coal use instrument air supply. Check function humidity sensor  and filter humidity result function humidity sensor normal and filter humidity good condition ( RIZAL & ANDRI )
2026-03-10
7 months ago
NR.EL-01 Wahyu Adi Triono 363-FN1-&-363-FN2 Cleaning Filter Issue Dirty - Control Alarm temperature
Clean Filter unit both of 363 FN1 and 363 FN2 result alarm temperature disappear ( EDI & DADANG )
2026-03-10
7 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Continue Prepare Upgrade Control 443 2K1
Continue do wiring panel of upgrade analyzer 443 2K1 ( AGUS & MUHAIMIN )
2026-03-10
7 months ago
NR.EL-01 Wahyu Adi Triono 423-2K1 PMR service CEMS
Clean up purge air unit motor and filter motor- flange with tube Dust Hunter-swivel windows of T/R also R-alignment Dust Hunter- transducer A & transducer B of Flowsic- CEMS room also filter cabinet MCS 100 E-CEMS gas room bottle form dirty of dust use instrument air supply ( RIZAL & ANDRI )
2026-03-10
7 months ago
NR.SHIFT Wahyu Adi Triono 483-FA2-&-483-BL7 Issue high noise up 2 gE
Add grease motor around 20 times for FS & LS also add grease motor 483 BL7 for LS 10 times and FS 8 times ( EDI & ADI )
2026-03-10
7 months ago
NR.EL-01 Wahyu Adi Triono 473-GQ1 Issue lighting lamp off at south side
Check at location, found lighting lamp off and cable power for lighting lamp is not connected to cable power input. Do reconnected cable power result lighting lamp normal operation ( EDI & ADI & DADANG )
2026-03-09
7 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Continue Prepare Upgrade Control 443 2K1
Do revision drawing of upgrade control analyzer 443 2K1 and print out file drawing of upgrade control analyzer 443 2K1 ( AGUS & MUHAIMIN )
2026-03-09
7 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-2K1 PMR service analyzer
Clean up flange probe-probe-sample line-diaphragm pump-filter balston from dirty of dust process. Check function of humidity sensor and filter humidity result function sensor normal and filter humidity good condition. Note replace filter sika at analyzer 463 2K1 and do calibration zero gas and span gas result calibration ok( RIZAL & EVE CINDA & ANDRI )
2026-03-09
7 months ago
NR.EL-01 Wahyu Adi Triono 463-KL1-&-473-CC1 PMR Service Critical Motor & LSR
Clean up area motor-filter motor from dirty of dust use instrument air supply. Measure vibration-noise-temperature for FS and LS motor. Add grease from 25 times-30 times for FS and LS. Write  RPM-Voltage-Ampere-Temperature motor and bearing at electric room 4 and electric room 5 ( MUHAIMIN & DADANG )
2026-03-09
7 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-L63-RM1 PMR Service Critical Motor & LSR
Clean up area motor-filter motor from dirty of dust use instrument air supply. Measure vibration-noise-temperature for FS and LS motor. Add grease from 15 times-20 times-30 times for FS and LS. Write RPM-Voltage-Ampere-Temperature motor and bearing at electric room 3 and electric room 4 Note there alarm at 363 FN1 because temperature 112 degree C at MICOM ( EDI & ADI )
2026-03-06
7 months ago
NR.SHIFT Wahyu Adi Triono WORK-SHOP Continue Prepare Upgrade Control
Wiring  Control Local  ( AGUS & MUHAIMIN )
2026-03-06
7 months ago
NR.EL-01 Wahyu Adi Triono L63-BF1 Observation replace diaphragm
Replace diaphragm L63 BF1 ( RIZAL & ANDRI & DADANG )
2026-03-06
7 months ago
NR.EL-01 Wahyu Adi Triono 473-DB1&-473-FA4 Repare cable Connection safety device and repare cable Connection Thermocouple
Repare and Cleaning result ok ( RIZAL & ANDRI & DADANG )
2026-03-06
7 months ago
NR.EL-01 Wahyu Adi Triono ER3-&-ER4-&-ER5-&-ER6 PMR Load MCC and UPS
Do PMR load MCC and UPS at ER3-ER4-ER5-ER6 ( EDI & ADI )
2026-03-05
7 months ago
NR.EL-01 Wahyu Adi Triono 433-BE1-&-443-2K1 Issue D5 Warning and Failure and observation due contamination of water
Check at location, replace contact kit BD 5 of 433 BE1. Do replace pump of dryer gas at 443 2K1, monitor reading O2 and CO2 for probe 1 and probe 2 result reading gas of O2 and CO normal as process ( RIZAL & EVE CINDA & ANDRI )
2026-03-05
7 months ago
NR.EL-01 Wahyu Adi Triono 393-SC5 Observation issue Abnormal (Signal S dan Speed Monitor)
Check 393 SC5 at location, do clean up probe of motion test simulation  result normal indication signal S and speed monitor ok at CCR operator ( EDI & DADANG )
2026-03-05
7 months ago
NR.EL-01 Wahyu Adi Triono CIVIL-BUILDING-WORKSHOP Repare lighting lamp off
Do wiring cable power of lighting lamp 6 units, test result lighting lamp normal ( JAJAT & ADI )
2026-03-04
7 months ago
NR.EL-01 Wahyu Adi Triono 463-KL1 Support Heating up + Feeding
Do support heating up process and feeding kiln ( JAJAT & ADUS & RIZAL & EDI & ADI & MUHAIMIN & ANDRI & DADANG )
2026-03-04
7 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Prepare Audit API 2026
Numbering File-File at file box and name file at panel ( JAJAT & ADI )
2026-03-04
7 months ago
NR.EL-01 Wahyu Adi Triono 443-2K1 Line Purging broken and issue reading O2 high
Repare-Welding join piping, create valve drain  pressure pump leaked, repared, normal ( RIZAL & ANDRI )
2026-03-04
7 months ago
NR.EL-01 Wahyu Adi Triono ER3 Prepare Panel IO station N31 (Dismantling Panel ER 3 bottom )
Dismantling Panel Ex-Sick and LR ( EDI & EVE CINDA & DADANG )
2026-03-04
7 months ago
NR.EL-01 Wahyu Adi Triono 363-FN1 Prepare power point
Tapping Power From welding point transport 423-F1 ( EDI & DADANG )
2026-03-02
7 months ago
NR.EL-01 Wahyu Adi Triono L93-3B1 Issue level abnormal
Check at location, do clean up load cell result indication level normal ( RIZAL & MUHAIMIN & EVE CINDA )
2026-03-02
7 months ago
NR.EL-01 Wahyu Adi Triono BURNER-FLOOR Prepare and calibration of flow diesel
Do calibration flow diesel with drop test result  good ( RIZAL & MUHAIMIN & EVE CINTA )
2026-03-02
7 months ago
NR.EL-01 Wahyu Adi Triono 393-SC8 Prepare and install indication ampere
Do prepare CT at workshop 50/5A, and wiring cable for CT at workshop and install CT 50/5A at ER3 for 383  SC8 and wiring cable output at panel I/O at ER3 result indication ampere normal ( JAJAT % EDI & ADI & DADANG )
2026-02-27
7 months ago
NR.EL-01 Wahyu Adi Triono 433-BE1-&-393-BE1 Fabrication and install cover motor
Do fabrication cover of motor 393 BE1 -433 BE1 and install at location ( EDI & MUHAIMIN & DADANG )
2026-02-27
7 months ago
NR.EL-01 Wahyu Adi Triono 463-KL1 Issue shell cooling failure
Check at location found cable power is not long enough, also measure resistance cable found bad result. Replace connector cable power motor with spare result motor shell cooling fan function normal ( EDI & MUHAIMIN & DADANG )
2026-02-27
7 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Prepare document for AUDIT API
Complete data file for calibration RTD year 2025, PMR Service Analyzer-PMR IR TAD-CCTV-Tscanner-Camera Burner-PMR Critical Motor of 363 RM1-443 PH1-L63 RM1-473 FN7-463 KL1-PMR Clean Electric Room of 3-4-5-6 for year 2025 and 2026 and print out data PMR clean up ER3-ER4-ER5-ER6 ( JAJAT & ADI )
2026-02-27
7 months ago
NR.EL-01 Wahyu Adi Triono ER6 TPM Gemba 5R
Do install sign safety for assembly point 2 each outside ER6-Evacuation Route 4 each inside ER6-Equipment cleaning tools 2 each inside ER6. Accompany assessment at dash board TPM ER6 at work shop ( RIZAL & ADI & AIMAN )
2026-02-27
7 months ago
NR.EL-01 Wahyu Adi Triono 313-3B1 Continue level silo east blending error
Do reposition of level sensor and rewiring cable sensor also data, result level same with operator CCR expected ( RIZAL & ANDRI )
2026-02-26
7 months ago
NR.EL-01 Wahyu Adi Triono 393-3S1 Issue level blending silo error
Do dismantle level sensor and clean up sensor reinstall level sensor result indication available at CCR ( RIZAL & MUHAIMIN & EVE CINTA & ANDRI )
2026-02-26
7 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP-MECHANIC-1 Prepare TPM ER6 report
Do prepare report of TPM ER6, print out sign Catatan GEMBA  5R and VOM get sign from Mr.Jajat, Mr. Heri Setiawan and Mr. Safrin and put at dashboard TPM at work shop ( JAJAT & RIZAL & ADI )
2026-02-26
7 months ago
NR.EL-01 Wahyu Adi Triono L63-MD1-AND-MOTOR-20-KW Issue noise at L63 MD1
Add grease motor at L63 MD1 measure noise result below2 gE. Do add grease motor of 20 KW measure vibration and noise result normal vibration below 4 mm/s and noise below 2 gE ( AGUS )
2026-02-26
7 months ago
NR.EL-01 Wahyu Adi Triono 423-2K1 PMR service CEMS
Clean up purge air unit motor and filter motor, swivel window of Dust Hunter do alignment Dust Hunter, transducer A and transducer B of Flowsick, CEMS room gas bottle area, CEMS room. filter cabinet MCS 100 E from dirty of dust process use instrument air supply ( RIZAL & MUHAIMIN & ANDRI )
2026-02-26
7 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1 PMR service analyzer
Clean up filter sample-sample line-diaphragm pump-filter balston from dirty of coal. Check function humidity sensor and filter humidity result function humidity normal and filter sensor good condition ( EDI & EVE CINTA & DADANG )
2026-02-25
7 months ago
NR.EL-01 Wahyu Adi Triono 363-FN1 Temperature T6 , issue High indication
Install Blower 2 side result temperature normal at CCR operator ( EDI & AGUS )
2026-02-26
7 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP-MECHANIC-1 Prepare TPM Assesment
Do prepare report TPM ( RIZAL )
2026-02-25
7 months ago
NR.EL-01 Wahyu Adi Triono ER3 Issue AC Robicon issue hot around 36 degree C
Monitor, team Karteksi repare piping Leaked, Add Gas Freon result AC function normal and temperature normal ( JAJAT & AGUS )
2026-02-26
7 months ago
NR.EL-01 Wahyu Adi Triono 393-SC3 Prepare installation indication of ampere
 Install ampere unit, result view at operator CCR good ( AGUS & MUHAIMIN & DADANG )
2026-02-25
7 months ago
NR.EL-01 Wahyu Adi Triono 443-BE1-&-393-BE1 Add grease motor
Add Grease, result vibration below 4 mm/s. Do monitor vibration motor ( EDI )
2026-02-25
7 months ago
NR.EL-01 Wahyu Adi Triono 463-FA-E Issue motor ground replace position motor fan of stand by
Do activation motor spare result function motor normal ( JAJAT & AGUS & MUHAIMIN & DADANG )
2026-02-25
7 months ago
NR.EL-01 Wahyu Adi Triono 443-2K1 PMR service analyzer
Clean filter sample-sample line-diaphragm pump-filter balston. Check function humidity sensor and filter humidity result function humidity sensor normal and filter good condition ( RIZAL & EVE CINTA & ANDRI )
2026-02-24
7 months ago
NR.EL-01 Wahyu Adi Triono 443-CT1-T2 Indication temperature low
Check temperature with portable sensor result indication around 96 degree C to 102 degree C compare at CCR indication temperature 45 degree C. Dismantle sensor T/C found very dirty with hard dust and do clean up sensor continue install result indication temperature same between local at CCR ( JAJAT & RIZAL & ANDRI & MUHAIMIN )
2026-02-25
7 months ago
NR.EL-01 Wahyu Adi Triono CAMERA-BURNER Issue view is not available at CCR operator
Dismantling camera, service all lens and room of camera kiln. Install camera kiln at location result view of camera available at operator CCR ( RIZAL & ANDRI )
2026-02-25
7 months ago
NR.EL-01 Wahyu Adi Triono T-SCANNER Dotted line view at CCR operator
Do replace limit switch, result view normal monitoring view at CCR ( EDI & DADANG )
2026-02-24
7 months ago
NR.EL-01 Wahyu Adi Triono 3B1-W.PV- Issue level indication error
Do service connection cable sensor and clean up sensor result function level sensor normal ( RIZAL & MUHAIMIN &  ANDRI & DADANG )
2026-02-24
7 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Ex 393-FA6 Service motor replace bearing
Bearing  housing broken when try to open use tool ( MUHAIMIN & ADI & EDI )
2026-02-24
7 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1 , Service analyser Unit
Do Service  sample point analyzer ( EDI & ADI & MUHAUMIN )
2026-02-24
7 months ago
NR.SHIFT Wahyu Adi Triono LA3-VA1 Proportional Valve Error
Replace Proportional Valve , Setting Actual Position, Setting  Actual vs Set point result setting and actual position ok ( RIZAL & ANDRI & DADANG )
2026-02-24
7 months ago
NR.EL-01 Wahyu Adi Triono 363-SR1 Issue indication temperature low at CCR
Repare  connection (Monitor) ( RIZAL & ANDRI )
2026-02-23
7 months ago
NR.EL-01 Wahyu Adi Triono 463-KL1- Support heating up process
Support process heating up of kiln ( RIZAL & ANDRI & JAJAT & EVE CINTA )
2026-02-23
7 months ago
NR.EL-01 Wahyu Adi Triono 393-FA6 Replace motor
Bring motor spare from ware house electric at ER5 to 8th floor. Dismantle existing motor and install motor spare do test run result function motor normal. Measure ampere 6.3 A and measure vibration-noise-temperature A-H-S for FS and LS result normal indication ( JAJAT & AGUS & MUHAIMIN & EDI & RIZAL & ADI & ANDRI & DADANG )
2026-02-23
7 months ago
NR.EL-01 Wahyu Adi Triono 413-BF2 Replace PLC Siemens issue failure of PLC
Do replace PLC SIEMEN of 413 BF2, test run function normal ( RIZAL & ANDRI & EVE CINTA )
2026-02-23
7 months ago
NR.EL-01 Wahyu Adi Triono 363-MD1 Clean up carbon brush and measure actual condition of carbon brush
Do clean up carbon brush room and slip ring use instrument air supply. Continue clen up slip ring use contact cleaner. Check and measure actual long  result still good ( EDI & ADI & DADANG )
2026-02-20
7 months ago
NR.EL-01 Wahyu Adi Triono 393-SGD-393-SGE-393-SGF Dismantling solenoid valve
Dismantling solenoid valve for slide 3 unit bring to work shop ( JAJAT & EDI & ADI )
2026-02-20
7 months ago
NR.EL-01 Wahyu Adi Triono 443-FN1 Tidy up cable power of blower fan
Tidy up cable power for blower of 443 FN1 from panel welding 363 RM1 to panel  at 443  WP test on result ok note found breaker 1 failure replace with spare but power blower connected to output power ( EDI & ADI & AIMAN )
2026-02-20
7 months ago
NR.EL-01 Wahyu Adi Triono 463-KL1 Continue relocation or repare shell kiln fan (Test Motor)
Do function motor shell kiln fan result of motor function normal ( AGUS & MUHAIMIN & CIVACON )
2026-02-20
7 months ago
NR.EL-01 Wahyu Adi Triono 453-AE1-&-483-AE1 Check function aeration
Do aeration at 453 AE1 and 483 AE1 result function normal ( RIZAL & ANDRI & DADANG )
2026-02-20
7 months ago
NR.EL-01 Wahyu Adi Triono 473-FA3 Dismantling ex cable power
Do dismantling cable ex 473 FA3 with cutting cable and put at safe location ( EDI & ADI & AIMAN (
2026-02-19
7 months ago
NR.EL-01 Wahyu Adi Triono 473-HD1 Relocation power stop contact
Relocation power stop of 473 HD1 ( AGUS & RIZAL & ANDRI & EVE FADHILAH )
2026-02-19
7 months ago
NR.EL-01 Wahyu Adi Triono 463-KL1 Continue relocation or repare shell kiln fan
Do repare cover motor shell fan of kiln. Fabrication cover at workshop and install at location ( AGUS & MUHAIMIN & EVE FADHILAH & DADANG )
2026-02-19
7 months ago
NR.EL-01 Wahyu Adi Triono L1C-BC1-TO-L1C-BC7 check actual KW motor-voltage-ampere motor
Check indication KW-ampere-voltage motor at ER6 for L1C BC1-L1C BC2-L1C BC3-L1C BC4-L1C BC5-L1C BC6 and L1C BC7 at ER6. Data send to Mr. Jajat ( EDI & ADI )
2026-02-19
7 months ago
NR.EL-01 Wahyu Adi Triono 4W3-1NF Replace ELCB di 4W3-1NE (Cooler Area)-- 2 EA broken
Do replace ELCB at 4W3 1NE 2 each for 25 A also replace receptacle 2 units ( EDI & ADI )
2026-02-19
7 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP-MECHANIC-1 Prepare Data AUDIT API
Do prepare data AUDIT API, print out form complete data calibration and adjustment feeder for 11/8/2025 ( JAJAT & ADI )
2026-02-17
7 months ago
NR.EL-01 Wahyu Adi Triono 483-FA2 Test Run
Test run 483 FA2 with different speed check indication ampere-vibration result normal ( AGUS & MUHAIMIN & DADANG & JAJAT )
2026-02-17
7 months ago
NR.EL-01 Wahyu Adi Triono 413-BL2 Replace breaker of local isolation
Check at site found need to replace panel LCS with new one. Replace panel  LCS with spare for 63 A, continue wiring cable power and for Start-Stop-Emergency ( EDI & ADI )
2026-02-17
7 months ago
NR.EL-01 Wahyu Adi Triono 493-AC2 Issue speed failure
Check at control  miltronic indication lamp ON but 493 AC2 condition stop  check at ER5 found breaker input OFF but indication ready jumper cable. Do start breaker input and LCS 493 AC2 existing off position. Try to start from CCR result running normal ( EDI & ADI & FIRMAN & RAFI )
2026-02-17
7 months ago
NR.EL-01 Wahyu Adi Triono HEAT-EXCHANGER Activation hoist crane
Do pulling and  connected Power to Hoist Crane result done ( AGUS & MUHAIMIN & DADANG )
2026-02-17
7 months ago
NR.EL-01 Wahyu Adi Triono 443-CT1-&-463-2K1 Activation flow meter and replace RTD of IKGA
Re-wiring,  Set Parameter Sensor, Commissioning  Transport  result normal. Soldering RTD sensor  to Transducer result normal ( RIZAL & ANDRI )
2026-02-17
7 months ago
NR.EL-01 Wahyu Adi Triono 443-PH1-473-CC1-413-3S1-413-3S2 Clean up panel I/O
Do clean up panel I/O area east - west blending -cooler-preheater  also LCS from dirty of dust use hand blower ( JAJAT & EDI & ADI & AIMAN )
2026-02-13
7 months ago
NR.EL-01 Wahyu Adi Triono CKD Observation, cable needed of part electronic support project CKD
Maping cable needed of project CKD ( RIZAL & JAJAT & ADI & MUHAIMIN )
2026-02-13
7 months ago
NR.EL-01 Wahyu Adi Triono CKD Observation cable way and prepare part needed rail cable project CKD
Do observation cable way and preparing spare part of rail needed project CKD (  EDI & ANDRI & DADANG & AIMAN )
2026-02-12
8 months ago
NR.EL-01 Wahyu Adi Triono TOP-BLENDING-&-443-PH1 Clean up also check up LCS and motor
Do clean up area LCS and motor. Also clean up push button and emergency stop make function normal from dirty of dust ( AIMAN & EDI & ADI )
2026-02-12
8 months ago
NR.SHIFT Wahyu Adi Triono 443-CT1 Support replace flow sensor
Dismantling old sensor and disconnected sensor ( RIZAL & JAJAT )
2026-02-12
8 months ago
NR.EL-01 Wahyu Adi Triono 4D3-SC6 Activation indication ampere
Indication ready panel operator  view ( JAJAT & AGUS & RIZAL & MUHAIMIN )
2026-02-12
8 months ago
NR.EL-01 Wahyu Adi Triono EAST-BLEANDING-&-393-PP1 Clean up and check LCS - motor area blower blending east - 393 PP1
Clean up and check LCS-motor area blower and 483 PP1 from dirty of dust> Check function AUTO Grease 393 PP1 result function normal grease tank full condition ( EDI & ADI )
2026-02-12
8 months ago
NR.EL-01 Wahyu Adi Triono 483-RF2 Connected cable power
Do connected cable power of 483 RF2 ( EDI & ADI )
2026-02-11
8 months ago
NR.SHIFT Wahyu Adi Triono 483-RF1-&-483-BV1 Connect motor and BV
Do connect motor also BV test run result stuck at BV. Issue mechanic RF need to connected ( RIZAL & EDI )
2026-02-11
8 months ago
NR.EL-01 Wahyu Adi Triono 463-SC6 Install indication ampere unit
Install unit ampere  and  create  DCS input ( MUHAIMIN & DADANG )
2026-02-11
8 months ago
NR.EL-01 Wahyu Adi Triono ER6 Clean up inside and outside from dirty of dust
Put bamboo stick 2 each at ER6 continue clean up inside also outside room from dirty of dust use equipment cleaning tools ( ADI & AIMAN )
2026-02-11
8 months ago
NR.EL-01 Wahyu Adi Triono 363-FN1 Replace vibration sensor at free and fix side
Replace vibration sensor for fix and free side motor result ok ( RIZAL & MUHAIMIN & EVE FADHILAH & ANDRI & DADANG )
2026-02-11
8 months ago
NR.EL-01 Wahyu Adi Triono ER3 install cover concrete at AC ROBICON
Install cover concrete of AC ROBICON at ER3 use fork lift ( ADI & AIMAN )
2026-02-10
8 months ago
NR.EL-01 Wahyu Adi Triono 363-FN1 Support CBM for reposition FAN needed
Prepare damage nut fan. Do prepare panel at workshop, install 3 male socket power, put 2 MC and 1 small MC inside panel continue wiring cable ( JAJAT & AGUS & ADI )
2026-02-10
8 months ago
NR.EL-01 Wahyu Adi Triono 493-AC2 Pull Cord damage
Replace slink pull cord, test ok ( RIZAL& MUHAIMIN & ANDRI & DADANG )
2026-02-10
8 months ago
NR.EL-01 Wahyu Adi Triono 483-LD3 Dismantling damper and set gate at 100%
Dismantling damper of 483 LD3, Weld Gate to 100 % Open ( RIZAL & MUHAIMIN & ANDRI & DADANG )
2026-02-09
8 months ago
NR.EL-01 Wahyu Adi Triono ER3 Dismanlting scraft Piping (Robicon AC ER-3)
Throw scrap iron to warehouse scrap ( AIMAN & CIAVCON )
2026-02-09
8 months ago
NR.EL-01 Wahyu Adi Triono 483-FA2 Scaling VSD of motor (Speed -Amp)
 Setting Parameter, Scaling speed  and Ampere Indication Done ( AGUS & EVE FADHILAH )
2026-02-09
8 months ago
NR.EL-01 Wahyu Adi Triono 363-FN1 Install Main Power and All Sensor
Install Power cable  and Sensor ( RIZAL & MUHAIMIN & ANDRI & DADANG )
2026-02-08
8 months ago
NR.EL-01 Wahyu Adi Triono 363-FN1 Install motor spare
Take motor spare of 363 FN1 at FM1 warehouse near EVE room bring to location continue dismantle roof of motor and bring existing motor to ER3 and install motor spare at location. Bring existing motor to FM1 ware house near EVE room ( JAJAT & AGUS &  AIMAN & CIVACON )
2026-02-08
8 months ago
NR.EL-01 Wahyu Adi Triono 483-FA2 Activation VSD of motor
Turn off incoming power for wiring power input of VSD. Continue wiring cable power input at ER5 and setting parameter at control VSD found error HBB ( Hard Base Block ) do jumper for H1-H2-HC error HBB disappear.  Start On motor local mode found frequency motor only 35 HZ resetting parameter maximal frequency from 60 to 100 result can be change from monitor control and result speed motor add at local ( RIZAL & ADI & MUHAIMIN &  DADANG )
2026-02-06
8 months ago
NR.EL-01 Wahyu Adi Triono BURNER-FLOOR Tidy Up cable area burner
Tidy up cable area  Burner ( AIMAN )
2026-02-06
8 months ago
NR.EL-01 Wahyu Adi Triono 483-FA2 Disconnect power damper and indication
Turn off power motor, dismantle ring at motor, also cable power damper and cable indication. Set output damper at 100% position ( EDI & MUHAIMIN &  ADI )
2026-02-06
8 months ago
NR.EL-01 Wahyu Adi Triono 483-BU1 Install-Wiring Flow meter 483-BU1 + Commissioning
Re-wiring  and Installation Kabel sensor, Test   oil Circulation , Sensor Normal ( RIZAL & ANDRI & EVE SONY )
2026-02-06
8 months ago
NR.EL-01 Wahyu Adi Triono 363-FN1 Support job at 363 FN1 ( disconnect cable sensor and Motor)
Disconnected All Sensor  and Power Motor, Support Mech Sky folding ( AGUS & EDI & ADI & MUHAIMIN & EVE FADHILAH & DADANG )
2026-02-05
8 months ago
NR.EL-01 Wahyu Adi Triono 363-FN1 Support job at 363 FN1
 Do create permit, check area and motor ( JAJAT & MUHAIMIN & AIMAN & DADANG & EVE SONY )
2026-02-05
8 months ago
NR.EL-01 Wahyu Adi Triono 443-2K1 Install sensor temperature Honey Well
Install sensor temperature of Honey Well at 443 2K1 ( RIZAL & EVE FADHILAH & ANDRI )
2026-02-05
8 months ago
NR.EL-01 Wahyu Adi Triono 483-RF1 install seal motor
Do install seal motor and do heat of motor. Measure resistance motor for R-S-T to ground result value up to 2 mega ohm. Install motor at site ( AGUS & MUHAIMIN & EVE SONY & DADANG )
2026-02-05
8 months ago
NR.EL-01 Wahyu Adi Triono 443-PH1-&-TOP-BLENDING Clean Up and Check LCS + Motor
Clean up LCS and motor area top blending and PH, also panel I/O area top blending silo, Check function emergency stop before clean up first result function normal ( EDI & ADI & JAJAT  & AIMAN )
2026-02-04
8 months ago
NR.SHIFT Wahyu Adi Triono FM-OF-DIESEL Make flange at workshop plant
Dismantle FM of diesel bring to workshop. Make flange for FM diesel at workshop plant, install flange at FM diesel also connected at location ( RIZAL & 2 CIVACON )
2026-02-04
8 months ago
NR.EL-01 Wahyu Adi Triono 483-RF1 Install seal motor
Install seal motor, measure use megger unit found resistance around 0.8 mega ohm - 0.9 mega ohm. Use heater lamp again at motor put behind workshop ( AGUS & MUHAIMIN & EVE SONY % DADANG )
2026-02-04
8 months ago
NR.EL-01 Wahyu Adi Triono 433-FM2 Repare or fabrication way of load cell
Check at location found cable load cell out position not neat. Dismantle cable load cell, install conduit cable tighten use cable tie and protect hole use silicone ( RIZAL & ED I& ADI & EVE FADHILAH )
2026-02-03
8 months ago
NR.EL-01 Wahyu Adi Triono IDO-TANK-&-L1C-BC1-&-L1C-BC4 Check function sump pump
Do check function sump pump result IDO function normal, L1C BC1 function normal, L1C BC4 function normal note to be clean up area sump pump because many coal scattered around sump pump ( EDI & ADI & EVE FADHILAH )
2026-02-03
8 months ago
NR.EL-01 Wahyu Adi Triono 443-Z4A-T3 Replace Thermocouple
Dismantle existing thermocouple, install new housing thermocouple and thermocouple continue connect cable sensor ( RIZAL & EDI & ADI & ANDRI & EVE FADHILAH )
2026-02-03
8 months ago
NR.EL-01 Wahyu Adi Triono 463-FX1 Relocation LCS
Relocation LCS of 463 fX1 ( AGUS & MUHAIMIN & EVE SONY & DADANG )
2026-02-03
8 months ago
NR.EL-01 Wahyu Adi Triono 473-FAC-M1 Clean up LCS and area motor (Area Burner )
Clean up area motor and LCS  ( IMAN )
2026-02-03
8 months ago
NR.EL-01 Wahyu Adi Triono 393-SC3 Support and fabrication new control upgrade
Disconnected  Motor 4D2-RF1, motion 393-SC3 and LCS ( MUHAIMIN & DADANG & EVE SONY )
2026-02-03
8 months ago
NR.EL-01 Wahyu Adi Triono 423-BF1 Repare control safety valve issue cable not right position
Do make good position of cable 423 BF1 tighten use cable tie. Repare control safety valve by disconnect cable power ( AGUS & MUHAIMIN &  DADANG & EVE SONY )
2026-02-02
8 months ago
NR.EL-01 Wahyu Adi Triono 493-AC1 Replace or repare cable burn
 Repare and activation power distribution ( EDI & ADI & EVE SONY & EVE FADHILAH )
2026-02-02
8 months ago
NR.EL-01 Wahyu Adi Triono 483-RF1 Issue seal reducer to motor leakage
Dismantle motor 483 RF1. Do replace seal and bearing motor continue install at location ( AGUS & MUHAIMIN & DADANG )
2026-02-02
8 months ago
NR.EL-01 Wahyu Adi Triono 423-BF1 Relocation pressure senso
Relocation  cause Mech Activity ( RIZAL & ANDRI )
2026-02-02
8 months ago
NR.SHIFT Wahyu Adi Triono 393-SC3-M2 Disconnect motor
Do disconnect  power cable motor at 393 SC3 M2 9 ( JAJAT & EDI )
2026-02-02
8 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP SOT of febuary 2026
Make report of SOT for 1st weeks of febuary for all members of Electric Nr1 ( JAJAT & ADI )
2026-02-02
8 months ago
NR.EL-01 Wahyu Adi Triono 473-HS1 Replace / repare -Pulling and install cable burn area 473-HS1
Check at location, found dryer air is not function anymore because dryer air already disconnected from tube of air.  Eliminated cable power from dryer air. Cutting cable power near wall of dryer air. Do turn off MCB at hydrolic room insulation cable power use electrical insulation ( EDI & ADI & EVE SONY & EVE FADHILAH
2026-01-30
8 months ago
NR.EL-01 Wahyu Adi Triono ER5 Continue activation and connected VSD 483 FA2 and create module DCS
Do wiring cable DO at module 5 channel 10, dismantle cable K-T-D-R at  I/O panel ER4 ( JAJAT &  RIZAL & MUHAIMIN & ANDRI & EVE SONI & EVE FADHILAH )
2026-01-30
8 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Make report data safety for TPM ER6 4 file
Make report for data safety TPM ER6: lighting lamp inside ER6 - door of west ER6 - tube water drain of AC ER6 - conduit pipe porous outside ER6  print out at put at dash board TPM ER6 at workshop electric 1 ( JAJAT & ADI )
2026-01-29
8 months ago
NR.SHIFT Wahyu Adi Triono ER5-483-FA2 Continue activation and connected VSD 483 FA2
Install scun of cable power and motor. Pulling cable control  (2x6Px0,75mm), Install module AI820- DI810 unit set ( AGUS & MUHAIMIN &  ANDRI & DADANG )
2026-01-29
8 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP TPM Activity ER6
Do send file VOM to TPM coordinator get sign, print out data 5R and laminating at workshop. Take laminating at CCR to put at dashboard TPM ER6 at workshop ( RIZAL & ADI )
2026-01-29
8 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Scanning data or complete calibration 2025-2026
Complete data calibration for 2024 to 2025, continue scanning send to email Mr. Jajat ( JAJAT & ADI )
2026-01-28
8 months ago
NR.EL-01 Wahyu Adi Triono ER6 Gemba TPM ER6
Clean up area inside electric room, take picture of safety, replace lighting lamp and repare tube of drain air condition of ER6 ( RIZAL & ADI & IMAN )
2026-01-27
8 months ago
NR.EL-01 Wahyu Adi Triono 453-PW1 Wrapping unit to protect from production activity
Do wrapping unit 453 PW1 protect from production activity ( IMAN )
2026-01-27
8 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1 Wiring and install support welding panel of cyclone 363 RM1
Do prepare tray cable at workshop , install at site and pulling cable to panel welding ( AGUS & MUHAIMIN & ANDRI & DADANG )
2026-01-27
8 months ago
NR.EL-01 Wahyu Adi Triono ER5 Activation and connected VSD of 483 fA2
Observation  cable, station and connection  ( AGUS & MUHAIMIN & ANDRI & DADANG )
2026-01-27
8 months ago
NR.EL-01 Wahyu Adi Triono SUMP-PUMP Check function of sump pump all area
Check function of sump pump: IDO tank result ok but note pendulum sump pump outside hole make sump pump always on repare pendulum put inside hole of sump pump, L1C BC4 and L1C BC1 are sump pump normal note hole for sump pump of L1C BC4 many land will make sump pump always start note need to clean up hole of sump pump to make sump pump working properly ( EDI & ADI )
2026-01-26
8 months ago
NR.EL-01 Wahyu Adi Triono MAIN-GATE-ACCES-CONTROL Inpsection electrical and welding tools of PT Indoporlen
Do inspection electrical and welding tools tagging with red color. Note: 2 extention cable and 1 portable lamp are not safe because not full fell safety requirement of plant ( EDI & ADI )
2026-01-26
8 months ago
NR.EL-01 Wahyu Adi Triono 473-FA3-&-473-FA4 Fabrication cover motor
Fabrication cover motor at work shop and do painting cover with yellow color continue install at site for 473 FA3 and 473 FA4 ( MUHAIMIN & ANDRI & DADANG )
2026-01-26
8 months ago
NR.EL-01 Wahyu Adi Triono ER3 Activation CCTV ER3 - office way
Do activation CCTV of ER3 with IP 10.227.19.170 and 10.227.19.151 result view for CCTV ok ( AGUS, RIZAL )
2026-01-26
8 months ago
NR.EL-01 Wahyu Adi Triono EAST-BLEANDING-&-WEST-BLENDING-&-CT-TRANSPORT Clean up welding panel - I/O panel - area motor from dirty of dust
Clean up panel welding - panel I/O - panel LCS - area motor - bucket elevator- bag filter - rotary feeder - blower - air slide of east and west blending also CT transport from dirty of dust use instrument air supply and hand blower ( JAJAT & EDI & ADI )
2026-01-23
8 months ago
NR.EL-01 Wahyu Adi Triono 473-HS1 Issue cable burn area 473 HS1
Disconnected cable power , scheduling for repairing ( JAJAT )
2026-01-23
8 months ago
NR.EL-01 Wahyu Adi Triono 453-GA1-&-453-GA2 Disconnected cable 453-GA1/2
Disconnected cable 453 GA1 and 453 GA2 at local ( JAJAT & ADI )
2026-01-23
8 months ago
NR.EL-01 Wahyu Adi Triono ER3 Prepare set of CCTV for ER3 2 unit
Do prepare support for CCTV at ER3 at workshop. Continue install at CCTV at ER3 and do setting of CCTV ( AGUS )
2026-01-23
8 months ago
NR.EL-01 Wahyu Adi Triono FEED-BIN Extention module I/O at feed bin support upgrade weight feeder FABA
Do prepare module extention I/O for WF FABA. Continue install module at panel I/O like module 8 DI 810 - module 9 DI 810 - module10 AI 810 continued download extention module result ok ( RIZAL & ANDRI )
2026-01-23
8 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Prepare fabrication power point area L1C BC5
Do prepare panel power point of L1C BC and wiring cable, Prepare support of panel at workshop ( MUHAIMIN & DADANG & ADI )
2026-01-22
8 months ago
NR.EL-01 Wahyu Adi Triono 463-KL1 Fabrication cable tray and connected FX Kiln (Shell Fan Kiln) and Install Point Port (Continue) - Connect port FX
Install Cable  to distribution port and  complete accecories unit to FX  (spare 3 FX) ( MUHAIMIN & DADANG )
2026-01-22
8 months ago
NR.EL-01 Wahyu Adi Triono ER2 Continue activation remote VCS at ER3
Connected cable Terminal control to VCS unit ( AGUS & ANDRI & RIZAL )
2026-01-22
8 months ago
NR.EL-01 Wahyu Adi Triono 453-PF1-483RF1-483-RF2-483-AG1-453-AG1 Wrapping part because production activity
Do wrapping equipment due production activity result part complete safe ( RIZAL & ANDRI )
2026-01-22
8 months ago
NR.EL-01 Wahyu Adi Triono 443-FN1-&-473-FAA Repare handle LOTOTO ID Fan and handle LCS 473 FAA
Replace handle LOTOTO 443 FN1 with spare unit result ok note white lock 7019 still at available at existing lock. Replace handle 473 FAA result ok ( EDI & ADI )
2026-01-22
8 months ago
NR.EL-01 Wahyu Adi Triono 483-RF3 Disconnect motor rotary feeder
Do disconnect power motor for 483 RF3 ( RIZAL & ANDRI )
2026-01-22
8 months ago
NR.EL-01 Wahyu Adi Triono L1C-BC1 Issue sump pump failure
Check at local position switch sump pump at manual.. Found power trip at panel input. Turn on power result sump pump working normal ( EDI & ADI )
2026-01-22
8 months ago
NR.EL-01 Wahyu Adi Triono 473-CC1-&-463-KL1 Clean Up and Check LCS and motor cooler and Kiln Bottom
Do clean up panel LCS and motor area 473 CC1 including panel welding area cooler from dirt of dust use equipment cleaning tool a and hand blower ( JAJAT & EDI & ADI & AIMAN )
2026-01-21
8 months ago
NR.EL-01 Wahyu Adi Triono 463-KL1 Fabrication cable tray and connected FX Kiln (Shell Fan Kiln) + Install Point Port (Continue) - Connect port FX
 Install fabrication bar electric and wiring cable support installation ( MUHAIMIN & DADANG )
2026-01-21
8 months ago
NR.EL-01 Wahyu Adi Triono ER3 Prepare-Rewiring LAN Install Converter-POE unit and office way
Install converter POE unit and office way at ER3 continue rewiring cable ( EDI & ADI )
2026-01-21
8 months ago
NR.EL-01 Wahyu Adi Triono ER3-&-ER4-&-ER5 Install SOP of MICOM P122 and P225
Laminating SOP of Micom P122 & P226 at workshop. Install SOP of MICOM P122 and P225 at ER3 - ER4 - ER5 ( EDI & ADI )
2026-01-19
8 months ago
NR.EL-01 Wahyu Adi Triono ER3-&-MAIN-GATE Inspection electrical and welding tools of PT Civacon and PT RMP
Inspection electrical and welding tools of PT CIVACON at ER3. Repare extention cable because for ground cable connected failure for stop contact and welding machine because cable power is not safe at outside welding machine. Inspection electrical and welding tools of PT RMP at main gate. Tagging equipment with red color. Note there are some equipment electrical tools not safe because grounding cable failure ( EDI & ADI )
2026-01-20
8 months ago
NR.EL-01 Wahyu Adi Triono 463KL1-&-BURNER-FLOOR Clean Up dan Check LCS Area Burner + Kiln + Heat Exchanger
Do clean up and check up LCS area burner and kiln ( JAJAT & EDI & ADI & AIMAN)
2026-01-19
8 months ago
NR.EL-01 Wahyu Adi Triono 463-KL1 Fabrication cable tray and connected FX Kiln (Sheal Fan Kiln)
Do fabrication cable tray at workshop and install at site continue connected cable sheal fan of kiln ( AGUS & RIZAL & MUHAIMIN & ANDRI & DADANG )
2026-01-15
8 months ago
NR.EL-01 Wahyu Adi Triono L1C-RE1 Cleaning MCC and PLC
Cleaning MCC and PLC for L1C RE1 use hand blower from dirty of dust ( JAJAT & AIMAN & DADANG )
2026-01-15
8 months ago
NR.EL-01 Wahyu Adi Triono 443-PH1-&-473-CC1 Inspection electrical and welding tools of PT TRUBA JAGA CITA
Do inspection electrical and welding tools of PT Tuba Jaga Cita. Equipment tagging with red color. Note some extention cable, welding machine-portable lamp are not full feel requirement safety from company ( EDI & ADI )
2026-01-15
8 months ago
NR.EL-01 Wahyu Adi Triono 443-PH1 Activation I/O 2nd floor 443 PH1 ( project upgrade 443 2K1 & 463 2K1) and addressing
Do activation I/O panel 2nd floor of preheater for project upgrade 443 2K1 and 463 2K1 including addressing cable ( AGUS & RIZAL & MUHAIMIN & ANDRI )
2026-01-15
8 months ago
NR.EL-01 Wahyu Adi Triono 423-BF1 Activation I/O module, migitation solenoid failure
Install module solen0id valve, connected cable power for solenoid valve  and connector tubing for solenoid valve. Also connected cable at I/O module Continue activation I/O module for migitation solenoid valve failure and install connector tubing at module solenoid valve ( AGUS & RIZAL & MUHAIMIN & ANDRI )
2026-01-14
8 months ago
NR.EL-01 Wahyu Adi Triono HRG HRG shutdown ( long time idle )
Follow form step by step Log stoppage procedure ( release pressure ,empty Water , Release Power, Stop Valve system , Off  breaker control power ) ( JAJAT )
2026-01-14
8 months ago
NR.EL-01 Wahyu Adi Triono L1C-TR1 Continue fabrication welding panel area truck lift
Install pipe conduit for cable welding panel, continue connected to new welding panel and existing welding panel near hoist crane  with action turn off power input existing welding panel  ( RIZAL & ANDRI & DADANG & AGUS & JAJAT & ADI & MUHAIMIN & AIMAN )
2026-01-13
8 months ago
NR.EL-01 Wahyu Adi Triono L1C-TR1 Fabrication welding point area truck lift
Take cable no item 305122055 around 30 meter. Pulling cable power of welding panel at L1C BC1 room to top floor. Prepare pipe conduit around 5 meter and claim pipe at workshop bring to site ( EDI & RIZAL & ADI & ANDRI )
2026-01-13
8 months ago
NR.EL-01 Wahyu Adi Triono 473-CC1-AND-BURNER-FLOOR Activation welding panel area burner and cooler
 Activation welding panel at 493AC2, replace ELCB, install and setting timer of lamp ( AGUS & MUHAIMIN & DADANG )
2026-01-12
9 months ago
NR.EL-01 Wahyu Adi Triono 463-KL1 463 KL1 T1 issue reading temperature at CCR low
Replace Thermocouple and repare housing. Result reading temperature back to normal ( RIZAL & ANDRI )
2026-01-12
9 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-2K1 PMR service analyzer
Do clean flange probe-probe-filter sample line-sample line tube-diaphragm pump-filter balston-dryer gas pump from dirty of dust use instrument air supply. Check function humidity sensor and filter humidity result function sensor humidity normal  and filter humidity sensor good condition ( RIZAL & ANDRI )
2026-01-12
9 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1-&-473-CC1 PMR Service Critical Motor & LSR CM & CC
Clean area motor and filter motor. Measure vibration-noise-temperature FS and  LS motor. Add grease for FS and LS motor 30 times and 25 times ( MUHAIMIN & DADANG )
2026-01-12
9 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-443-PH1 PMR service critical motor LSR RM-PH
Clean area motor and filter motor. Also clean up filter 363 FA2. Measure vibration-noise-temperature FS and  LS motor. Add grease for FS and LS motor 15 times and 20 times. Replace AUTO Grease motor for 363 FN1 and 363 FN2 with spare unit. Refill AUTO Grease empty level at workshop until unit ready to use ( EDI & ADI )
2026-01-09
9 months ago
NR.EL-01 Wahyu Adi Triono 363-MD1 replace CB no 6-8-9
Do clean up carbon brush room area from dirty of dust with instrument air. Replace carbon brush no 6-8-9 with spare unit ( EDI & RIZAL & ADI )
2026-01-09
9 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Install camera WS electric
Do install camera CCTV at workshop also pulling cable power and LAN cable continue connect at camera result ok ( ANDRI & DADANG )
2026-01-09
9 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Complete data check sheet inspection electrical tools of PT Pincuran Mas
Do completing data check sheet inspection electrical tools of PT PINCURAN MAS at 6-1-26.. Scan file and send to Mr.Jaenudin Safety Officer PT Pincuran Mas ( ADI )
2026-01-09
9 months ago
NR.EL-01 Wahyu Adi Triono 493-AC2 Replace Box hagger + Accecories
Check condition of box LCS for 493 AC2-493 AC3-483 AC4 result condition normal also clean up pabelk LCS from dirty of dust ( EDI & ADI & MUHAIMIN )
2026-01-09
9 months ago
NR.EL-01 Wahyu Adi Triono L93-SC4 Issue speed failure
Check speed sensor at local result function sensor good note problem of mechanical ( RIZAL & ANDRI )
2026-01-09
9 months ago
NR.EL-01 Wahyu Adi Triono 443-PH1 Replace spray pump
Do check function water spray at local found have problem when manual do service valve manual result function valve manual water spray normal ( AGUS & EVE FADHILAH & DADANG )
2026-01-08
9 months ago
NR.EL-01 Wahyu Adi Triono ER5 Support take sample oil trafo
Do support supplier take sample oil trafo at electric room 5 ( JAJAT & AGUS )
2026-01-08
9 months ago
NR.SHIFT Wahyu Adi Triono 463-2K1 Issue O2 High and repare chain tention
Clean up sample line, and adjust chain of probe retract and insert. Turn off shock blower direct to main hole. Result reading O2 back to normal below 4% ( MUHAIMIN & AGUS & EVE SONY & ANDRI )
2026-01-08
9 months ago
NR.SHIFT Wahyu Adi Triono 363-RM1 Prepare part Cover Motor
Do prepare part of cover motor area 363 RM1 ( RIZAL & MUHAIMIN & DADANG )
2026-01-08
9 months ago
NR.EL-01 Wahyu Adi Triono L1C-BC1 Install welding point and issue sump pump failure
Prepare support for panel welding and install at panel welding. Install panel welding at L1C BC1. Do turn off power input and found motor of sump pump hot. Swap cable connection power, test function sump pump result ok normal ( EDI & ADI & EVE FADHILAH & DADANG & JAJAT )
2026-01-07
9 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-CN Prepare Welding Point RM Cyclone
Install welding panel at  cyclone rawmill (MUHAIMIN & EVE FADHILAH & ANDRI & DADANG )
2026-01-07
9 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP L1C BC1-BC2-BC3 prepare welding panel
Prepare welding panel ex burner floor bring to workshop do clean up panel. Repainting welding panel use grey color. ( EDI & DADANG )
2026-01-07
9 months ago
NR.EL-01 Wahyu Adi Triono PINCURAN-MAS-WORK-SHOP Inspection electrical and welding tools
Do inspection electrical tools of PT PINCURAN MAS tools tagging with red color ( ADI )
2026-01-07
9 months ago
NR.EL-01 Wahyu Adi Triono L1C-BC1 Lighting lamp off near welding panel
Replace lighting lamp test function result lighting lamp on ( EDI & DADANG )
2026-01-07
9 months ago
NR.EL-01 Wahyu Adi Triono 423-BF1 Issue JB 21 No 7 Abnormal
Check at site, clean up solenoid valve and  tubing purging and reconnect tubing result function solenoid valve back to  normal ( RIZAL & ANDRI )
2026-01-06
9 months ago
NR.EL-01 Wahyu Adi Triono L1C-TR1 Install selector AUTO-MAN for signal START-STOP activated vibrator from CCR
Do install selector for AUTO-MAN of signal START & STOP also activated vibrator from CCR ( JAJAT & EDI & RIZAL & ANDRI & DADANG & AGUS & MUHAIMIN & ADI & AIMAN & EVE FADHILAH & EVE SONY )
2026-01-06
9 months ago
NR.EL-01 Wahyu Adi Triono L1C-TR1 Prepare cable for sensor position minimal 2 pair around 15 m x 3
PM  truck lift do prepare cable for sensor around 15 meter x 3  ( ADI & AIMAN & EVE SONY )
2026-01-06
9 months ago
NR.EL-01 Wahyu Adi Triono L1C-TR1 Pulling cable and connection sensor to terminal & commissioning ML indication
Pulling cable and do connection sensor to terminal. Do commissioning ML indication result ok ( JAJAT & RIZAL & EDI & ANDRI & DADANG )
2026-01-06
9 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Fabrication tray cable to sensor ML 3 point
Do fabrication cable tray and install at site ( RIZAL & EDI & ANDRI & DADANG & JAJAT )
2026-01-06
9 months ago
NR.EL-01 Wahyu Adi Triono ER6 wiring I/O 24 VDC and signal
PM truck lift do pulling cable power 110 VAC for DI L1C BC1-L1C BC2-L1C BC3. Also add AO at I/O ER6 and cable power 110 VAC. Continue wiring DI at junction box and panel I/O ER6 ( AGUS & MUHAIMIN & ADI & EVE FADHILAH )
2026-01-05
9 months ago
NR.EL-01 Wahyu Adi Triono 363-FA2 Cooling Fan Failure
Service and clean up cooling fan and filter motor  at 363 FA2 result function cooling fan back to normal ( EDI & DADANG )
2026-01-05
9 months ago
NR.EL-01 Wahyu Adi Triono FEED-BIN Observation upgrade control WF feed bin
Do observation for upgrade control WF feed bin ( AGUS & RIZAL & MUHAIMIN )
2026-01-05
9 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-2K1 PMR service analyzer
Clean up flange probe-probe-filter sample line-sample line-diaphragm pump=filter balston-dryer gas pump from dirty of dust. Check function of humidity sensor and filter humidity result function humidity sensor normal and filter humidity good condition ( RIZAL & ANDRI & EVE FADHILAH )
2026-01-05
9 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-L63-RM1 PMR Service Critical Motor & LSR RM&CM1
Clean up area motor and filter motor. Measure vibration-noise-temperature of FS and LS. Add grease 30 times-25 times for FS and LS ( EDI & DADANG )
2026-01-05
9 months ago
NR.EL-01 Wahyu Adi Triono 463-KL1-&-473-CC1 PMR Service Crit Motor & LSR KL & Cooler
Clean up area motor and filter motor. Measure vibration-noise-temperature of FS and LS. Add grease 30 times-35 times for FS and LS ( MUHAIMIN & EVE SONY )
2026-01-02
9 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Make sign for 493 AC2 and 493 AC3
Make sign for LCS 493 AC2 and 493 AC3 print out and laminating continue install at local ( JAJAT & ADI & EVE SONY )
2026-01-02
9 months ago
NR.EL-01 Wahyu Adi Triono ER6 Pulling cable control L1C BC1-BC2-BC3
Pulling cable control for L1C BC1-LiBC2-L1C BC3 ( MUHAIMIN & ANDRI & DADANG )
2026-01-02
9 months ago
NR.EL-01 Wahyu Adi Triono 433-BF2 Replace or upgrade module. Issue error at process
Connect cable at module PLC for power input and output also cable for solenoid valve. Test function bag filter result ok interval every solenoid 5 second ( JAJAT & ADI & MUHAIMIN & EVE SONY & ANDRI & DADANG )
2025-12-31
9 months ago
NR.EL-01 Wahyu Adi Triono 443-FN1 Observation blower at 443 FN1
Observation blower at 443 FN1 ( MUHAIMIN & ANDRI & DADANG )
2025-12-31
9 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-2K1 PMR Service analyzer Preheater & IKGA N1 + completing part for upgrade 443 2K1 at SAP
Clean up flange of probe, probe, filter sample line, sample line, diaphragm pump, filter balston, dryer gas pump from dirty of dust, Check function of humidity sensor and filter humidity, result function humidity sensor normal and filter good condition. Do completing part for upgrade analyzer 443 2K1 at SAP ( RIZAL )
2025-12-31
9 months ago
NR.EL-01 Wahyu Adi Triono EP--PH--GCT-PH-KL WBI Elec & Ins & Check I/O GCT, EP,PH&KL
Do WBI electric and  instrumentation check I/O GCT-EP-PH-KL. Clean up area, also measure vibration - noise - temperature of FS and LS. Write abnormal at file check sheet. Make notification for abnormal condition  ( EDI )
2025-12-31
9 months ago
NR.EL-01 Wahyu Adi Triono FEED-BIN--RAWMILL-CT--DUST-TRASNPORT---BAG-FILTER WBI Electric & Ins & Check I/O Feed Bin-RM-CT-Dust Transport-Bag Filter
Do WBI electric and  instrumentation check I/O feed bin, rawmill, CT, dust transport, bag filter. Clean up area, also measure vibration - noise - temperature of FS and LS. Write abnormal at file check sheet. Make notification for abnormal condition  ( ADI )
2025-12-31
9 months ago
NR.EL-01 Wahyu Adi Triono BURNER-FLOOR Dismalting Welding Point Burner+ Clean Up + relocation power lubrication exchanger point
Dismantling welding point of burner floor and continue clean area welding from dirty of dust use instrument air supply. Relocation power lubrication exchanger point ( AGUS & MUHAIMIN & ANDRI & AIMAN )
2025-12-30
9 months ago
NR.EL-01 Wahyu Adi Triono 463-KL1 Monitoring Heating Up
Do monitoring process heating up of KILN NR1 ( JAJAT & AGUS & RIZAL & EDI & ADI & ANDRI & MUHAIMIN & DADANG )
2025-12-30
9 months ago
NR.EL-01 Wahyu Adi Triono BURNER-FLOOR Activation panel welding of burner floor
Do connect cable power panel welding at burner floor test on result power panel welding available ( AGUS & ANDRI & MUHAIMIN & DADANG )
2025-12-30
9 months ago
NR.EL-01 Wahyu Adi Triono 463-KL1 Relocation and replace end point hydraulic cooling fan and blower tyer
Relocation end point of hydraulic cooling fan and blower tyer ( AGUS & MUHAIMIN & DADANG & ANDRI )
2025-12-30
9 months ago
NR.EL-01 Wahyu Adi Triono L63-BF1 Install Auto Drain
Do install AUTO drain of bag filter ( RIZAL & EDI & ADI )
2025-12-30
9 months ago
NR.EL-01 Wahyu Adi Triono 443-PH1 Activation panel welding 8th floor
Do connect cable power panel welding at 8th floor test on result power panel welding available ( RIZAL & EDI & ADI )
2025-12-30
9 months ago
NR.EL-01 Wahyu Adi Triono L63-BF1 observation all solenoid valve and installation of L63 BF1 and check relay
Replace puppet valve 4 each, replace cage 7 each, bag 6 each and pneumatic 1 each by mechanic team ( RIZAL & ANDRI )
2025-12-30
9 months ago
NR.EL-01 Wahyu Adi Triono ER4 Prepare Test Drive (Pulling cable ) + Support Instalation
Pulling cable for test drive at ER4 also clean up panel drive motor note make hole at wall of ER4 for cable drive way and heater cable power 220 VAC ( JAJAT & EDI & RIZAL & ADI & MUHAIMIN & ANDRI & DADANG & EKO JUHAN & MARDIYANTO & FIRMAN )
2025-12-29
9 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1 Analyzer Failure (Issue failure of cable)
Do repare cable at 463 2K1 result ok analyzer reading normal from process ( EDI & RIZAL )
2025-12-29
9 months ago
NR.EL-01 Wahyu Adi Triono 443-2K1 Prepare instalation analyzer DownComer (New Instalation)
Do prepare installation analyzer 443 2K1 for new installation ( RIZAL & EDI )
2025-12-29
9 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-L63-RM1 PMR service critical motor LSR RM-CM
Clean up area motor and filter motor. Measure vibration-noise-temperature FS and LS motor also clean up filter 363 FA2 from dirty of dust use instrument air supply. Add grease motor  30 times and 25 times for FS and LS motor ( AGUS & DADANG )
2025-12-29
9 months ago
NR.EL-01 Wahyu Adi Triono 463-KL1-&-473-CC1 PMR service critical motor
Clean up area motor and filter motor from dirty of dust use instrument air supply. Measure vibration-noise-temperature FS and LS motor. Add grease motor  30 times and 35 times for FS and LS motor ( MUHAIMIN & EVE SONY )
2025-12-26
9 months ago
NR.EL-01 Wahyu Adi Triono 473-FA6 Issue high up 2gE for FS and LS
Add grease motor for FS and LS around 20 times. Measure noise motor FS: A 1.09 gE - V 1.85 gE - H 1.51 gE; LS: A 1.66 gE - H 1.43 gE - V 1.96 gE ( ADI & EVE SONY )
2025-12-26
9 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Repare thermowell ex 463 KL1 T1
Do repare thermowell at workshop ( ANDRI & DADANG )
2025-12-26
9 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Assembling panel welding area cyclone raw mill
Do assembling welding panel for cyclone raw mill ( MUHAIMIN )
2025-12-26
9 months ago
NR.EL-01 Wahyu Adi Triono HRG-ROOM- Clean up area and turn off AC
Clean up area HRG and turn off AC of HRG ( MUHAIMIN )
2025-12-26
9 months ago
NR.EL-01 Wahyu Adi Triono TPM-423-2K1-&-ER3 Prepare garbage tank 2 color green and yellow of 423 2 K1 & prepare garbage tank 3 color: green - yellow-red of ER3
Take garbage tank for yellow and green color put at outside CEMS room and also take garbage tank for yellow-green-red color put at outside ER3 ( ADI & AIMAN )
2025-12-24
9 months ago
NR.EL-01 Wahyu Adi Triono L63-MD1 Install guarding fan
Install guarding fan at L63 MD1 for cooling fan ( EDI & ADI )
2025-12-24
9 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1 Issue high O2 reading
Clean up probe - filter sample line - motor blower from dirty of dust. Result CO 0.002 to 0.012%, NO 1244 PPM - O2 4.34 to 5.97 % ( EDI & ADI )
2025-12-24
9 months ago
NR.EL-01 Wahyu Adi Triono 463-KL1-T1 Issue reading temperature abnormal
Check at local found thermowell failure. Relace sensor T/C - hosing of T/C - thermowell result temperature indication normal ( RIZAL & MUHAIMIN & DADANG )
2025-12-24
9 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP TPM activity form
Do complete TPM activity form at computer, save at file inside computer ( JAJAT & RIZAL )
2025-12-24
9 months ago
NR.EL-01 Wahyu Adi Triono AUTO-DRAIN-OF-CM Install cover of solenoid AUTO drain at L63 2K1
Install cover from water and hot of sun at solenoid AUTO drain ( EDI & ADI )
2025-12-24
9 months ago
NR.EL-01 Wahyu Adi Triono 363-SR1&-363-FN2 Issue high vibration ( add greasing )
Add grease motor at 363 SR1 M1 around 20 times, measure vibration at LS: H 6.7 mm/s, A  3.7 mm/s, V 4.7 mm/s at base plate 7.8 mm/s. Also add grease motor at 333 BC1 for FS and LS measure vibration LS: H 1.9 mm/s, V 1.7 mm/s. Add grease motor at 363 FN2 LS around 20 times measure vibration LS: V 2.3 mm/s, H 1.3 mm/s, A 1.0 mm/s ( EDI & ADI )
2025-12-23
9 months ago
NR.EL-01 Wahyu Adi Triono IDO-TANK IDO pump can not loading diesel to tank
Refill tube for take out diesel from truck, result start pump diesel come out from tube after touch level high tube for loading diesel ( JAJAT &  EDI & ADI & EVE SONY )
2025-12-23
9 months ago
NR.EL-01 Wahyu Adi Triono ER6-&-ER5 Cleaning ER NAR 1
Clean up ER6 and ER5 top also bottom from dirty of dust, also filter MCC use vacuum cleaner and mop floor ( AIMAN )
2025-12-23
9 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Final Drawing 443-2K2 + Drawing Remote VCS RM
Drawing 443 2K1 and remote VCS of 363 RM save at computer ( AGUS )
2025-12-23
9 months ago
NR.EL-01 Wahyu Adi Triono L1C-TL1 Activation alarm Ready to Start - Failure
Install indication Ready - Start - Failure for L1C BC4 at L1C TL1. Pulling cable power for lamp indication ( MUHAIMIN & ANDRI & DADANG & EVE SONY )
2025-12-23
9 months ago
NR.EL-01 Wahyu Adi Triono 363-FN2 Issue high noise for LS motor
Measure noise motor at LS, add grease motor around 40 times  measure noise result decrease below 2 gE ( EDI & ADI )
2025-12-23
9 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1 Issue AUTO drain abnormal
Check auto drain solenoid valve, found not working. Replace solenoid valve auto drain for 2 air tank at CM test function result normal function. Make cover auto drain near analyzer L63 2K1 for protect from rain ( EDI & ADI )
2025-12-22
9 months ago
NR.EL-01 Wahyu Adi Triono TSCANNER Issue problem view at CCR
Stick limit switch untouched, make  good position of stick can touched, result view T scanner back to normal ( MUHAIMIN & ANDRI )
2025-12-22
9 months ago
NR.EL-01 Wahyu Adi Triono CO2-SYSTEM-TANK- Observation safety valve CO ( issue energize )
Check at local for safety valve, release valve CO result normal. Note safety valve over pressure make energize ( RIZAL & ANDRI )
2025-12-22
9 months ago
NR.EL-01 Wahyu Adi Triono L63-BF1 Observation solenoid purging L63 BF1 issue high draff
Check at local found tube hose broke, replace tube of solenoid purging at L63 BF1 result drafft back to normal ( RIZAL & ANDRI & EVE SONI )
2025-12-22
9 months ago
NR.EL-01 Wahyu Adi Triono 463-KL1-&-L63-RM1 PMR Service Critical Motor & LSR Kiln & Cooler 1
Clean up area motor  and filter motor from dirty of dust use instrument air supply. Measure vibration - noise - temperature for FS and LS. Add grease 30 times - 25 times for FS and LS motor ( AGUS & DADANG )
2025-12-22
9 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-443-PH1 PMR service critical motor LSR RM-CM
Clean up area motor  and filter motor also filter motor 363 FA2 from dirty of dust use instrument air supply. Measure vibration - noise - temperature for FS and LS. Add grease 20 times - 25 times for FS and LS motor ( ADI &  MUHAIMIN )
2025-12-19
9 months ago
NR.EL-01 Wahyu Adi Triono T-SCANNER Issue problem view at CCR
Check stick limit switch zero not untouched, repare stick at limit switch zero result T scanner view normal at CCR ( RIZAL & ANDRI )
2025-12-19
9 months ago
NR.EL-01 Wahyu Adi Triono 443-2K1 Prepare Support Cable of 443-2K1
Do prepare support cable at 443 2K1. Measure part cable needed from analyzer ti I/o panel around 553 meter ( RIZAL & EDI & EVE SAFIR & ANDRI )
2025-12-19
9 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Scanning PMR dan WBI period July-December 2025
Do put back check sheet after scanning. Print out data check sheet 2 until 4 copies for some PMR and WBI ( JAJAT & ADI )
2025-12-18
9 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Observation recondition motor OH 2026
Do observation recondition motor for OH 2026 ( AGUS & MUHAIMIN )
2025-12-18
9 months ago
NR.EL-01 Wahyu Adi Triono TSCANNER Issue error
Replace stick for solenoid valve result ok ( RIZAL & ANDRI )
2025-12-18
9 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Fabrication or prepare level sensor L1C TL1
Do fabrication sensor level at workshop for L1C TL1 ( EDI & EVE SAFIR )
2025-12-18
9 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Scanning PMR dan WBI periode July-December 2025
Complete data check sheet PMR and WBI start month July to December 2025, continue scanning data check sheet send to Mr.Jajat ( JAJAT & ADI )
2025-12-17
9 months ago
NR.EL-01 Wahyu Adi Triono SOLAR-TANK Check function of sump pump
Check function sump pump, On breaker sump pump, result function normal. Note there is joint pipe failure advise repare joint pipe immeadiately ( EDI & ADI )
2025-12-17
9 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Observation recondition motor OH 2026
Observation data recondition motor of OH 2026 write data at computer as DATA MOTOR OH26 ( AGUS & MUHAIMIN )
2025-12-17
9 months ago
NR.EL-01 Wahyu Adi Triono 473-FA3 Issue Pressure zero
Replace pressure tube at 473 FA3 result indication pressure normal ( RIZAL & ANDRI & DADANG )
2025-12-17
9 months ago
NR.EL-01 Wahyu Adi Triono 433-FM2 Issue Error LC
Check at location found there is cable short to body panel, repare cable  cover with isolation cable result indication normal ( RIZAL & ANDRI )
2025-12-17
9 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP fabrication sensor material level L1C TR1
Do fabrication sensor material level for L1C TR1 at workshop ( ANDRI & DADANG )
2025-12-17
9 months ago
NR.EL-01 Wahyu Adi Triono 473-CC1-&-483-BL7 GREASING-MOTOR->-200-KW
Add greasing motor for FS and LS around 10 times of motor ( EDI & ADI )
2025-12-17
9 months ago
NR.EL-01 Wahyu Adi Triono 473-FA6 Issue high vibration motor at FS and LS
Check found tank of AUTO grease low level, replace tank of AUTO grease motor with spare unit. Add grease motor at FS and LS around 15 times, measure vibration motor result 1.7 mm/s and 2.9 mm/s ( EDI & ADI )
2025-12-16
9 months ago
NR.EL-01 Wahyu Adi Triono 443-FN1 Issue AUTOBALANCER problem
Replace  module and repare  socket ( AGUS & MUHAIMIN )
2025-12-16
9 months ago
NR.EL-01 Wahyu Adi Triono ER3 Observation part needed piping AC robicon ER3 ( compare item number at WH )
Measure pipe 4 inchi needed at local around 32 meter. Check pipe 4 inchi at warehouse found but there are no elbow for 4 inchi and 2.5 inchi ( EDI & ADI )
2025-12-16
9 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-443-PH1 PMR service critical motor LSR RM-CM
Clean up area motor and filter motor. Measure vibration - noise  - temperature FS & LS motor. Add grease motor 35 times - 30 times for FS and LS motor. Refill AUTO grease motor ( AGUS & DADANG )
2025-12-16
9 months ago
NR.EL-01 Wahyu Adi Triono 463-KL1-&-473-CC1 PMR service critical motor LSR KL-CM
Clean up area motor and filter motor. Measure vibration - noise  - temperature FS & LS motor. Add grease motor 25 times - 30 times for FS and LS motor ( MUHAIMIN & EVE SAFIR )
2025-12-16
9 months ago
NR.EL-01 Wahyu Adi Triono 423-2K1 PMR service CEMS
Clean up purge air motor and filter purge air motor, clean up flange with tube - swivel window T/R & R - alignment dust hunter.  clean up transducer A & B for flowsic 100, CEMS room - filter cabinet MCS 100E -  CEMS gas room from dirty of dust use instrument air supply ( RIZAL & ROMY & ANDRI )
2025-12-12
9 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Observation recondition motor for over haul 2026
Do observation for recondition motor OH 2026 ( AGUS & MUHAIMIN )
2025-12-12
9 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1 PMR service analyzer
Clean up flange probe - sample line tube -filter sample line - diaphragm pump -  dryer gas pump - filter balston from dirty of coal. Check function of humidity sensor and filter humidity result function sensor humidity normal and filter humidity good condition ( RIZAL & ROMY )
2025-12-12
9 months ago
NR.EL-01 Wahyu Adi Triono HRG Replace and configuration CCTV at outside of HRG
Check communication CCTV at outside HRG result bad communication. Replace CCTV with spare camera test communication result normal view at outside of HRG ( AGUS & JAJAT & EDI & ADI & DADANG )
2025-12-11
9 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Setting MICOM with actual temperature
Do setting MICOM with standard actual temperature use calibrator of temperature result indication different 7 degree celcius. Install MICOM at ER3 test run function result ok ( AGUS & EDI & MUHAIMIN )
2025-12-11
9 months ago
NR.EL-01 Wahyu Adi Triono HRG-ROOM- Cleaning area HRG
Do clean up area HRG room and panel of HRG use instrument air supply ( JAJAT & ADI & DEVI )
2025-12-11
9 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Fabrication additional HRG filter
Do fabrication for filter additional of HRG ( ANDRI & DADANG )
2025-12-11
9 months ago
NR.EL-01 Wahyu Adi Triono 423-2K1 PMR service CEMS
Cleaning area motor purge air unit and filter motor, cleaning swivel window reflector and t/r unit dust hunter also flange with tube and alignment dust hunter, transducer A & transducer B flowsic 100,  CEMS room, filter cabinet MCS 100E and CEMS gas room from dirty of dust use instrument air supply ( RIZAL & EVE SAFIR )
2025-12-10
9 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1 Clean up panel I/O
Cleaning up panel I/O area raw mill, 363 FN2, 363 BC1, feed bin from dirty of dust use hand blower ( JAJAT & ADI )
2025-12-10
9 months ago
NR.EL-01 Wahyu Adi Triono 363-FN1-&-363-FN2 Cleaning motor and filter motor
Do clean up area motor and filter motor from dirty of dust use instrument air supply and equipment cleaning tools ( ADI & EDI )
2025-12-10
9 months ago
NR.EL-01 Wahyu Adi Triono 483-PF1 Panel HMI issue error communication
Check cable communication result good communication cable ( RIZAL & JAJAT )
2025-12-10
9 months ago
NR.EL-01 Wahyu Adi Triono 363-MD1 Cleaning and check motor also CB and connection
Cleaning up area motor and filter motor also filter motor 363 FN2 also carbon brush room from dirty of dust use instrument air supply. Measure long carbon brush result normal ( EDI &  EVE SAFIR )
2025-12-10
9 months ago
NR.SHIFT Wahyu Adi Triono 363-CV1 Issue oil come to motor check and install oil CPME to motor
Dismantling motor bring to workshop. Replace bearing motor install at site refill oil motor test run motor measure ampere result ok ( RIZAL & MUHAIMIN & EDI & ANDRI & DADANG )
2025-12-15
9 months ago
NR.EL-01 Wahyu Adi Triono 363-SR1 Issue high noise 7 gE
Add grease motor at FS and LS measure vibration & noise result below 4 mm/s and below 2 gE ( EDI & ROMY )
2025-12-09
9 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-2K1 PMR service analyzer
Clean up flange probe - probe - filter sample line - sample line tube - diaphragm pump - filter balston - dryer gas pump from dirty of dust use instrument air supply. Check function humidity sensor and filter humidity result function sensor good and filter humidity good condition ( EDI & ADI & ROMY )
2025-12-09
9 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Prepare presentation TPM
Do prepare presentation for TPM ( JAJAT & RIZAL & MUHAIMIN )
2025-12-15
9 months ago
NR.EL-01 Wahyu Adi Triono 463-KL1-&-BURNER-FLOOR Connect welding point
Do connect welding point area kiln and burner ( MUHAIMIN & ANDRI & DADANG & EVE SAFIR )
2025-12-15
9 months ago
NR.EL-01 Wahyu Adi Triono 413-3B1-&-3B2-&-463-KL1-&-473-CC1-&-443-PH1 clean up panel I/O
Do clean up panel I/O area blending east-blending west, KILN, Cooler and PH from dirty of dust use hand blower and equipment cleaning tool ( RIZAL & ADI & ROMY )
2025-12-15
9 months ago
NR.EL-01 Wahyu Adi Triono 443-FN1 AUTO Balancer support Mr. Eko Juan observation problem
Do replace controller result AUTO Balancer ready ( EKO & AGUS )
2025-12-08
10 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Complete also scan WBI & PMR support for AUDIT
Do complete data check sheet WBI and PMR 2025 for WBI elevator month July to November 2025 and calibration month of August 2025 ( JAJAT & ADI )
2025-12-08
10 months ago
NR.EL-01 Wahyu Adi Triono 443-PH1 Cross check temperature preheater
Do cross check indication temperature at preheater. Adjust range at temperature transmitter to make same indication between local and CCR ( RIZAL & ANDRI )
2025-12-08
10 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-443-PH1 PMR Service Critical Motor MD + FN (Raw Mill) + check RTD Motor ( special T6 )
Clean up area motor and filter motor. Measure vibration -noise - temperature for FS and LS motor. Add grease motor 25 times and 30 times for FS and LS motor. Also check RTD motor T6 at 363 MD1 result resistance RTD 144 ohm( AGUS & MUHAIMIN )
2025-12-08
10 months ago
NR.EL-01 Wahyu Adi Triono 463-KL1-&-L63-RM1 PMR Service Critical Motor Kiln + CM
Clean up area motor and filter motor. Measure vibration - noise - temperature FS and LS motor. Add grease motor 15 times - 25 times for FS and LS motor ( EDI & DADANG )
2025-12-05
10 months ago
NR.EL-01 Wahyu Adi Triono WF-LIMESTONE Observation issue activation weigh feeder limestone high grade
Do observation at WF limestone high grade result ok ( RIZAL & MUHAIMIN )
2025-12-05
10 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Prepare Motor Rewinding (Blower Fan)
Do prepare motor for rewinding at workshop ( MUHAIMIN & JAJAT & DADANG & EDI )
2025-12-05
10 months ago
NR.EL-01 Wahyu Adi Triono ER#-&-ER4-&-ER5-&-ER6 Cleaning MCC room
Do clean up MCC room for ER3 - ER4 - ER5 - ER6 from dirty of dust. Mop electrical room with equipment cleaning tool ( AIMAN )
2025-12-05
10 months ago
NR.SHIFT Wahyu Adi Triono L1C-TR1 Prepare part project CCTV truck lift
Prepare part for project installation CCTV at L1C TR1 ( AGUS & MUHAIMIN )
2025-12-05
10 months ago
NR.EL-01 Wahyu Adi Triono L1C-TR1 Reposition probe sensor material level
Reposition probe sensor material level at L1C TR1. Test function probe sensor material level result ok function normal ( RIZAL & ANDRI & DADANG )
2025-12-05
10 months ago
NR.EL-01 Wahyu Adi Triono 443-EL1 PMR Serv. Elevator PH NAR1 & WBI Sump El
Do PMR Serv. Elevator PH NAR1 & WBI Sump El. Clean up 8th floor, 1st to 8th every door of elevator door from dirty of dust. Note lamp indication inside elevator off for 5th and 2nd floor ( EDI & ADI )
2025-12-05
10 months ago
NR.EL-01 Wahyu Adi Triono 413-3B1&-3B2-&-473-CC1 WBI Elec & Ins & Check I/O & S Pump Blending and Cooler
Do WBI Elec & Ins & Check I/O & S Pump Blending & ,Cooler. Test function sump pump motor result ok function Note need to clean up sensor sump pump at IDO tank ( EDI & ADI )
2025-12-04
10 months ago
NR.EL-01 Wahyu Adi Triono 363-MD1 PMS Raw Mill
Do clean up CB room and finding  2 ea CB already shorth, Replace CB ( AGUS & RIZAL & ANDRI & DADANG )
2025-12-04
10 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Prepare Motor Blower Rewinding
Prepare rewinding motor blower 463 FX6 ( EDI & ADI )
2025-12-04
10 months ago
NR.EL-01 Wahyu Adi Triono L1C-TR1 Prepare part project CCTV truck lift
Prepare part of project CCTV at truck lift ( AGUS & RIZAL & ANDRI & DADANG )
2025-12-04
10 months ago
NR.EL-01 Wahyu Adi Triono L1C-TR1-&-L3C-RE1 Cleaning panel of coal ( PM )
Do clean up panel of coal ( JAJAT & AIMAN )
2025-12-04
10 months ago
NR.EL-01 Wahyu Adi Triono 443-PH1-&-463-KL1- WBI Elec & Ins & Check I/O GCT, EP,PH&KL
Do WBI Elec & Ins & Check I/O GCT, EP,PH&KL. Measure vibration - noise - temperature FS and LS write at form for abnormal condition. Make notification for abnormal condition ( ADI & EVE SAFIR )
2025-12-04
10 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-423-BF1-&-FEED-BIN WBI Electric & Ins & Check I/O Feed Bin
Do WBI Electric & Ins & Check I/O Feed Bin. Measure vibration -  noise - temperature FS and LS for motor ( EDI )
2025-12-03
10 months ago
NR.SHIFT Wahyu Adi Triono 393-FN3 Issue motor burned
Do dismantle motor bring to workshop. Install motor spare at location also measure ampere motor R-S-T result ok ( EDI & DADANG )
2025-12-03
10 months ago
NR.SHIFT Wahyu Adi Triono L1C-TR1 Observation part needed for installation CCTV
Do estimation part need for project installation CCTV ( RIZAL & EDI & DADANG )
2025-12-03
10 months ago
NR.EL-01 Wahyu Adi Triono L1C-TR1 Install sensor material level and Cleaning radio link and Control
Fabrication and installation sensor material level do monitoring function sensor result ok. Do clean up radio link and control ( RIZAL & ANDRI & AIMAN )
2025-12-03
10 months ago
NR.EL-01 Wahyu Adi Triono 463-FX6 Issue motor burned
Dismantle motor shell cooling kiln bring to workshop. Install motor spare at location test run function result normal motor running ok ( AGUS & EDI & DADANG )
2025-12-01
10 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-2K1 PMR service analyzer
Clean up flange probe, probe, filter sample line, diaphragm pump, filter balston, dryer gas pump from dirty of dust. Check function humidity sensor and filter humidity, result function sensor normal and filter humidity good condition ( RIZAL & ANDRI )
2025-12-01
10 months ago
NR.EL-01 Wahyu Adi Triono 463-KL1-T1 Issue reading temperature abnormal
Replace thermowell because existing bad condition. Cross check reading temperature result around 1020 degree celcius ( RIZAL & ANDRI )
2025-12-01
10 months ago
NR.EL-01 Wahyu Adi Triono 463-KL1-&-473-CC1 PMR Critical Motor Area Kiln
Clean up area motor and filter motor. Measure vibration - noise  -  temperature FS and LS. Add grease 10 times  - 15 times for FS and LS motor ( AGUS & EVE SAFIR )
2025-11-28
10 months ago
NR.EL-01 Wahyu Adi Triono 363-MD1-&-423-FN1-&-L63-MD1 Issue high noise information from CBM Mr. Najib
Add grease motor 15 times for FS and LS motor. Measure vibration result below 4 mm/s and noise below 2 gE ( EDI & DADANG )
2025-11-28
10 months ago
NR.EL-01 Wahyu Adi Triono 443-PH1 Continue repare lighting lamp area preheater 7th floor
Install pipe for cable power lighting lamp. Connection cable power lighting lamp test on result lighting lamp ON ( EDI & DADANG )
2025-11-28
10 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Continue fabrication filter HRG
Do fabrication filter HRG ( ANDRI & DADANG )
2025-11-28
10 months ago
NR.EL-01 Wahyu Adi Triono 423-FN1 Support AutoBalancer Test
Do support test for AUTOBALANCER result normal ( JAJAT & AGUS & ANDRI )
2025-11-28
10 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Complete data check sheet WBI and PMR 2025
Completing data check sheet WBI and PMR year of 2025 prepare for AUDIT ( ADI & EDI )
2025-11-27
10 months ago
NR.EL-01 Wahyu Adi Triono L1C-TR1 Prepare CCTV for Truck lift (2 each)
Prepare CCTV 2 each for L1C TL1 ( AGUS & JAJAT )

2025-11-27
10 months ago
NR.EL-01 Wahyu Adi Triono 443-PH1 Continue repare lighting lamp area preheater
Install panel junction box - pipe - pulling cable power from lighting lamp to junction box ( EDI & ADI & EVE SAFIR & DADANG )
2025-11-27
10 months ago
NR.SHIFT Wahyu Adi Triono 443-FN1 AutoBalancer Info Error (Check all sensor)
Check sensor AUTOBALANCER result normal (AGUS & ANDRI & DADANG )
2025-11-27
10 months ago
NR.EL-01 Wahyu Adi Triono 393-SG9 Issue indication abnormal for open and closed
Check function limit switch open and close at local, test function open and close but indication still failure. Found stick limit switch for closed bad condition replace stick limit switch test function open and closed result indication normal ( EDI & ADI & EVE SAFIR & DADANG )
2025-11-26
10 months ago
NR.EL-01 Wahyu Adi Triono ELECTRIC-ROOM Inspection electrci room ( make sure there is keys replace if there is no inspection all electric room )
Do inspection electric room 3-4-5-6 and there is key for door electric room ( AIMAN )
2025-11-26
10 months ago
NR.EL-01 Wahyu Adi Triono L1C-TL1 Prepare CCTV for Truck lift ( 2 each )
Do prepare CCTV 2 each for truck lift ( AGUS & JAJAT )
2025-11-26
10 months ago
NR.EL-01 Wahyu Adi Triono 443-PH1 Inspection lighting area 443 PH1 4th floor - 6th- 7th - 8th floor
Check lighting lamp at 4h floor result 1 lighting lamp off, 6th floor 1 lighting lamp off, 7th floor 3 lighting lamp off, 8th floor result 7 lighting lamp off. Replace lighting lamp 3 each at 7th floor  test on result 1 lighting lamp ON, connecting power cable lighting lap at 6th floor join with AFR lighting lamp result lighting lamp ON ( EDI & ADI & DADANG )
2025-11-26
10 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-2K1 PMR service analyzer also replace 3 way valve
Clean up flange probe - probe - filter sample - sample line - diaphragm pump - filter balston - dryer gas pump from dirty of dust. Check function of humidity sensor and filter humidity result function humidity sensor normal and filter sensor good condition. Replace 3 way valve at 463 2K1 ( RIZAL & EVE SAFIR & ANDRI )
2025-11-26
10 months ago
NR.EL-01 Wahyu Adi Triono 423-2K1 YM CEMS support MCAL
Do support YM CEMS for MCAL with Mr. Hannes and Mr. Adrianus from Kiss Industrial Company ( RIZAL & ANDRI & KISS COMPANY )
2025-11-25
10 months ago
NR.EL-01 Wahyu Adi Triono 423-2K1 Issue problem at FIDOR
Flame off for FIDOR. Check supply H2 set to 3 bar supply gas input H2 at FIDOR available, reset air instrument air suply from normal to 0 PSI and resetting normal again also clean up connector for H2 gas at FIDOR found there is some dirty inside .Found fuse 4A at MCS 100E blown out, replace fuse with 6A result found there is jumpered cable at card. Dismantling jumpered cable at power on result ok Note FIDOR still flame off ( HANNES & JAJAT & ADI )
2025-11-25
10 months ago
NR.EL-01 Wahyu Adi Triono 363-MD1 Issue high winding temperature information from CBM Mr. Najib
Clean up filter 363 FA2. Check thermal stater up 80% because high fluctuation ampere until 265 A ( JAJAT & AGUS )
2025-11-25
10 months ago
NR.EL-01 Wahyu Adi Triono 463-MD1 Issue high noise information from CBM Mr.Najib
Clean up area motor and filter motor. Measure vibration and noise motor FS and LS result FS HVA: 1.1 to 3.7 mm/s and 1.60 to 3.44 gE LS HVA: 1.2 to 2.9 mm/s and 0.65 to 3.34 gE ( JAJAT & AGUS )
2025-11-25
10 months ago
NR.EL-01 Wahyu Adi Triono 393-SC3 Fabrication cable rel and make position of cable and install terminal of 393 SC3 SGD-SGE-SGF
Do fabrication cable rel and make cable position and install  terminal 393 SC3 for SGD - SGE - SGF ( EDI & ANDRI & DADANG )
2025-11-25
10 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Prepare CCTV for truck lift 2 each
Do prepare  CCTV for truck lift 2 each ( AGUS )
2025-11-25
10 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1 Front Cover probe broken
Replace front cover probe ( JAJAT & ANDRI )
2025-11-24
10 months ago
NR.EL-01 Wahyu Adi Triono HRG Issue pump clorine abnormal function
Modification pipe way clorine ( JAJAT & EVE SAFIR )
2025-11-24
10 months ago
NR.EL-01 Wahyu Adi Triono L63-BF1 Issue leakage compartement 2 & 8
All solenoid  are working, replace big membrane but still find leakage at small s/v ( RIZAL & ADI & ANDRI )
2025-11-24
10 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-L63-CM1-463-KL1-473-CC1 PMR service critical motor RM-KL-CC
Clean up area motor and filter motor. Measure vibration-noise-temperature FS and LS. Add grease motor 20 times-25 times-30 times for FS and LS motor and check carbon brush ( AGUS & EVE SAFIR & DADANG )
2025-11-22
10 months ago
NR.EL-01 Wahyu Adi Triono 393-SC3-&-ER3 Pulling cable KDRT, also pulling cable SGD - SGE - SGF; fabrication speed motion for 393 SC3; ER3: pulling cable remote VCS, signal S & G
Pulling cable of KDRT also fabrication speed motion and pulling cable SGD-SGE-SGF for 393 SC3 and Pulling cable at ER3 for remote VCS and signal S & signal G ( JAJAT & AGUS & RIZAL & EDI & ADI & MUHAIMIN & ANDRI & DADANG )
2025-11-21
10 months ago
NR.EL-01 Wahyu Adi Triono 33-WF1 Calibration zero and span
Do calibration zero and span result zero: 0.0 t/h span 162 t/h ( calculation 52.5 / 0.42 x 0.36 x 3.6 = 162 t/h ) ( RIZAL & ANDRI )
2025-11-21
10 months ago
NR.EL-01 Wahyu Adi Triono 363-CV1 Issue oil come inside motor
Dismantling motor bring to workshop, replace bearing. Install motor measure ampere motor result 6.03 ampere - 6.43 ampere -7.43 ampere also measure vibration and noise motor result 0.0 mm/s and 0.45 gE ( JJAJAT & AGUS & EDI & MUHAIMIN & DADANG )
2025-11-21
10 months ago
NR.EL-01 Wahyu Adi Triono ER3;-ER4;-ER5;-ER6 Inspection ALL ER
Do clean up electric room use brush and vacuum cleaner and continue mop electric room also clean up filter cabinet ( AIMAN )
2025-11-21
10 months ago
NR.EL-01 Wahyu Adi Triono ER3 Observation extend DI at 363 FN1
Prepare cable installation  ( JAJAT & RIZAL )
2025-11-21
10 months ago
NR.EL-01 Wahyu Adi Triono 473-FA1;-473-FA3;-473-FA4;-473-FA6 Add grease motor issue high noise motor up to 2 gE information from CBM Mr. Najib
Add grease motor cooler measure noise motor result decrease below 2 gE for 473 FA1 - 473 FA3 - 473 FA4 - 473 FA6 ( EDI & ADI )
2025-11-21
10 months ago
NR.EL-01 Wahyu Adi Triono L1C-TL1 Repare Short cable
Replace short cable for lighting lamp. Test on lighting lamp result ok normal ( AGUS & MUHAIMIN & ANDRI )
2025-11-21
10 months ago
NR.EL-01 Wahyu Adi Triono L1C-BC1-&-L1C-BC2-&-L1C-BC3 Repare / instal lighting lamp tail L1C-BC1-3
Replace blinking lighting lamp west side 2 each for room of L1C BC1-3 and east side 1 each at L1C BC2. Test on result lighting lamp ok all lighting lamp on ( EDI & ADI & DADANG )
2025-11-20
10 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Complete data check sheet PMR and WBI month of november 2025
Do completing data check sheet PMR analyzer L63 2K1 - L63 2K2 - L63 2K3 - 483 2K1 - 463 2K1 - 443 2K1 - 423 2K1; PMR IR TAD - T scanner - CCTV - Camera burner; PMR service hoist crane; PMR service critical motor KL & CM; WBI electrical & instrumentation bottom blending - kiln - cooler - clinker silo ; WBI electrical & instrumentation top blending - CT - PH - kiln; WBI electrical & instrumentation CM - truck lift - BC transport - tripper - reclaimer coal; WBI electrical & instrumentation feed bin - raw mill - CT - dust transport  - BF for month of november 2025 ( JAJAT & ADI )
2025-11-20
10 months ago
NR.EL-01 Wahyu Adi Triono L1C-TL1 Trucklift PM ( repair support for LCS BC1-3, observation safety device BD-ML, relocation cable BD of tripper )
Repaire Rel LCS BC1-3, Dismantling  unuse cable, install and fabrication new lighting lamp, repaire / replace solenoid water L1-BC5. repaire  pull core at TR1, observation installation LAN at L1C TL1 ( JAJAT & AGUS & RIZAL & EDI &  ANDRI & MUHAIMIN & DADANG )
2025-11-19
10 months ago
NR.EL-01 Wahyu Adi Triono L1C-BC4 Replace lighting lamp off
Install 2 eah lighting lamp LED ( EDI & ADI & DADANG )
2025-11-19
10 months ago
NR.EL-01 Wahyu Adi Triono 483-FN1-M1 install motor
Do install motor at 483 FN1 M1. Test function motor measure ampere motor with open damper 65% result 48.7 ampere; 100% result 5.34 ampere with setting OL 7 ampere ( JAJAT & AGUS & RIZAL & MUHAIMIN & DADANG )
2025-11-19
10 months ago
NR.EL-01 Wahyu Adi Triono L63-MD1-&-483-BL5-&-493-FN5 Issue high vibration up 24 mm/s and high noise up 6 gE
Add grease motor 15 times for FS and LS. Measure vibration and noise motor result below 4 mm/s also below 2 gE. Note 493 FN5 there is no point for grease motor also measure vibration from base plat motor result high vibration ( EDI & ADI )
2025-11-19
10 months ago
NR.EL-01 Wahyu Adi Triono 363-FA2 V-belt motor are cracked bad condition
Do replace v-blet v-800 3  each ( EDI & ADI )
2025-11-18
10 months ago
NR.EL-01 Wahyu Adi Triono ANALYZER-ROOM Cleaning up room analyzer
Clean up analyzer room from dirty of dust use brush  and instrument air supply ( AIMAN )
2025-11-18
10 months ago
NR.EL-01 Wahyu Adi Triono 423-2K1 PMR service CEMS
Clean up purge air unit motor and filter purge air unit. Also clean up swivel window T/R unit and R unit for dust hunter and flange with tube from dirty of dust. Do alignment dust hunter. Clean up transducer A & transducer B for flowsic 100. Clean up CEMS room and gas botle room and fan cabinet MCS 100 E from dirty of dust ( RIZAL & ENDEN )
2025-11-18
10 months ago
NR.EL-01 Wahyu Adi Triono 483-FN1-M1-&-483-FN1-M2 Issue motor noise for M1 and trip OCR also breaker. Observation motor
Check actual process at CCR, found 483 FN1 M2 running, but 483 FN1 M1 stop. Check at local use meger test found 2 phase ground. Bring down existing motor. Found 3.7 KW same existing motor bring to workshop from ware house. Measure ampere motor stable 3.6 ampere ( JAJAT & AGUS & EDI & ADI & MUHAIMIN & DADANG & ENDEN )
2025-11-17
10 months ago
NR.EL-01 Wahyu Adi Triono L1C-TR1 Resetting position of material level and timer ML from 10 s to 5 s
Do resetting sensor material level and change timer from 10 second to 5 second ( RIZAL & ADI & ANDRI & DADANG )
2025-11-17
10 months ago
NR.EL-01 Wahyu Adi Triono L1C-BC4 Activated horn at L1C BC4
Do install horn at L1C BC4 and connected cable power for horn and cable DO at ER6. Test function horn result success  ( JAJAT & AGUS & ADI & MUHAIMIN & DADANG )
2025-11-17
10 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-2K1 PMR service analyzer
Clean up flange probe - probe - filter sample line - sample line - diaphragm pump - filter balston - dryer gas pump from dirty of dust. Check function humidity sensor result function normal also check filter humidity sensor result condition filter good ( RIZAL & ANDRI )
2025-11-17
10 months ago
NR.EL-01 Wahyu Adi Triono 463-KL1-&-L63-RM1 PMR critical motor area KILN & CM
Clean up area motor and filter motor. Measure vibration - noise - temperature of FS and LS. Add grease 20 times - 30 times for FS and LS motor ( AGUS & DADANG )
2025-11-17
10 months ago
NR.EL-01 Wahyu Adi Triono 363-RM-&-463-KL1 PMR critical motor area RM & KILN
Clean area motor and filter motor also filter 363 FA2. Measure vibration, noise and temperature of FS and LS. Add grease 10 times - 15 times - 25 times for FS and LS motor. Repaire AUTO grease pump for 363 FN2 ( MUHAIMIN & ADI )
2025-11-14
10 months ago
NR.SHIFT Wahyu Adi Triono HRG Prepare subtitution and fabrication filter substitution HRG
Take materials elbow plate from warehouse. Fabrication support filter substitution at workshop ( ANDRI & MUHAIMIN & DADANG )
2025-11-14
10 months ago
NR.EL-01 Wahyu Adi Triono 463-KH1-P1 Issue indication pressure low at operator CCR
Cross check indication pressure at local. Do blow up tubing for pressure and zero adjust of pressure transmitter and measure pressure hood draft result indication pressure at local from 0.1 to 0.7 compare with reading CCR same  ( RIZAL & ANDRI )
2025-11-14
10 months ago
NR.EL-01 Wahyu Adi Triono 423-FN1-&-473-FA6 Issue high noise motor 6.3 gE for 423 FN1 & 13.6 gE also 5.6 gE for 473 FA6
Add grease motor 15 times for FS and LS, measure noise motor result for 423 FN1 FS V: 1.49 gE H: 0.67 gE A: 1.48 gE - LS A: 1.18 gE V: 1.07 gE H: 1.33 gE; for 473 FA6 LS: 1.15 gE FS: 1.04 gE ( MUHAIMIN & ADI )
2025-11-14
10 months ago
NR.EL-01 Wahyu Adi Triono WORKSHOP-ELECTRIC-1 Prepare take plat cable 12 core from NR2
Do take plat cable 12 core at electric Nr2 bring to workshop electric Nr1 ( AIMAN & DADANG )
2025-11-14
10 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-2K1 PMR service analyzer
Clean up flange probe, probe, filter sample, sample line, diaphragm pump, filter balston from dirty  dust. Check function humidity sensor and filter humidity result function humidity sensor normal and filter humidity good condition. Note replace dryer gas at 463 2K1 with spare unit because existing fault ( RIZAL & ANDRI )
2025-11-14
10 months ago
NR.EL-01 Wahyu Adi Triono 483-BL7 Issue cooling fan off
Take cooling fan at ER3, fabrication supporting cooling fan at workshop. Install cooling fan at 483 BL7 test function result fan running normal ( AGUS & DADANG )
2025-11-14
10 months ago
NR.EL-01 Wahyu Adi Triono HOIST-L1C-TR1 Hoist L1C TR1 issue can not start at local ( support for certification hoist by 3rd party )
Check at ER6 found power of for hoist at L1C TR1, make On for breaker hoist test function result can start at local ( ADI & MUHAIMIN & JOKO SAFETY )
2025-11-13
10 months ago
NR.EL-01 Wahyu Adi Triono L1C-TR1 Install senso material level and power supply 220 VAC
Fabrication support for sensor material level at workshop. Install sensor material level at L1C TR1. Do test function L1C TR1 and activation sensor material level, result function sensor normal. Install power 220 VAC at L1C TR1, test function power 220 VAC result normal ( JAJAT & RIZAL & ADI & MUHAIMIN & DADANG )
2025-11-13
10 months ago
NR.EL-01 Wahyu Adi Triono ER4-&-ER5 Issue sealing trafo room bad condition information finding from CBM
Add sealing  for area finding CBM Mr. Najib for trafo ER4 and ER5 ( AGUS & DADANG )
2025-11-13
10 months ago
NR.EL-01 Wahyu Adi Triono 483-BL7 Issue noise high 5.6 gE and high vibration 4.5 mm/s
Add grease motor result noise reduce back to normal below 2 gE and vibration below 4 mm/s ( AGUS & DADANG )
2025-11-13
10 months ago
NR.EL-01 Wahyu Adi Triono 473-FA6 Cross check pressure point
Clean up tubing sample pressure point and flange pressure point from dirty of dust result pressure back to normal condition ( JAJAT & ADI & MUHAIMIN )
2025-11-13
10 months ago
NR.EL-01 Wahyu Adi Triono 423-2K1 CEMS problem board abnormal
Check at site found 5 VDC drop to 4.8 VDC increase voltage to 5.0 VDC and clean up filter and tighten cable connection result CEMS back to normal ( RIZAL & ANDRI )
2025-11-13
10 months ago
NR.EL-01 Wahyu Adi Triono 483-BL7 Issue noise high 5.6 gE and vibration 4.5 mm/s
Add grease motor result noise reduce back to normal below 2 gE and vibration below 4 mm/s ( AGUS & DADANG )
2025-11-12
11 months ago
NR.EL-01 Wahyu Adi Triono 473-SC3 Issue pulse motion bad condition
Clean up probe sensor and propeller and tighten cable at pre amplifier card result pulse motion back to normal and already indication at CCR operator ( MUHAIMIN & DADANG )
2025-11-12
11 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Complete data check sheet report PMR and WBI month november 2025
Do completing data check sheet report for PMR analyzer L63 2K1-L63 2K2-L63 2K3-483 2K1-463 2K1-443 2K1-423 2K1; PMR camera burner-IR TAD-T scanner-CCTV; PMR  service critical motor 363 MD1-363 FN1-363 FN2-423 FN1-443 FN1-L63 MD1-L63 FN1-473 FN7-463 MD1 for month of november 2025 ( JAJAT & ADI )
2025-11-12
11 months ago
NR.EL-01 Wahyu Adi Triono 393-CP1 Install lighting lamp
Installing lighting lamp at 393 CP1, test function lighting lamp result normal on ( MUHAIMIN & DADANG )
2025-11-12
11 months ago
NR.EL-01 Wahyu Adi Triono 463-KL1-&-473-CC1 Continue PMR service critical motor are KL & CM
Clean up area motor and filter motor. Measure vibration, noise and temperature for FS and LS. Add grease motor for FS and LS for 30 times 35 times area L63 RM & 463 KL1 ( AGUS )
2025-11-12
11 months ago
NR.EL-01 Wahyu Adi Triono L63-BF1 Issue problem at compartemen 4 & compartemen 11
Replace solenoid valve 2 each at compartemen 4 and compartemen 11, test function solenoid valve of purging result ok function normal ( RIZAL & ANDRI )
2025-11-11
11 months ago
NR.EL-01 Wahyu Adi Triono HRG Issue chiller problem
Check at local, do jumper cable test on, found i motor bad condition. Dismantling motor chiller, bring to workshop. Install back support and cover motor chiller. Clean up area HRG from dirty of dust  use instrument air also filter HRG ( JAJAT & AGUS & ADI & ANDRI & MUHAIMIN & DADANG )
2025-11-11
11 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-463-KL1 PMR Service Critical Motor & LSR RM & CM1 & KL
Clean up area motor and filter motor. Measure vibration, noise and temperature for FS and LS. Add grease motor for FS and LS for 20 times, 25 times and 30 times ( AGUS & DADANG )
2025-11-10
11 months ago
NR.EL-01 Wahyu Adi Triono L1C-TR1 Continue pending Job
Activation alarm Over travel,  Brake Motor, Install Motion and propeller SX1-SX3 also propeller at BC3 ( AGUS & JAJAT & RIZAL & ADI & ANDRI & MUHAIMIN & DADANG )
2025-11-10
11 months ago
NR.EL-01 Wahyu Adi Triono L63-BF1 Issue compartemen 10 Abnormal
Replace membran solenoid valve.  Test function result ok ( RIZAL & ANDRI )
2025-11-10
11 months ago
NR.EL-01 Wahyu Adi Triono MAIN-GATE-ACCES-CONTROL Inspection welding and electrical tools of PT Indoporlen and PT RMP
Do inspection electrical and welding tools of PT INDOPORLEN & PT RMP Tagging with yellow color for all equipment ( ADI & JAJAT )
2025-11-07
11 months ago
NR.EL-01 Wahyu Adi Triono 473-GQ1 Prepare fabrication re-position Sensor Pressure 473-GQ1
Do fabrication for reposition sensor pressure. Install at location result indication normal ( RIZAL & ANDRI & DADANG )
2025-11-07
11 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-463-KL1-&-L63-RM1 WBI Switchgear, Cap & Trafo RM, KL & CM1
Do WBI Switchgear, Cap & Trafo RM, KL & CM1 ( MUHAIMIN )
2025-11-07
11 months ago
NR.EL-01 Wahyu Adi Triono BOTTOME-BLENDING--473-CC1-493-3S1 WBI Elec & Ins & Check I/O & S Pump Bl,C
Clean up panel I/O area clinker silo-cooler-bottom blending outside panel use equipment cleaning tools. Check function of sump pump result norma function note repaire propeller sump pump L1C BC4 because at outside tank test function sump pump result ok ( EDI & ADI )
2025-11-07
11 months ago
NR.EL-01 Wahyu Adi Triono PPUP-WORKSHOP Check Tools Area PPUP
Inspection electrical tools of PPUP for mixer-cutting machine-portable compressor-genset. Repaire support for cutting machine reason is not requirement safety plant. Tagging equipment with yellow color ( EDI & ADI )
2025-11-06
11 months ago
NR.EL-01 Wahyu Adi Triono L1C-TR1 Issue for L1C BC6 can not start and tidy up cable PLC
Check at program found there is some failure at L1C BC6 after reset and run AUTO program result L1C BC6 can run. Tidy up un use cable at PLC result ok ( JAJAT & AGUS & EDI & ADI & MUHAIMIN & DADANG )
2025-11-06
11 months ago
NR.EL-01 Wahyu Adi Triono 473-FA4 Issue indication abnormal
Check at location found leakage of tubing sample pressure and some material block inside tubing, repaire leakage tubing and clean up sample line tubing result indication pressure back to normal at CCR ( RIZAL & ANDRI )
2025-11-05
11 months ago
NR.EL-01 Wahyu Adi Triono L1C-TR1 Continue Project L1C-TR1
Test run indication signal ready-run-trip-emergency for L1C BC1 to L1C BC7, also signal pcs and bd-tonase result ok ( JAJAT & AGUS & RIZAL & ADI & ANDRI & MUHAIMIN & DADANG & EDI )
2025-11-04
11 months ago
NR.EL-01 Wahyu Adi Triono L1C-TR1 PROJECT L1C-TR1
Do connection wiring cable for project L1C TR1. Do  test function for start-running-trip-failure for L1C BC1-L1C BC2-L1C BC3-L1C BC7-L1C SX1-L1C SX2-L1C SX3  result ok also measure ampere motor result ampere of SX: 2.1 to 4.2 A for BC: 8.8 to 9.4 A ( JAJAT & AGUS & RIZAL & EDI & ADI & ANDRI & MUHAIMIN & DADANG & AIMAN )
2025-11-04
11 months ago
NR.EL-01 Wahyu Adi Triono 363-BF1 Issue purging abnormal
Check function solenoid valve purging bag filter found 8 membran for solenoid valve bad condition. Replace 8 membran solenoid valve test function result normal function ( RIZAL & ANDRI )
2025-11-03
11 months ago
NR.EL-01 Wahyu Adi Triono HRG Replace clorine pump issue pump performance pump already decrase
Replace pump clorine with spare pump test function pump result ok ( EDI & ADI )
2025-11-03
11 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1 Indication temperature outlet fluctuation
Replace sensor temperature with spare result indication temperature normal ( RIZAL & ANDRI )
2025-11-03
11 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Final Drawing Upgrade L1C-TR1
Do final drawing for upgrade L1C-TR1 save at computer ( AGUS )
2025-11-03
11 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-463-KL1 PMR service critical motor LSR RM-CM
Do clean area motor and filter motor. Measure vibration, noise, temperature for FS and LS motor. Add grease for 20 times and 30 times for FS and LS motor ( EDI & ADI )
2025-11-03
11 months ago
NR.EL-01 Wahyu Adi Triono 463-KL1-&-L63-RM1 PMR Service Critical Motor & LSR Kiln & Cooler 1
Do clean area motor and filter motor. Measure vibration, noise, temperature for FS and LS motor. Add grease for 20 times and 25 times for FS and LS motor ( MUHAIMIN & DADANG )
2025-11-03
11 months ago
NR.EL-01 Wahyu Adi Triono L93-3S1 Issue Temp Bottom Bin increase- Check Solenoid Purging
Check at location bag filter result there is solenoid valve normal, replace 1 solenoid. Test function solenoid valve result ok normal. Check value temperature bin of coal result normal indication ( RIZAL & ANDRI )
2025-10-31
11 months ago
NR.EL-01 Wahyu Adi Triono 363-MD1 363 MD1 check - clean up - replace carbon brush
Clean up filter 363 FA2 for filter main drive, area motor and room carbon brush. Measure long all carbon brush found no 1-2-5-11-12 bad condition. Replace carbon with spare units for no 1-2-5-11-12 ( ADI & MUHAIMIN )
2025-10-31
11 months ago
NR.EL-01 Wahyu Adi Triono Y43-1G1 Service / replace pump antscalant
Replace pump antscalant test run function result ok ( RIZAL & EDI & DADANG )
2025-10-31
11 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1 IKGA probe Support
Do continue welding probe support and repainting area 463 2K1 ( RIZAL & EDI & DADANG & ANDRI & WIKAN & AIMAN )
2025-10-31
11 months ago
NR.EL-01 Wahyu Adi Triono ER6 Labelling cable ER6 - Tripper (L1C-TR1) + scun cable
Continue do labelling cable at ER6 and observation area tripper ( AGUS & ADI & MUHAIMIN )
2025-10-30
11 months ago
NR.EL-01 Wahyu Adi Triono L1C-TR1 Observation add 3 Modul DO PLC
Prepare Modul additional ( RIZAL & JAJAT )
2025-10-29
11 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-2K1 PMR service analyzer
Clean up flange probe, probe, filter sample line, sample line, diaphragm pump, filter balston from dirty of dust. Check function humidity sensor and filter humidity, result function humidity sensor good and filter humidity ok ( RIZAL & ANDRI )
2025-10-29
11 months ago
NR.EL-01 Wahyu Adi Triono 423-BF1 Install lighting lamp
Do installation lighting lamp at 423 BF1, test on lighting lamp result normal on ( EDI & DADANG )
2025-10-29
11 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Completing data PMR and WBI month october 2025
Do complete data check sheet PMR and WBI month of october 2025 ( JAJAT & ADI )
2025-10-29
11 months ago
NR.EL-01 Wahyu Adi Triono 443-EL1 lighting lamp inside elevator room off
Replace lighting lamp area inside elevator 2 each, test on result lamp normal on ( MUHAIMIN & AIMAN )
2025-10-29
11 months ago
NR.EL-01 Wahyu Adi Triono ER5 Lighting lamp issue off at ER5 outside
Replace lighting lamp with spare, test on result lighting lamp normal ( ADI & MUHAIMIN )
2025-10-28
11 months ago
NR.EL-01 Wahyu Adi Triono KILN-SCANNER Kiln Scanner (View Abnormal)
Replace limit switch of t scanner, test function result view good at CCR ( RIZAL & ANDRI )
2025-10-28
11 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-L63-RM1 PMR Service Critical Motor & LSR RM & CM1
Clean up area motor and filter motor. Measure vibration - noise - temperature FS and  LS motor. Add grease motor 25 times - 30 times - 35 times for FS and LS motor ( MUHAIMIN & DADANG )
2025-10-28
11 months ago
NR.EL-01 Wahyu Adi Triono BURNER-FLOOR Connect Motor Hoist Area Burner
Do connecting motor hoist area burner ( MUHAIMIN & DADANG )
2025-10-28
11 months ago
NR.EL-01 Wahyu Adi Triono 363-SR1 Cleaning Finishing room trafo 363-SR1
Continue finishing room trafo 363 SR1 from dirty of dust use equipment cleaning tools and instrument air supply ( JAJAT & DEVI )
2025-10-28
11 months ago
NR.EL-01 Wahyu Adi Triono L63-BF1 Solenoid compartement 8 issue purging but no air supply
Check at location found 1 solenoid valve bag filter is not function normal, replace 1 solenoid valve test function result normal ( RIZAL & ANDRI )
2025-10-28
11 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Complete check sheet PMR or WBI month of october 2025
Completing data check sheet PMR analyser L63 2K1-L63 2K2-L63 2K3-483 2K1-463 2K1-443 2K1-423 2K1; PMR IR TAD-T scanner-CCTV-Camera Burner; PMR Hoist and Crane; WBI Bottom Blending-KILN-Cooler-Clinker Silo; WBI Top Blending-CT-PH-KILN; WBI CM-Truck Lift-BC Transport Tripper-Reclaimer Coal; WBI Feed Bin-Raw Mill-CT-Dust Transport-BF month of october 2025 ( JAJAT & ADI )
2025-10-27
11 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1 fabrication and installation rel also rooler
Fabrication for installation rel rooler 463 2K1Installation at local, test run insert probe and retract probe flange result normall ( JAJAT, AGUS, RIZAL, ANDRI, DADANG, MUHAIMIN )
2025-10-27
11 months ago
NR.EL-01 Wahyu Adi Triono 363-SR1 Cleaning trafo room 363-SR 1
Do clean up trafo room from dirty of dust use equipment cleaning tools and instrument air ( JAJAT & ADI & AIMAN )
2025-10-24
11 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Wiring panel welding of burner floor
Do wiring of panel welding for burner floor. Panel welding ready to install ( AGUS & MUHAIMIN )
2025-10-24
11 months ago
NR.EL-01 Wahyu Adi Triono 423-BF1 Pulling cable power solenoid valve and install solenoid valve 2 groups
Do pulling cable 2 line for power solenoid valve 2 groups and installation 2 groups solenoid valve ( JAJAT, AGUS, RIZAL, ADI, MUHAIMIN, ANDRI, DADANG )
2025-10-24
11 months ago
NR.EL-01 Wahyu Adi Triono 423-2K1-GEMBA-TPM- Clean up area outside CEMS shelter
Do GEMBA TPM clean area CEMS gas room, wall, roof from dirty of dust use equipment cleaning tools and instrument air supply ( JAJAT, ADI, AIMAN )
2025-10-23
11 months ago
NR.EL-01 Wahyu Adi Triono L63-MD1 Pulling cable power at L63-MD1
Pulling cable for power L63 MD1 ( AGUS & MUAHIMIN & ANDRI )
2025-10-23
11 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1 PMR service analyzer
Clean up flange probe-sample line-filter sample line-diaphragm pump-filter balston from dirty of coal. Check function humidity sensor and filter humidity result function humidity normal and filter good condition ( RIZAL & AIMAN )
2025-10-23
11 months ago
NR.SHIFT Wahyu Adi Triono ER6-&-ER5 PMR Clean Up MCC ER All Area Kiln Nar1
Do clean up MCC area ER 6 and ER5 from dust use broom and vacuum filter also filter cabinet from dirty of dust ( AIMAN )
2025-10-23
11 months ago
NR.EL-01 Wahyu Adi Triono 443-PH1-&-473-FA3 Install lighting lamp 4th floor 443 PH1 and fix also dismantling stop contact area cooler ex 473 FA3
Do install lighting lamp at 4th floor  test on lamp result ok, fix and dismantling stop  contact area ex cable 473 FA3 ( JAJAT & EDI & DADANG )
2025-10-22
11 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Sort it out and 5R part work shop
Do sort it out part and 5R part area workshop of electric ( JAJAT & AIMAN )
2025-10-22
11 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-2K1 PMR service analyzer
Clean up flange probe-probe-filter sample line-sample line-dryer gas pump-filter balston from dirty of dust. Check humidity sensor function and filter sensor result function sensor normal and filter good condition ( EDI & ADI )
2025-10-22
11 months ago
NR.EL-01 Wahyu Adi Triono 423-2K1 Support Yearly Maintenance CEMS
Do support yearly maintenance CEMS with KISS INDUSTRIAL employee hannes and adrianus ( RIZAL & ANDRI & DADANG & KISS INDUSTRIAL )
2025-10-21
11 months ago
NR.EL-01 Wahyu Adi Triono HRG Lamp of HRG blinking
Replace  lamp test lamp result lamp  on ( ANDRI )
2025-10-21
11 months ago
NR.SHIFT Wahyu Adi Triono 443-PH1 IR TAD issue indication temperature low
Cross  check by portable tools result normal compare between local and CCR are same ( RIZAL & MUHAIMIN )
2025-10-21
11 months ago
NR.EL-01 Wahyu Adi Triono 493-AC1 Prepare and connection welding point burner
 Do connection welding panel near 493 AC1 result finnish note wait input power welding at buttom cooler ( EDI & ADI & DADANG )
2025-10-21
11 months ago
NR.SHIFT Wahyu Adi Triono 423-2K1 YM CEMS
Yearly maintenance CEMS and do support KISS Industrial work YM CEMS ( RIZAL & MUHAIMIN & ANDRI & KISS INDUSTRIAL EMPLOYEE MR. HANNES - MR. ADRIANUS )
2025-10-21
11 months ago
NR.EL-01 Wahyu Adi Triono HRG Failure start
Reset Alarm , Start step-by-step , monitor di 60% ( AGUS & RIZAL )
2025-10-20
11 months ago
NR.EL-01 Wahyu Adi Triono 463-KL1 Observation instalation blower sheel kiln
Do observation for instalation motor sheel kiln ( RIZAL & MUHAIMIN & ANDRI )
2025-10-20
11 months ago
NR.EL-01 Wahyu Adi Triono 463-KL1-&--L63-RM1 PMR Service Critical Motor area Kiln & CM1
Clean up area motor and filter motor. Measure vibration-noise-temperature FS (NDE) and LS (DE) motor. Add grease motor for 25 times and 30 times for FS (NDE) and LS (DE) motor ( AGUS & DADANG )
2025-10-20
11 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-443-PH1 PMR Service Critical Motor area RM
Clean up area motor and filter motor. Measure vibration-noise-temperature FS (NDE) and LS (DE) motor. Add grease motor for 10 times and 15 times for FS (NDE) and LS (DE) motor ( EDI & ADI )
2025-10-18
11 months ago
NR.EL-01 Wahyu Adi Triono 443-PH1-;-473-CC1;-L63-RM1;-FEED-BIN Clean panel I/O
Do clean up panel I/O area preheater-cooler-coal mill hs-feed bin from dirty of dust use hand blower ( ADI & AMIT & SAIPUL )
2025-10-18
11 months ago
NR.EL-01 Wahyu Adi Triono 473-FA3 Pulling cable motor from local to ER5
Do pulling cable motor from local to ER5, test meger cable result ok. Do test run motor with different speed result ok ( JAJAT, AGUS, RIZAL, ADI, ANDRI, AIMAN, MIHAIMIN, DADANG )
2025-10-17
11 months ago
NR.EL-01 Wahyu Adi Triono 493-AC2 Prepare & Pulling Cable welding point Cooler
 Pulling cable and cleaning material cable rel ( JAJAT & AGUS & RIZAL & ADI & MUHAIMIN & ANDRI & DADANG & AIMAN )
2025-10-17
11 months ago
NR.EL-01 Wahyu Adi Triono 393-SC3 Installation and wiring 393-SC3 ( MCC part + LCS+ Motion )
Prepare part needed ready to install ( MUHAIMIN & ANDRI & DADANG )
2025-10-17
11 months ago
NR.EL-01 Wahyu Adi Triono 423-2K1 TPM Area CEMS
Do TPM area 423 2K1. Clean air tank, wall outside. Repainting blue color for air tank, green color for wall outside shelter 423 2K1, yellow color for roof outside ( JAJAT, AGUS, RIZAL, ADI, ANDRI, AIMAN, MUHAIMIN, DADANG )
2025-10-16
11 months ago
NR.EL-01 Wahyu Adi Triono 493-AC2 Relocation welding point
Relocation welding point  close to main distribution welding point ( AGUS & ANDRI & DADANG )
2025-10-16
11 months ago
NR.EL-01 Wahyu Adi Triono 493-3B1 Check Greasing and Cleaning Area Clinker Silo
Clean up  ALL LCS  , Motor, Greasing Motor 493-AC2/AC3 ( JAJAT & MUHAIMIN )
2025-10-16
11 months ago
NR.EL-01 Wahyu Adi Triono L63-RM1 PMR service analyzer
Clean up  flange probe-sample line-filter sample-diaphragm pump-filter balston-dryer gas pump from dirty of coal. Check humidity sensor function and filter humidity result function sensor normal and filter good condition ( RIZAL )
2025-10-16
11 months ago
NR.EL-01 Wahyu Adi Triono CIVIL-BUILDING-WORKSHOP Inspection electrical and welding tools of Civil Building
Inspection electrical tools of civil building tagging with yellow color. ( ADI & EVE AKPAN )
2025-10-15
11 months ago
NR.EL-01 Wahyu Adi Triono 493-AC2 Observation cable welding point area 493 AC2 and planning tap power
Do observation cable welding point for 493 AC2 and planning power tap ( MUHAIMIN & AIMAN )
2025-10-15
11 months ago
NR.EL-01 Wahyu Adi Triono 393-SC3-&-3-SG Prepare part needed for new installation 393-SC3 + 3 Slide Gate (MCC part + LCS+ Motion)
Do prepare part needed new installation 393 SC3 and 3 SG like MCC  & motion & LCS ( RIZAL & MUHAIMIN )
2025-10-15
11 months ago
NR.EL-01 Wahyu Adi Triono L1C-TR1 Cleaning Area L1C-TR1 (MCC + Radio Link)
Do clean up area L1C TR1 for MCC and radio link ( AIMAN )
2025-10-15
11 months ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Finishing Fabrication I/O additional 2nd floor
Do finishing fabrication I/O panel 2nd floor ( ANDRI & DADANG )
2025-10-15
11 months ago
NR.EL-01 Wahyu Adi Triono CIVIL-BUILDING-WORKSHOP Inspection electrical and welding tools
Inspection electrical and welding tools of Civil building work shop. Tagging equipment with yellow color. Note 2 extention cable unsafe to use, 1 circle machine because cable power failure and connector male and female failure ( ADI )
2025-10-14
11 months ago
NR.SHIFT Wahyu Adi Triono 393-SC3-&-3-SG Observation part needed new installation 393 SC3 and 3 slide gate
Observation part needed new installation 393 SC3 and 3 slide gate ( JAJAT & RIZAL & MUHAIMIN )
2025-10-14
11 months ago
NR.EL-01 Wahyu Adi Triono 443-PH1 Fabrication I/O additional 2nd floor
Fabrication I/O additional at 2nd floor ( MUHAIMIN & ANDRI & DADANG )
2025-10-14
11 months ago
NR.EL-01 Wahyu Adi Triono PT-TRUBA-JAGA-CITA Inspection electrical and welding tools
Do inspection electrical and welding tools of PT Truba Jaga Cita. Equipment tagging with yellow color ( Total electrical tools: 28 units, welding tools: 6 units ) ( ADI & EVE AKPAN )
2025-10-13
11 months ago
NR.EL-01 Wahyu Adi Triono 473-CC1 473 FA Cooler refill easylube + greasing
Add greaseing motor for FS and LS. Also refill easylube fan motor ( MUHAIMIN )
2025-10-13
11 months ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-2K1 PMR service analyzer
Clean up flange probe-probe-sample line-filter sample line-diaphragm pump-filter balston-dryer gas pump from dirty of dust. Check humidity sensor function and filter humidity result function humidity sensor normal and filter humidity good condition ( RIZAL &  ANDRI )
2025-10-13
11 months ago
NR.EL-01 Wahyu Adi Triono 393-BF3 Replace & Service PLC
Service PLC 393 BF3, test function result PLC normal ( AGUS & DADANG )
2025-10-13
11 months ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-L63-RM1 PMR Service Critical Motor & LSR RM & CM1
Clean area motor and filter motor. Measure vibration-noise-temperature FS and LS. Add grease 10 times-15 times-25 times and 30 times for FS and LS motor.( ADI & EVE AKPAN )
2025-10-10
1 year ago
NR.EL-01 Wahyu Adi Triono 363-RM1 Measure mV OZD
Measure mV OZD for area RM (  RIZAL & EVE TEGAR )
2025-10-10
1 year ago
NR.EL-01 Wahyu Adi Triono 363-MD1-&-363-FN1 Check and cleaning carbon brush
Cleaning carbon brush room and area motor. Measure long all carbon brush, replace carbon brush 1 because sort 3100 mm. Cleaning carbon brush room and area motor. Measure long all carbon brush for 363 FN1 M1 result ok  ( AGUS & MUHAIIMIN & EVE AKPAN )
2025-10-09
1 year ago
NR.EL-01 Wahyu Adi Triono L63-RM1 PMR service analyzer
Clean up flange probe-sample line-filter sample line-diaphragm pump-filter balston-dryer gas pump from dirty of coal. Check humidity sensor function and filter humidity result function humidity normal and filter humidity good condition ( RIZAL & EVE TEGAR & ANDRI )
2025-10-09
1 year ago
NR.EL-01 Wahyu Adi Triono 443-PH1 Observation power pump fire protection 5th floor
Connection cable power pump fire at 5th floor ( EDI & MUHAIMIN )
2025-10-09
1 year ago
NR.SHIFT Wahyu Adi Triono WORK-SHOP Continue fabrication Welding Point
Fabrication welding point at workshop ( AGUS & EVE AKPAN & DADANG )
2025-10-09
1 year ago
NR.EL-01 Wahyu Adi Triono 393-FA3 Observation cable signal S-G Observation cable signal S-G
Replace signal cable S-G test signal result ok ( RIZAL & EVE TEGAR & ANDRI )
2025-10-08
1 year ago
NR.EL-01 Wahyu Adi Triono 483-BL1 Replace Handle LCS failure
Replace LCS handle and test signal result ok ( MUHAIMIN & EVE AKPAN )
2025-10-08
1 year ago
NR.EL-01 Wahyu Adi Triono PT-PINCURAN-MAS Check Tool Pincuran Work Shop
Inspection electrical and welding tools of PT Pincuran Mas. Tagging equipment with blue color ( MUHAIMIN & EVE TEGAR & EVE AKPAN )
2025-10-07
1 year ago
NR.EL-01 Wahyu Adi Triono 443-PH1 Repare Welding Point 6th floor and dismantling Box ( ex-cable sensor 7th floor)
Do repare welding at 6th floor and dismantling box or ex cable sensor at 7th floor ( MUHAIMIN & DADANG )
2025-10-07
1 year ago
NR.EL-01 Wahyu Adi Triono ER4 Istall platform bottom ER4
Install platform bottom ER4 ( MUHAIMIN & ANDRI & AIMAN )
2025-10-07
1 year ago
NR.EL-01 Wahyu Adi Triono L63-RF1 Reposition speed sensor
Adjusting probe, monitor oke ( RIZAL & ANDRI )
2025-10-07
1 year ago
NR.EL-01 Wahyu Adi Triono HRG Repare Emergency Door HRG-WTP
Do repare welding evacute door + storage chemical room ( JAJAT & DADANG )
2025-10-07
1 year ago
NR.EL-01 Wahyu Adi Triono 443-EL1 PMR Serv. Elevator PH NAR1 & WBI Sump El
Do clean up room of elevator, door elevator from 1st to 8th floor from dirty of dust, cage of elevator from dirty of dust, drive of elevator also from dirty of dust use hand blower. Test function elevator from 8th to 1st floor result normal function. WBI sump pump of elevator ( AGUS & EVE AKPAN )
2025-10-07
1 year ago
NR.EL-01 Wahyu Adi Triono 443-PH1;-L63-RM1;-463-KL1 PMR CCTV, IR TAD & Kiln Scanner
Clean lens IR TAD, camera burner & T scanner-flange probe-camera CCTV from dirty of dust use cleaning tools ( ADI & EVE TEGAR )
2025-10-06
1 year ago
NR.EL-01 Wahyu Adi Triono L63-MD-&-453-BL1-&-483-BL5-&-483-BL9 Add greasing motor for FS and LS
Add greasing motor for FS and LS. Measure vibration-noise for FS and LS until vibration below 4 mm/s and noise below 2 gE ( MUHAIMIN & EVE AKPAN & ANDRI )
2025-10-06
1 year ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Fabrication plat form at bottom ER4
Fabrication platform for ER4 at workshop ( ANDRI & MUHAIMIN & DADANG & EDI )
2025-10-06
1 year ago
NR.EL-01 Wahyu Adi Triono L63-BF1 Compartement 1 south side leakage
Check at location found solenoid valve normal function ( MUHAIMIN & ANDRI & EVE AKPAN )
2025-10-06
1 year ago
NR.EL-01 Wahyu Adi Triono 463-KL1 PMR Critical motor Area Kiln
Clean up area motor and filter motor. Measure vibration-noise-temperature for  FS and LS motor. Add grease motor for FS and LS around 25 times and 30 times ( AGUS & DADANG & EVE RIZALDI )
2025-10-06
1 year ago
NR.EL-01 Wahyu Adi Triono 363-RM1 PMR Critical motor Area RM
Clean up area motor and filter motor. Measure vibration-noise-temperature for  FS and LS motor. Add grease motor for FS and LS around 10 times and 15 times ( EDI & ADI & EVE TEGAR )
2025-10-03
1 year ago
NR.EL-01 Wahyu Adi Triono 423-FN1-&-CEMS-ROOM-&-ER3 TPM Area 423 FN1 & CEMS Room & ER3
Take picture before TPM and make report TPM for dash board and save at computer ( RIZAL & AGUS )
2025-10-03
1 year ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Fabrication plat form at bottom ER4
Do fabrication plat form bottom ER4 at workshop ( ANDRI & DADANG )
2025-10-03
1 year ago
NR.EL-01 Wahyu Adi Triono 393-RF6 Install Motor
Install motor at 393 RF6, check ampere motor result ampere motor 2.7 A and 2.9 A from normal 0.9 A. Install original motor and install VSD in order reduce speed motor also pulling cable at ER4 test run motor base on production request for speed motor also measure ampere motor result ampere motor normal ( JAJAT & AGUS & RIZAL & ADI & ANDRI & MUHAIMIN & DADANG & EVE TEGAR  )
2025-10-03
1 year ago
NR.EL-01 Wahyu Adi Triono 393-SC1 Issue motor oil gear leakage
Check at location found there is leakage oil from motor, also found nut at motor is not tight. Do tighten every nut motor and add silicone at part of leakage oil ( EDI & ADI & EVE TEGAR )
2025-10-02
1 year ago
NR.EL-01 Wahyu Adi Triono 393-SC1 Check motor oil gear leakage
Check at location, tighten nut of motor and do clean up area motor. Result not found leakage oil at motor ( EDI )
2025-10-02
1 year ago
NR.EL-01 Wahyu Adi Triono BURNER-FLOOR Lighting burner check and install new lighting
Check lighting at burner floor and install new lighting lamp ( AGUS & MUHAIMIN & DADANG )
2025-10-02
1 year ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Continue fabrication plat form at bottom ER4
Do fabrication plat form for bottom ER4 at workshop ( ANDRI & DADANG )
2025-10-02
1 year ago
NR.EL-01 Wahyu Adi Triono L63-BF1 Check purging not function
Replace 1 membran for purging because bad condition also service coil of solenoid valve and solenoid valve because function bad.  Do replace nut for solenoid valve. Test function purging result normal ( RIZAL & EVE TEGAR & ANDRI )
2025-10-02
1 year ago
NR.EL-01 Wahyu Adi Triono 443-PH1;-L63-RM1;-463-KL1 PMR IR TAD- T Scanner- CCTV - Camera Burner
Clean lens IR TAD, camera burner & Tscanner-flange probe-camera CCTV from dirty of dust use cleaning tools ( EDI & ADI )
2025-10-01
1 year ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Fabrication plat form at bottom ER4
Fabrication plat form at bottom ER4 ( ANDRI & DADANG )
2025-10-01
1 year ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Continue TPM report FI
Print out report FI last report and time line dash board with new form of TPM and install at dash board TPM at workshop ( ADI & EVE TEGAR )
2025-10-01
1 year ago
NR.EL-01 Wahyu Adi Triono ANALYZER-ROOM Clean up area analyzer room
Do clean up area analyzer room from dirty dust and coal use broom and dustpan ( AIMAN )
2025-10-01
1 year ago
NR.EL-01 Wahyu Adi Triono BURNER-FLOOR-AND-CLINKER-SILO WBI hoist and crane
Do WBI hoist and crane area burner floor and clinker silo. Clean up area motor and test function move east-west south-north and up-down result function normal ( EDI & EVE RIZALDI )
2025-10-01
1 year ago
NR.EL-01 Wahyu Adi Triono 473-CC1 Observation area cooler ( issue Ground F ) from M33-WP4 with measurement result normal related other suspected
Do observation area cooler regarding issue ground F of M33 WP4 result normal function ( AGUS & MUHAIMIN )
2025-09-30
1 year ago
NR.EL-01 Wahyu Adi Triono 393-FN3 Signal cable S I/O is failure
Connected signal S of I/O for 393 FN3 test function signal result normal ( RIZAL &  EVE TEGAR & CIVACON )
2025-09-30
1 year ago
NR.EL-01 Wahyu Adi Triono L63-RM1 PMR service analyzer
Clean up flange probe-sample line-filter sample inlet-diaphragm pump-dryer gas pump-filter balston from dirty of coal. Check humidity sensor function and filter humidity result function sensor normal and filter humidity good condition ( EDI & ADI )
2025-09-30
1 year ago
NR.EL-01 Wahyu Adi Triono 463-KL1-AND-BURNER-FLOOR Continue relocation welding point and prepare cable connection burner point + Kiln
Do relocation welding point for kiln and burner floor and connection cable of welding point ( MUHAIMIN & DADANG )
2025-09-30
1 year ago
NR.EL-01 Wahyu Adi Triono 443-FN1 Replace sensor vibration with IFM
Do replace sensor vibration of N1 with IFM test function sensor result normal ( RIZAL & EVE TEGAR & CIVACON )
2025-09-29
1 year ago
NR.EL-01 Wahyu Adi Triono 463-KL1-AND-BURNER-FLOOR Continue relocation welding point and prepare cable connection burner point and Kiln
 Pulling cable and make connection at end side point ( MUHAIMIN & ANDRI & DADANG )
2025-09-29
1 year ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-463-KL1 PMR Service Critical Motor & LSR RM & CM1
Clean up area motor and filter motor. Measure vibration-noise-temperature for FS and LS motor. Add grease motor from 25 times-30 times and 35 times for FS and LS motor ( EDI & EVE RIZALDI )
2025-09-29
1 year ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-2K1 PMR service analyzer
Clean up flange probe-probe-filter sample line-sample line-diaphragm pump-dryer gas pump-filter balston from dirty of dust. Check function humidity sensor and filter humidity, result function humidity good and filter humidity good condition ( RIZAL & EVE TEGAR )
2025-09-29
1 year ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Report also complete PMR and WBI September 2025
Re write PMR critical motor KILN and RM for 1st and 2nd weeks of september 2025 ( JAJAT & ADI )
2025-09-29
1 year ago
NR.EL-01 Wahyu Adi Triono ER4 TPM ER4 repainting green color for floor
Repainting green color for floor at ER4 ( JAJAT & ADI )
2025-09-26
1 year ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Complete data check sheet PMR and WBI month of september 2025
Do complete data check sheet for PMR and WBI month of september 2025 ( ADI )
2025-09-26
1 year ago
NR.EL-01 Wahyu Adi Triono ER4 Gemba TPM ER4
Clean area ER4 for south west from dirty of dust, install cover for panel trafo and tightening cover cable tray.  Repainting door with red color, and floor of ER4 with yellow and red color. Move unsafe good inside ER4 to garbage tank, put support for cable to warehouse behind ER5 ( JAJAT & AGUS & RIZAL & EDI & ADI & ANDRI & AIMAN & MUHAIMIN & DADANG )
2025-09-26
1 year ago
NR.EL-01 Wahyu Adi Triono ELGA-2 Observation leaked ELGA 2
Service leaked at ELGA 2 result test function normal ( RIZAL & ANDRI )
2025-09-26
1 year ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Continue observation and wiring project L1C-TR1
Do wiring for project L1C TR1 ( JAJAT & AGUS )
2025-09-26
1 year ago
NR.EL-01 Wahyu Adi Triono BURNER-FLOOR Continue relocation welding point and prepare cable connection burner point
Do relocation welding point at burner floor and connect cable of welding point ( EDI & MUHAIMIN & DADANG )
2025-09-26
1 year ago
NR.EL-01 Wahyu Adi Triono ER4 Gemba TPM ER4
Clean area ER4 for south west from dirty of dust, install cover for panel trafo and tightening cover cable tray.  Repainting door with red color, and floor of ER4 with yellow and red color. Move unsafe good inside ER4 to garbage tank, put support for cable to warehouse behind ER5 ( JAJAT & AGUS & RIZAL & ADI & ANDRI & MUHAIMIN & AIMAN & DADANG )
2025-09-25
1 year ago
NR.EL-01 Wahyu Adi Triono 463-KL1 Continue Welding Point + put panel welding near 463 MD1 + Prepare Cable connection
Install cable for panel welding at 463 KL1, put cable power at top side near panel welding note wait scafolding to pulling cable power ( MUHAIMIN & DADANG )
2025-09-25
1 year ago
NR.EL-01 Wahyu Adi Triono L1C-TR1 Continue observation and wiring project L1C-TR1
Do observation L1C-TR1 and wiring project tripper ( AGUS & EDI )
2025-09-25
1 year ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Complete data check sheet PMR and WBI month of september 2025
Do complete data check sheet PMR analyzer L63 2K1-L63 2K2-L63 2K3-483 2K1-463 2K1-443 2K1-423 2K1, PMR IR TAD-CCTV-Tscanner-Pyoremeter, PMR hoist & crane, WBI top blending-CT-PH-kiln, WBI bottom blending-kiln-cooler-clinker silo, WBI CM-Truck lift-BC transport-Tripper-Reclaimer coal, WBI feed bin-RM-CT-dust transport-BF month of september 2025 ( JAJAT & ADI )
2025-09-25
1 year ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Upload description L1C-TR1
Do upload description for L1C-TR1 and do laminating for file tripper at workshop ( RIZAL & EVE RIZALDI )
2025-09-24
1 year ago
NR.EL-01 Wahyu Adi Triono CLINKER-SILO Check + Add greasing + Clean up Motor Area Clinker
Check and clean up motor area clinker and add grease motor for FS and LS ( MUHAIMIN & DADANG )
2025-09-24
1 year ago
NR.EL-01 Wahyu Adi Triono L63-RM1 PMR service analyser
Clean up flange probe-sample line-filter sample line-diaphragm pump-filter balston-dryer gas pump from dirty of coal. Check function humidity sensor and  filter humidity result function sensor ok and filter humidity good condition ( ADI & MUHAIMIN & EVE RIZALDI )
2025-09-24
1 year ago
NR.EL-01 Wahyu Adi Triono 473-FN7 Support take motor 473-FN7 from vendor
Do support motor from vendor of 473-FN7 ( EDI & DADANG )
2025-09-24
1 year ago
NR.EL-01 Wahyu Adi Triono 423-2K1 PMR analyzer CEMS
Clean up purge air unit motor and filter purge air unit for Dust Hunter and Flowsic 100-swivel window dust hunter for T/R and R unit and transducer A & transducer B for Flowsic from dirty of dust. Do alignment dust hunter T/R and R dust hunter. Clean up CEMS room, CEMS gas room and filter cabinet MCS 100 E from dirty of dust ( RIZAL & ANDRI )
2025-09-24
1 year ago
NR.EL-01 Wahyu Adi Triono L1C-TR1 Continue observation and wiring project L1C-TR1
Do observation and wiring project for L1C-TR1 ( AGUS & EDI )
2025-09-23
1 year ago
NR.EL-01 Wahyu Adi Triono L1C-TR1 Continue Observation Project L1C-TR1
Do observation project for L1C TR1 ( JAJAT & AGUS )
2025-09-23
1 year ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP-&-463-KL1 Fabrication support lamp + Welding panel and install lighting lamp area kiln
Install lighting lamp at area kiln test on result lighting lamp normal on  and make fabrication support lamp and welding panel at workshop ( MUHAIMIN & ANDRI & DADANG )
2025-09-23
1 year ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-2K1 PMR service analyzer
Clean up flange probe-probe-filter sample line-sample line-diaphragm pump-dryer gas pump-filter balston from dirty of dust use instrument air supply. Check humidity sensor function and filter humidity result function humidity normal and filter humidity good condition. For 463 2K1 clean up motor and filter heat exchanger from dirtyof dust use instrument air supply ( EDI & ADI )
2025-09-22
1 year ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Continue wiring control Radio Link
Wiring control radio link. Ready  to Install ( RIZAL )
2025-09-22
1 year ago
NR.EL-01 Wahyu Adi Triono 463-KL1 Observation replacement lamp without cover area kiln
Do observation instalation  lighting lamp without cover area kiln. Fabrication support for lighting lamp ( MUHAIMIN )
2025-09-22
1 year ago
NR.EL-01 Wahyu Adi Triono 463-KL1-&-473-CC1 PMR Critical motor Kiln and Cooler
Cleaning area motor and filter motor. Measure vibration-noise-temperature for FS and LS. Add grease motor for 35 times-30 times for FS and LS ( AGUS )
2025-09-22
1 year ago
NR.EL-01 Wahyu Adi Triono 363-RM1-&-L63-RM1 PMR Critical motor Raw Mill and Coal Mill
Cleaning area motor and filter motor. Measure vibration-noise-temperature for FS and LS. Add grease motor for 25 times-30 times for FS and LS ( RIZAL )
2025-09-22
1 year ago
NR.EL-01 Wahyu Adi Triono L3A-BC1 Lighting lamp off 2 each
Replace  lighting lamp 2 unit with spare test on result lighting lamp ok ( ANDRI & DADANG )
2025-09-20
1 year ago
NR.EL-01 Wahyu Adi Triono L1C-TR1 Pulling cable 6P x 1.5 mm 3 line from tripper to I/O ER6
Pulling cable 6P x 1.5 mm 3 line around 250 m from tripper to I/O panel ER6 ( JAJAT & AGUS & RIZAL & ADI & MUHAIMIN & ANDRI & DADANG & AIMAN )
2025-09-19
1 year ago
NR.EL-01 Wahyu Adi Triono IDO-TANK Instalation pump
Check at location can not found motor at IDO tank base information from Mr.Jajat motor still at Mr.Nopayadi CBM ( ADI & MUHAIMIN )
2025-09-19
1 year ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Prepare + Wiring RD for L1C-TR1
Do prepare wiring radio link for L1C TR1 test function result ok
2025-09-19
1 year ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Install Support Welding point
Make support for welding panel at workshop ( ANDRI & DADANG )
2025-09-19
1 year ago
NR.EL-01 Wahyu Adi Triono L1C-TR1 Obsevation / prepare for pulling cable
Observation for job pulling cable at L1C TR1 ( AGUS & EDI & MUHAIMIN )
2025-09-18
1 year ago
NR.EL-01 Wahyu Adi Triono 443-PH1-CYCLONE-4 Add tubing cone C4A
Add tubing of cone C4A ( ANDRI & DADANG )
2025-09-18
1 year ago
NR.EL-01 Wahyu Adi Triono ER3-&-ER4- PMR Clean Up MCC ER
Clean up electric room 3 & electric 4 top and bottom side, MCC from dirty of dust use brush and mop electric room ( AIMAN )
2025-09-18
1 year ago
NR.EL-01 Wahyu Adi Triono 393-FV9 Check / install double tipping valve new control
Install double tipping valve for new control test function result normal ( EDI & MUHAIMIN )
2025-09-17
1 year ago
NR.EL-01 Wahyu Adi Triono 473-HC1 Service pipe lighting back of HC
Test on lighting lamp result normal lighting lamp area 473 HC1 all on ( AGUS & ADI & MUHAIMIN & DADANG )
2025-09-17
1 year ago
NR.EL-01 Wahyu Adi Triono 473-GQ1 Install lighting lamp north side
Make support lighting lamp at workshop. Install lighting lamp test on result lighting lamp normal ( AGUS & ADI & MUHAIMIN & DADANG  )
2025-09-17
1 year ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Prepare box and PS 12 VDC 20A
Prepare box for power supply 12 VDC 20A, install power supply and cable power input bring panel to CCR server room give to Mr.Muklas ES ( MUHAIMIN & ADI )
2025-09-17
1 year ago
NR.EL-01 Wahyu Adi Triono 463-2K1-&-443-2K1 PMR Service Analyser
Clean up flange probe-probe-sample line-filter sample line-diaphragm pump-fiter balston-dryer gas pump from dirty of dust. Check function humidity sensor and filter humidity result function sensor normal and filter humidity good condition ( RIZAL & ANDRI & EVE HADIF & EVE RIZALDI )
2025-09-16
1 year ago
NR.EL-01 Wahyu Adi Triono 363-MD1 Clean up and check carbon brush
Clean up carbon brush room, measure long all carbon brush, replace 8 carbon brush with spare carbon brush ( AGUS )
2025-09-16
1 year ago
NR.EL-01 Wahyu Adi Triono 363-SR1 Observation cracked at base plate motor
Check at location found cracked at support 363 SR1 ( MUHAIMIN & DADANG )
2025-09-16
1 year ago
NR.EL-01 Wahyu Adi Triono WORK-SHOP Closing WO Electric 1
Do closing WO for date 8-9-25 to 12-9-25 ( ADI )
2025-09-16
1 year ago
NR.EL-01 Wahyu Adi Triono L63-RM1-&-L1C-TR1-&-L1C-TL1 WBI Elect & Ins & Check I/O CM, Sump T&T
Do WBI electrical and instrumentation and check I/O coal mill, sump T&T. Measure vibration-noise motor FS and LS ( EDI )
2025-09-16
1 year ago
NR.EL-01 Wahyu Adi Triono 483-BL7-AND-473-FA2 Install lighting lamp
Install lighting lamp area blower and motor. Test on result ok lighting lamp on ( MUHAIMIN & DADANG )
2025-09-16
1 year ago
NR.EL-01 Wahyu Adi Triono 423-2K1 PMR Service CEMS
Clean up purge air unit motor and filter purge air unit, swivel window R unit & T/R unit of dust hunter also flange with tube and alignment dust hunter, transducer A & transducer B of flowsic, CEMS room, filter cabinet MCS 100 E and gas bottle room from dirty of dust ( RIZAL & ANDRI )